← Opportunities

Southern California 511 Web & Mobile App Modernization and Operations

Funder
Los Angeles County Service Authority for Freeway Emergencies (LA SAFE) payout history not checked
Type / status
rfp · closed
Amount
—
Deadline
2026-06-17 (past)
“Proposals for the above-identified Solicitation must be submitted via email submission to bids@metro.net ; Cc: anayag@metro.net and received by Metro no later than 2:00 p.m. PDT on Wednesday, June 17, 2026.”
Ecosystems
Categories
dev toolinginfracommunity
Tech stack
Apply
https://media.governmentnavigator.com/media/bid/1778884650_5_15_202-PS140976.pdf
Source
https://media.governmentnavigator.com/media/bid/1778884650_5_15_202-PS140976.pdf
Fit
10% · poor fit · The team's expertise in ZK, privacy, and blockchain infrastructure is entirely unrelated to modernizing a regional traveler information system for a government agency.
Trust
79% · model self-report 92% · first seen 2026-11-17 · v1
Verified
2026-11-17 · by extraction

LA SAFE seeks a certified Small Business Enterprise to modernize and operate the Southern California 511 web and mobile applications over a three-year contract. The scope includes technical support, project management, and ongoing operations for the regional traveler information system. Proposals must be submitted via email by the deadline and include SBE certification documentation.

Eligibility: Must be a Metro-certified Small Business Enterprise (SBE) at time of proposal due date; must perform a commercially useful function (at least 30% of total contract cost with own workforce); must provide SBE certification letters and subcontractor list.

Pipeline

Override status:

Funder track record · does Los Angeles County Service Authority for Freeway Emergencies (LA SAFE) actually pay grants?

payout history not checked · last check failed: web search unavailable: 6 of 6 searches failed

Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.

Trust breakdown (2/3 checkable facts verified)

SignalWeightResultNote
deadline0.35100%quoted in source
apply link0.0750%link not in source
funder0.075100%named in source
source quality0.1550%social or search hit
model confidence0.192%model self-report

Fit breakdown (against the ORG_* profile)

SignalWeightResultNote
model fit0.510%model rated 10%
ecosystem overlap0.250%none vs aleo
category overlap0.1533%dev_tooling, infra, community vs zk, privacy, infra, dev_tooling, security, interoperability
tech overlap0.10%none vs rust, leo, zk

Sources (1)

RoleDocumentFromFetched
primarySouthern California 511 Web & Mobile App Modernization and OperationsWeb discovery: ecosystem sweep2026-11-17

History (1)

vChangedFields
12026-11-17created

Extracted text

Los Angeles County
Service Authority for Freeway Emergencies
Southern California 511 Web & Mobile App Modernization and Operations
RFP No. PS140976 Issued: 05.14.2026

This page is intentionally blank

LA SAFE
RFP No. PS140976
Issued: 05.14.2026 TABLE OF CONTENTS
i
TABLE OF CONTENTS
SECTION 1 – LETTER OF INVITATION ..................................................................... 1-0
LETTER OF INVITATION SUPPLEMENT RFP (NON - FEDERAL)......................................1-4
SECTION 2 – CONTRACT DOCUMENTS .................................................................. 2-0
FIRM FIXED UNIT RATE CONTRACT .................................................................................2-1
ARTICLE 1: CONTRACT DESCRIPTION...................................................................................... 2-2
ARTICLE 2: WORK TO BE PERFORMED .................................................................................... 2-2
ARTICLE 3: CONTRACT DOCUMENTS ORDER OF PRECEDENCE......................................... 2-2
ARTICLE 4: DEFINITIONS AND INTERPRETATIONS ................................................................. 2-3
ARTICLE 5: PAYMENTS................................................................................................................ 2-8
ARTICLE 6: PRICING AGREEMENT........................................................................................... 2-10
ARTICLE 7: PERIOD OF PERFORMANCE ................................................................................ 2-10
ARTICLE 8: LIMITATION OF FUNDS.......................................................................................... 2-10
ARTICLE 9: CERTIFICATIONS ................................................................................................... 2-10
ARTICLE 10: PERMITS AND RESPONSIBILITIES ..................................................................... 2-10
ARTICLE 11: INSURANCE Ì....................................................................................................... 2-11
ARTICLE 12: EQUAL OPPORTUNITY Ì .................................................................................... 2-11
ARTICLE 13: INDEMNIFICATION Ì............................................................................................ 2-11
ARTICLE 14: STANDARD OF PERFORMANCE Ì..................................................................... 2-12
ARTICLE 15: CONTRACTOR STATUS Ì ................................................................................... 2-12
ARTICLE 16: SUBCONTRACT CONSIDERATIONS Ì............................................................... 2-12
ARTICLE 17: THIRD PARTIES Ì ................................................................................................ 2-13
ARTICLE 18: LA SAFE KEY PERSONNEL .................................................................................. 2-13
ARTICLE 19: CONTRACTOR KEY PERSONNEL ....................................................................... 2-13
ARTICLE 20: APPROVED SUBCONTRACTORS AND SUPPLIERS.......................................... 2-14
ARTICLE 21: NOTIFICATION ....................................................................................................... 2-14
ARTICLE 22: SBE PARTICIPATION ............................................................................................ 2-14
ARTICLE 23: DELIVERY............................................................................................................... 2-15
ARTICLE 24: AUDIT RIGHTS ....................................................................................................... 2-15
ARTICLE 25: PROGRESS REPORTS ......................................................................................... 2-15
ARTICLE 26: INSPECTION OF WORK, ACCEPTANCE Ì......................................................... 2-15
ARTICLE 27: LIQUIDATED DAMAGES........................................................................................ 2-16
ARTICLE 28: RIGHTS IN PROPERTY Ì..................................................................................... 2-16
ARTICLE 29: TECHNICAL DATA AND INTELLECTUAL PROPERTY Ì ................................... 2-18
ARTICLE 30: RIGHTS IN WORK PRODUCTS Ì ........................................................................ 2-19
ARTICLE 31: SOFTWARE LICENSING AGREEMENT AND PROVISIONS FOR USEÌ........... 2-20
ARTICLE 32: WARRANTY Ì ....................................................................................................... 2-20
ARTICLE 33: FINAL PAYMENT.................................................................................................... 2-21
ARTICLE 34: ASSIGNMENT Ì .................................................................................................... 2-22
ARTICLE 35: PUBLIC RECORDS ACT Ì ................................................................................... 2-22
ARTICLE 36: PROHIBITED INTERESTS Ì ................................................................................ 2-22
ARTICLE 37: UNAUTHORIZED WORK Ì................................................................................... 2-23
ARTICLE 38: CHANGES Ì .......................................................................................................... 2-23
ARTICLE 39: NOTICE OF CLAIMS .............................................................................................. 2-23
ARTICLE 40: DISPUTES .............................................................................................................. 2-24
ARTICLE 41: NO WAIVER............................................................................................................ 2-24
ARTICLE 42: STOP WORK Ì...................................................................................................... 2-24
ARTICLE 43: TERMINATION FOR CONVENIENCE Ì............................................................... 2-25
ARTICLE 44: TERMINATION FOR DEFAULT Ì......................................................................... 2-25
ARTICLE 45: CONFIDENTIALITY Ì............................................................................................ 2-26
ARTICLE 46: EMPLOYEE DISCLOSURE RIGHTS ..................................................................... 2-26
ARTICLE 47: PROJECT EMPLOYEE CONFIDENTIALITY AGREEMENT Ì............................. 2-26

LA SAFE
RFP No. PS140976
Issued: 05.14.2026 TABLE OF CONTENTS
ii
ARTICLE 48: ENGLISH REQUIREMENTS Ì.............................................................................. 2-27
ARTICLE 49: ADVERTISING, PUBLICITY, AND NEWS RELEASESÌ ...................................... 2-27
ARTICLE 50: CONTINUITY OF SERVICES Ì ............................................................................ 2-27
ARTICLE 51: GOVERNING LAW ................................................................................................. 2-28
ARTICLE 52: SEVERABILITY....................................................................................................... 2-28
ARTICLE 53: TIMELINESS ........................................................................................................... 2-28
ARTICLE 54: SPECIAL CONDITIONS (RESERVED) .................................................................. 2-28
ARTICLE 55: ENTIRE AGREEMENT ........................................................................................... 2-29
ATTACHMENT A - SCOPE OF SERVICE ...................................................................................... 2-30
3.6 Project Management & Development Plan....................................................................2-38
ATTACHMENT B – PRICING AGREEMENT ................................................................................... 2-43
ATTACHMENT C – INSURANCE REQUIREMENTS ...................................................................... 2-44
ATTACHMENT D – PAYMENT CERTIFICATION ........................................................................... 2-46
ATTACHMENT E - REQUEST FOR FINAL PAYMENT................................................................... 2-47
ATTACHMENT G - DIVERSITY & ECONOMIC OPPORTUNITY DEPARTMENT SBE CONTRACT
COMPLIANCE MANUAL................................................................................................ 2-48
ATTACHMENT H – RELEASE OF CLAIMS .................................................................................... 2-73
ATTACHMENT I – APPROVED SUBCONTRACTORS AND SUPPLIERS..................................... 2-74
SECTION 3 – PROPOSAL DOCUMENTS .................................................................. 3-0
INSTRUCTIONS TO PROPOSERS......................................................................................3-1
IP-01 PRE-QUALIFICATON REQUIREMENTS ........................................................................ 3-1
IP-02 BIDDERS LIST FORM ..................................................................................................... 3-1
IP-03 EXAMINATION OF RFP DOCUMENTS .......................................................................... 3-2
IP-04 INTERPRETATION OF RFP DOCUMENTS.................................................................... 3-2
IP-05 COMMUNICATION WITH LA SAFE ................................................................................ 3-2
IP-06 AMENDMENT................................................................................................................... 3-2
IP-07 PREPARATION OF SUBMITTAL..................................................................................... 3-3
IP-08 MODIFICATIONS AND ALTERNATIVE PROPOSALS ................................................... 3-3
IP-09 SIGNING OF PROPOSAL AND AUTHORIZATION TO NEGOTIATE ............................ 3-3
IP-10 SUBMISSION OF PROPOSAL ........................................................................................ 3-4
IP-11 PROPOSAL EVALUATION PROCESS ........................................................................... 3-4
IP-12 WITHDRAWAL OF SUBMITTAL...................................................................................... 3-4
IP-13 PRE-AWARD AUDIT........................................................................................................ 3-5
IP-14 LA SAFE RIGHTS ............................................................................................................ 3-5
IP-15 PUBLIC RECORDS ACT ................................................................................................. 3-6
IP-16 DISQUALIFICATION OF PROPOSERS .......................................................................... 3-6
IP-17 FILING OF PROTESTS.................................................................................................... 3-6
SBE INSTRUCTIONS TO PROPOSERS AND FORMS (RFP-SA) .......................................3-8
ATTACHMENT 1- FORM 1 - PROPOSED SUBCONTRACTORS & SUPPLIERS ......................... 3-15
ATTACHMENT 1- FORM 2 - COMMERCIAL USEFUL FUNCTION AFFIDAVIT ............................ 3-19
ATTACHMENT 1- FORM 3 - BUSINESS DATA SHEET ................................................................. 3-20
ATTACHMENT 1- FORM 4 – SBE AFFIRMATION.......................................................................... 3-22
ATTACHMENT 1- FORM 5 – BIDDER LIST FORM BE AFFIRMATION ......................................... 3-23
ATTACHMENT 1- FORM 6 – SBE REGULAR DEALER DISTRIBUTOR AFFIRMATION FORM .. 3-24
SUBMITTAL REQUIREMENTS........................................................................................................ 3-26
ATTACHMENT 3 - EVALUATION CRITERIA .................................................................................. 3-36
SECTION 4 – PROPOSAL FORMS ............................................................................ 4-0
ATTACHMENT 2A - FORM 60 AND INSTRUCTIONS ...................................................................... 4-1
ATTACHMENT 2A - FORM 60 ........................................................................................................... 4-4
ATTACHMENT 2 – PRICING SCHEDULE ........................................................................................ 4-6
ATTACHMENT 5 - PROPOSAL LETTER .......................................................................................... 4-7
ATTACHMENT 6 - FORM 54 ........................................................................................................... 4-11

LA SAFE
RFP No. PS140976
Issued: 05.14.2026 TABLE OF CONTENTS
iii
ATTACHMENT 7 - FORM 55 ........................................................................................................... 4-12
ATTACHMENT 8 – REFERENCE CHECK ...................................................................................... 4-13
LA SAFE TRAVEL AND EXPENSE GUIDELINES .......................................................................... 4-14
NO PROPOSAL SUBMITTAL FORM............................................................................................... 4-17
SECTION 5 – REQUIRED CERTIFICATIONS ............................................................ 5-0
ATTACHMENT 9 - ETHICS DECLARATION ..................................................................................... 5-1
ATTACHMENT 10 – GENERAL CERTIFICATIONS.......................................................................... 5-7
ATTACHMENT 11 - INSURANCE REQUIREMENTS CERTIFICATION........................................... 5-9
ATTACHMENT 12 - NONCOLLUSION AFFIDAVIT......................................................................... 5-10
ATTACHMENT 13 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655 ......................... 5-11
SECTION 6 - CODES OF CONDUCTÌÌ ...................................................................... 6-1
ATTACHMENT FÌ - SAFE CODES OF CONDUCTÌ ................................................................... 6-1
Ì All Articles, Subarticles, or portions of the Contract noted by an asterisk (Ì) shall be
included in (flow-down to) all Subcontracts of any tier.

SECTION 1 – LETTER OF INVITATION

This page is intentionally blank

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
1-1
LOI - RFP
PRO FORM 028
REVISION DATE: 11.02.09
May 14, 2026
ATTENTION: Prospective Proposer
SUBJECT: REQUEST FOR PROPOSALS (RFP) FOR RFP No. PS140976
SOUTHERN CALIFORNIA 511 WEB & MOBILE APP MODERNIZATION
AND OPERATIONS
NOTE: THIS IS A SMALL BUSINESS ENTERPRISE (SBE) SET-ASIDE
PROCUREMENT. FOR INFORMATION ON THE PROGRAM, VISIT
METRO.NET/ABOUT/DOING-BUSINESS-WITH-METRO/
The Los Angeles County Service Authority for Freeway Emergencies (LA SAFE) has
established a contracting opportunity to provide technical support and project management
services as outlined in the Scope of Service. The resultant Contract, if awarded, will be
state/locally funded, and is subject to fiscal year funding.
LA SAFE is an independent public agency established pursuant to California Streets and
Highways Code Sections 2550 et. seq. LA SAFE obtains administrative support from the
Los Angeles County Metropolitan Transportation Authority (Metro) including procurement
services, inclusive of SBE programs.
You are requested to submit a proposal to furnish all of the labor, materials, and other related
items required for the performance of a contract resulting from RFP No. PS140976141039
on a Firm Fixed, Unit Rate Price basis. This Contract will be for a term of three (3) years.
Proposal Due Date:
Proposals for the above-identified Solicitation must be submitted via email submission to
bids@metro.net ; Cc: anayag@metro.net and received by Metro no later than 2:00 p.m.
PDT on Wednesday, June 17, 2026.
The Submittal Requirements can be found in Section 3 –Proposal Documents-page 3-
23.
Proposals shall be submitted via email and must adhere to the requirements stated below:
A. Subject line must contain the LACMTA Contract Administrator First and Last name,
and the RFP Number. If more than one email is required for proposal submittal, the
bidder/proposer must indicate in the subject line, submittal 1 of 5, 2 of 5, etc.
B. Proposals shall be submitted no later than the proposal due date and time.
C. Individual email submittals should be no larger than 20MB.

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
1-2
LOI - RFP
PRO FORM 028
REVISION DATE: 11.02.09
D. It is recommended that proposers send their email with a Delivery and Read receipt
for their records. Additionally, proposers should send a verification email to the
named Contract Administrator of the RFP after the email submission of proposal to
bids@metro.net. The verification email should indicate that a proposal has been
submitted for RFP No. PS141039 on X number of emails.
Pre-Proposal Conference:
A virtual Pre-Proposal Conference will be held on Thursday, May 21, 2026 at 1:00 p.m.
PDT. See details below. Attendance is not mandatory to be considered for award of a
contract; however, attendance is encouraged.
Pre-Proposal conference
Time and Date: Thursday, May 21, 2026, at 1:00 p.m. PDT.
Location: Virtual
Link and Phone
Number:
Virtual Pre-Proposal Conference Link:
Microsoft Teams meeting
Join: Join Now
Meeting ID: 270 245 878 891 137
Passcode: A9C8t9PA
Dial in by phone
+1 213-279-1001,,521137126# United States, Los Angeles
Find a local number
Phone conference ID: 521 137 126#
Questions:
Questions are to be submitted to anayag@metro.net by 2:00 P.M on Thursday May 28,
2026.
Clarifications
Clarifications will be sent on Friday June 5, 2026.
Proposal Evaluation:
Proposals will be evaluated in accordance with the Evaluation Criteria listed in Section 3 –
Proposal Documents.
Scope of Service
This solicitation incorporates the Scope of Service (SOS) document(s) as an attachment with
the same force and effect as if it were provided in this solicitation in full text. Please see
Attachment A for the full text of the Scope of Service document(s).
Availability of Solicitation Documents:
The RFP documents available for review on the Internet at “Metro Vendor Portal”

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
1-3
LOI - RFP
PRO FORM 028
REVISION DATE: 11.02.09
Communication with LA SAFE:
All communications in connection with this RFP shall be provided as follows:
LA SAFE
x Gabriel Anaya, Contract Administrator - Email: anayag@metro.net
RFP No. PS140976
x Diversity & Equal Opportunity, (213) 922-2600
x Ethics or Lobbyist Registration Information, (213) 922-2900
If after review of this RFP a decision is made to not submit a proposal, please complete the
NO PROPOSAL SUBMITTAL Form found in Section 4 and submit to the Contract
Administrator via email (anayag@metro.net).
Prospective proposers are advised that short-list interviews may be conducted in the
evaluation process during the week of July 13, 2026.
Basis of Award:
The Contract award will be made to the proposer whose proposal meets the requirements of
the RFP and is most advantageous to the LA SAFE based upon the stated Evaluation
Criteria. LA SAFE reserves the right to reject any or all proposals, to waive informalities or
irregularities to the extent permitted by law in any proposal received, and to be the sole judge
of the merits of the respective proposal received.
Scope of Service:
This solicitation incorporates the Scope of Service (SOS) documents under Attachment A.
SBE Requirements:
THIS IS A SMALL BUSINESS ENTERPRISE (SBE) SET-ASIDE PROCUREMENT. FOR
INFORMATION ON THE SET-ASIDE PROGRAM, VISIT METRO.NET/ABOUT/DEOD
Issued by:
Los Angeles County Service Authority for Freeway Emergencies
Gabriel Anaya
Senior Contract Administrator

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
1-4
LOI - SUPPL SBE/DVBE (RFP) STATE LOCAL
PRO FORM 032B
REVISION DATE: 02.20.15
LETTER OF INVITATION SUPPLEMENT RFP (NON - FEDERAL)
Proposers are hereby notified that:
This project is funded, in whole or in part, with non-federal funds and will comply with
Metro’s Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise
(DVBE) Program requirements. Metro shall not discriminate on the basis of race, color,
national origin, or sex in the award and performance of any non-federally funded contract
or in the administration of its SBE program.
Please note: Proposers are notified of changes made to this Invitation Supplement.
The box checked below is applicable for this contract:
A. Metro has determined that this solicitation is a race neutral “Small Business Enterprise
Set-Aside” project, pursuant to the Metro SBE Program Race-Neutral SBE Set-Aside
Policy:
1. Offerors are hereby notified that bids or proposals for this state and/or locally funded
project shall only be considered from certified SBE Firms on accordance with Metro
SBE Certification requirements.
2. Offerors must be certified by Metro as an SBE at the time of bid or proposal due date
to be eligible for a set-aside contract award. Offeror shall provide, as part of its
bid/proposal, copies of SBE certification letters issued by Metro.
3. Any firm seeking to be certified as an SBE shall comply with Metro’s SBE
certification process detailed in Metro’s website at Small Business Prime Program
4. Offerors must perform a commercially useful function (CUF) during the performance
of the contract. An SBE is presumed to be performing a CUF when it performs and
exercises responsibility for at least thirty percent (30%) of the total cost of the
contract work with its own workforce.
5. Offerors shall provide Metro, as part of its bid/proposal, a complete list (including
names and addresses) of all subcontractors (SBE and non-SBE) who will perform any
portion of the contract work. Instructions to Offerors provide the SBE Set-Aside
Forms that must be completed and submitted by all Offerors at time of bid or proposal
due date.
B. METRO HAS RECOMMENDED AN SBE/DVBE GOAL FOR THIS PROJECT IN THE
PERCENTAGE OF:
____ Percent (XX %) of the Total Contract Price
1. The SBE/DVBE goal is inclusive of a (XX%) SBE goal and a (X%) DVBE goal.
2. For an Offeror to be considered responsive to the SBE/DVBE goal, it must document
that they obtained enough SBE/DVBE participation to meet or exceed the goal at

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
1-5
LOI - SUPPL SBE/DVBE (RFP) STATE LOCAL
PRO FORM 032B
REVISION DATE: 02.20.15
time of proposal due date. If the SBE/DVBE goal is not met at the time of proposal
submittal, Offerors must submit Good Faith Efforts (GFE) documentation with its
proposal. Offerors determined to have not adequately documented GFE will be
deemed non-responsive to the SBE/DVBE goal. Offerors are referred to the
SBE/DBVE Instructions to Proposers for additional GFE requirements.
3. Offerors shall provide Metro, as part of its proposal, a complete list (including names
and addresses) of all subcontractors who will perform any portion of the required
scopes of work. Offerors shall include the scope of work and dollar amount(s)
committed to each subcontractor.
4 SBE/DVBE Instructions provide guidelines on how SBE/DVBE commitments will be
counted toward the goal and designate the SBE/DVBE Commitment Forms that must
be completed and submitted by all Offerors by the proposal due date.
6. The level of SBE/DVBE participation Offerors commit to in its proposal becomes
the Offeror’s SBE/DVBE contract commitment. The SBE/DVBE commitment will be
listed in the Special Provisions of the contract and shall be enforced by Metro. After
award, SBE/DVBE commitments shall apply to contract options, changes and/or
modifications. Metro will monitor SBE/DVBE commitments throughout the contract
term, as described in the Contract Compliance Manual (Non-Federal), General
Conditions and Special Provisions of the contract.
7. Firms must be SBE and/or DVBE certified by the proposal due date to be counted
toward the listed contract goal. Metro will accept the following SBE and DVBE
certifications from the below listings:
A. Metro certified Small Business Enterprise firms: A list of Certified SBE firms
was provided in the RFP for your convenience, and shall be used to assist
with outreach efforts. You may also locate Metro SBE firms for outreach
through the Metro SBE Query Directory at
http://smallbusinessquery.metro.net/main
B. Disabled Veteran Business Enterprise: The California Department of General
Services (DGS)- DVBE Directory can be found and used for outreach on the
DGS website at https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
C. Offerors shall submit, as part of its proposal copies of all SBE/DVBE
certification letters.
C. A SBE/DVBE GOAL WAS NOT RECOMMENDED FOR THIS PROJECT
Pursuant to the SBE/DVBE Program, if the Proposer identifies subcontracting
opportunities in the solicitation process or during the performance of the contract, Metro
expects the Proposer to afford equal opportunities available to SBE and DVBE firms.

SECTION 2 – CONTRACT DOCUMENTS

This page is intentionally blank

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-1 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
LOS ANGELES COUNTY SERVICE AUTHORITY FOR FREEWAY EMERGENCIES
CONTRACT NO. RFP No. PS140976
SOCAL 511 TRAVELERS INFORMATION SYSTEM VOICE SERVICES
FIRM FIXED UNIT RATE CONTRACT
BETWEEN
LOS ANGELES COUNTY SERVICE AUTHORITY FOR FREEWAY EMERGENCIES
AND
____________________________________________________________________
(NAME OF CONTRACTOR TO BE FILLED IN AT TIME OF AWARD)
TO BE FILLED IN AT TIME OF AWARD
EFFECTIVE DATE

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-2 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
LOS ANGELES COUNTY SERVICE AUTHORITY FOR FREEWAY EMERGENCIES
CONTRACT NO: RFP No. PS140976
SOUTHERN CALIFORNIA 511 WEB & MOBILE APP MODERNIZATION AND OPERATIONS
FIRM FIXED, UNIT RATE CONTRACT
Between
LOS ANGELES COUNTY SERVICE AUTHORITY FOR FREEWAY EMERGENCIES
ONE GATEWAY PLAZA
LOS ANGELES, CA 90012-2952
and
(NAME OF CONTRACTOR TO BE FILLED IN AT TIME OF AWARD)
ADDRESS
CITY, STATE, ZIP
______________________________________________________________________
ARTICLE 1: CONTRACT DESCRIPTION
This Contract is entered into by and between the Los Angeles County Service Authority for
Freeway Emergencies (LA SAFE) and ___________________________________ (Contractor)
for the work described in Article 2. LA SAFE expressly reserves the right to contract for
performance of the Work described herein through other Contractors.
ARTICLE 2: WORK TO BE PERFORMED
Contractor shall perform the Work as is more fully described in the Scope of Service
(Attachment A), to provide to LA SAFE’S Project Management technical support services.
ARTICLE 3: CONTRACT DOCUMENTS ORDER OF PRECEDENCE
A. This Contract includes this Form of Contract and the other following Contract Documents
and Attachments, which are incorporated herein and made a part of this Contract.
B. Except as otherwise specified herein, in the event of any conflict the precedence of the
Contract Documents shall be as follows:
1. Amendments (later Amendments having precedence over earlier Amendments), with
each Amendment taking its order of precedence from the document it modifies.

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-3 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
2. Special Conditions
3. Contract Terms and Conditions.
4. Scope of Service (Attachment A)
C. An Amendment or Change to this Contract shall take its precedence from the term it
amends. All other documents and terms and conditions shall remain unchanged.
ARTICLE 4: DEFINITIONS AND INTERPRETATIONS
Capitalized terms, abbreviations and symbols used in this Contract are defined in this Article.
Additional terms may be defined in the Special Provisions or the Scope of Service.
A. Definitions. The following terms used in this Contract are defined below:
Acceptance: Documentation prepared by LA SAFE or its Authorized
Representative attesting to the completion of all of the
Services under the Contract or specified portion thereof.
Amendment: A unilateral written order by LA SAFE’s Contracting Officer
directing a Change (also defined as Change Order (CO)).
Approve: LA SAFE written confirmation of documents presented by
and/or actions of the Contractor related to the Services
under the Contract.
Applicable Laws: “Applicable Laws” means all statutes, ordinances,
regulations, policies and guidelines (including, without
limitation, Environmental Laws and Disability Laws)
enacted by Governmental Authorities, codes adopted or
promulgated by Governmental Authorities (including,
without limitation, building and health and safety codes),
lawful orders of Governmental Authorities and common
law, including, but not limited to, principles of equity
applied by the courts, which are in effect at the time the
Services or other obligations that are required under or in
connection with the performance of this Contract, and
relevant and applicable to the Scope of Service under the
Contract, including without limitation all of the Regulatory
Requirements.
Authorize: LA SAFE’s written permission to Contractor for actions to

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-4 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
be completed.
Authorized
Representative:
Person or firm empowered to act for or in the place of the
named business or governmental entity.
Chief Executive
Officer:
The Chief Executive Officer (CEO) of LA SAFE.
Change: Substitutions, additions, or deletions which result in
revisions to the Contract. Change does not mean work
performed by the Contractor to correct defective Services
caused by the Contractor's negligent acts, errors or
omissions.
Claim: A written demand by one of the Contracting Parties for:
1. Time extension; and/or
2. Payment of money.
Consultant: The person, firm, or corporation supplying the Work under
the Contract, also defined as the Contractor.
Contract Documents: The Contract Documents consist of the Form of Contract,
General Conditions, Special Provisions, Regulatory
Requirements, Statement of Services, manuals,
certifications, specifications, and all other terms,
conditions, requirements and directions that collectively
constitute the obligations of the Contractor in the
performance of the Services, including all exhibits,
attachments, appendices, and amendments to the
foregoing and all Modifications and Change Orders. Task
Orders are Contract Documents when fully executed and
issued by LA SAFE to the Contractor.
Contracting Officer: The CEO or a designated representative who is Authorized
and empowered to execute contracts, contract
Modifications, Change Orders, and agreements on behalf
of LA SAFE.
Correct Invoice: An invoice submitted by Contractor with all required
supporting documentation and accepted by LA SAFE
project management.
Cure Notice: Written notice from LA SAFE to the Contractor to correct
Services performed not in conformance with the Contract.

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-5 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
Days: Unless otherwise stated, "days" shall mean calendar days.
When a required submittal falls on a non-business day,
submittal shall be on the next business day.
Equipment a. Any and all machinery, systems, assemblies, sub-
assemblies, products, material fittings, devices,
appliances, fixtures, apparatuses, hardware,
Software, Source Code, Object Code, Data,
Documentation, supplies and parts used by the
Contractor or provided by the Contractor to LA SAFE
pursuant to this Contract.
b. Except as the term is used in the bullet above of this
definition, the combination of all of the Components
and Work in a fully operating whole, and functioning
in full compliance with all of the terms and conditions
of this Contract.
Goods: Equipment, material and/or products required to perform
the Services. Goods may be furnished by LA SAFE or
required to be furnished by the Contractor.
Government
Authorities:
Any federal, state, or local government and any political
subdivision or any governmental, quasi-governmental,
judicial, public or statutory instrumentality, administrative
agency, authority, body or entity.
Home Office: The home office(s) of the Contractor’s firm.
Invoice: A request for payment for Services performed.
LACMTA: The Los Angeles County Metropolitan Transportation
LACMTA (LACMTA) or its successor, or any successor in
interest, or its Authorized Representative.
LA SAFE Officer: LA SAFE Board Members and any individual Authorized to
act for LA SAFE.
Modification: Any written addition, deletion, adjustment or alteration to
the Contract, whether arising out of the unilateral exercise
by LA SAFE of any right under the Contract, or by mutual
agreement/action executed by the Parties. A Modification
may be unilateral or bilateral, and includes Change Orders,
adjustments in quantities, extensions of time,
administrative changes and adjustments, and all other
actions and events that result in an alteration, correction or
adjustment of the Contract.

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-6 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
Notice of Termination: Written notice from LA SAFE to the Contractor terminating
the Contract, or a portion thereof, either for convenience of
LA SAFE or for default due to the Contractor's failure to
perform its contractual obligations.
Parties: LA SAFE and the person(s), governmental entities, or
business entities entering into the Contract.
Period of Performance: The total time period allowed for completion of all Services
under the Contract
Program: Existing and planned collective projects that are and will be
operated by LA SAFE.
Progress Reports: Contractor status reports required for submittal on periodic
basis as delineated in the SOW or Schedule.
Project: The Contract Scope of Services for a portion of LA SAFE
Programs as defined in the Form of Contract
Request for
Substitution:
Goods, service(s), system(s) or subcontractor(s) that the
Contractor requests to use in lieu of that specified in the
Contract.
Schedule: A time phased Project execution plan that identifies all
activities necessary to implement a given Project and
Contract in a logical time phased manner. The Contract
Schedule provides the start and completion date of each
activity and its Milestones. The Project Schedule shall
include the Milestones for the entire Project.
Scope of Services
(Services):
Description of the sum total of productive and operative
efforts used to generate the results specified, indicated, or
implied in the Contract, including all technical and
professional services, and Goods used during all related
activities whether originally or subsequently Scheduled.
Special Provisions: Requirements applicable to the Contract that invoke,
modify, and/or supplement the General Conditions
State: The State of California.
Subcontractor: Any individual, firm, partnership, corporation, joint venture
or combination thereof, other than employees of the
Contractor, that enters into a legal agreement with the
Contractor to furnish Services, labor or Goods as a portion
of the Services. Unless otherwise specified,
Subcontractors includes Subcontractors of any tier.

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-7 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
Supplier: Any individual, firm, partnership, corporation, joint venture,
or combination thereof, other than employees of the
Contractor, or Subcontractor that enters into a legal
agreement with the Contractor and that manufactures,
distributes or furnishes tangible Goods as a portion of the
Services, with Services usually limited to delivery and/or
required testing.
Work a. The goods, Equipment and materials, and all
productive/operative efforts and services provided to
generate the results specified, indicated or implied in
the Contract including all technical and professional
services to complete the project described in the
Scope of Service; may also refer to work in progress.
b. The actual products and results specified, indicated,
or implied in the Contract, including all required
Documentation;
c. Where the product is the manufacture, construction
or furnishing of Equipment, the delivery of the fully
functional product, including all required
documentation, in accordance with the Contract;
d. All Schedules and Work plans;
e. All Goods Furnished and used to complete the
Equipment and Work described in the Contract.
f. Work in progress, including without limitation the
Contractor’s calculations, supporting materials, data,
and information concerning the Work and other
documentation, including computer programs and
printouts, data regarding remedial efforts and actions
taken by Contractor in assessing failed Acceptance
of any Work, and all other information that LA SAFE
determines is necessary or desirable for its
inspection and review.
Worksite: The location where the Contractor's Services will be
performed as defined in the Contract. The term may
include the location of work performed by others (i.e., the
construction site of a Project).
B. Review and Explanation. The Contractor shall carefully study all contract documents,
promptly notify LA SAFE of all errors, inconsistencies, and/or omissions it discovers, and
obtain specific instructions in writing from la safe before proceeding. Contractor shall
also request in writing written explanations as necessary to further detail or explain
performance of work and shall conform to the explanation given. Work performed prior
to receipt of additional explanation shall be at contractor’s sole risk.

LA SAFE
RFP NO. PS140976
ISSUED: 05.14.2026
2-8 FIXED RATE CONTRACT
REVISION DATE: 08.08.14
C. Intent. Omissions or misdescription of any work that is customarily performed or clearly
necessary to carry out the intent of the contract shall not relieve the contractor from
performing such work at no additional expense and/or delay, and such work shall be
performed as if fully and correctly set forth in the contract.
D. Interpretation
The Contractor shall carefully and continuously study all Contract Documents; shall verify all
figures in the Contract documents before performing the Services; shall promptly notify LA SAFE of
all errors, inconsistencies, and/or omissions that it discovers; and in instances where such non-
conformities are discovered, shall obtain specific instructions in writing from LA SAFE before the
Contractor's proceeding with the Services. Any Services affected, which are performed prior to LA
SAFE's decision, shall be at the Contractor's risk. The Contractor shall not take advantage of any
apparent non-conformity that may be found in the Contract Documents. LA SAFE shall be entitled
to make such corrections and interpretations, as it may deem necessary for the fulfillment of the
intent of the Contract. Omissions or misdescription of any Services that are clearly necessary to
carry out the intent of the Contract, or that are customarily performed, shall not relieve the
Contractor from performing such Services at no additional expense and/or delay, and such
Services shall be performed as if fully and correctly set forth in the Contract.
A. Terms. Where the terms "as indicated" and "as detailed," or words of similar
import are used themselves, it shall be understood that reference is made to the
Technical Specifications or other technical documents provided by LA SAFE, or Contract
drawings unless otherwise expressly stated. "Directed," "required," "permitted,"
"ordered," "designated," "selected," "approve," "accept," "satisfactory," "equal,"
"necessary," or words of like import shall be understood to require an identifiable action
by LA SAFE unless otherwise expressly stated.
B. References within the Contract. References to Articles and Subarticles herein are made
by citing the Title of the Articles only, e.g., a reference to this particular paragraph would
be phased "in the Article entitled ‘INTERPRETATION,’ which would necessarily be
inclusive of all other paragraphs in this Article. However, where a reference is made to
other paragraphs within the same Article, the reference is made as in the preceding
sentence, i.e., "in this Article." References to other Sections of the Contract are made
by citing the title of

[... truncated ...]