← Opportunities

Charlotte Trolley Car with Optional W2 Trolley Car Rehabilitation

Funder
Memphis Area Transit Authority ⚪ No history
Type / status
rfp · closed
Amount
—
Deadline
2024-05-01 (past)
“Proposals will be received by MATA at its Purchasing offices located at 40 S. Main Street, Suite 1200, Memphis, TN 38103, until 11:00 AM, local time on, Wednesday, May 1, 2024.”
Ecosystems
Categories
other
Tech stack
Apply
https://www.matatransit.com/assets/2/6/24-03_Charlotte_Trolley__Car_w-Optional_W2_Trolley_Car_Rehabilitation.pdf
Source
https://www.matatransit.com/assets/2/6/24-03_Charlotte_Trolley__Car_w-Optional_W2_Trolley_Car_Rehabilitation.pdf
Fit
5% · poor fit · The Charlotte Trolley Car rehabilitation request is for transit infrastructure and vehicle manufacturing, which falls outside the Venture23 Aleo team's expertise in ZK protocols, Rust/Leo smart contracts, and blockchain developer tooling.
Trust
89% · model self-report 95% · first seen 2026-10-26 · v1
Verified
2026-10-26 · by extraction

Memphis Area Transit Authority (MATA) seeks proposals for the rehabilitation of a Charlotte Trolley Car with an optional W2 Trolley Car rehabilitation. Qualified vendors must demonstrate experience delivering similar trolley vehicles within the past five years, provide detailed technical specifications, manufacturing capabilities, and a comprehensive rehabilitation plan. Proposals must include all required federal certifications and a separate price proposal. The contract will be awarded to the lowest responsive and responsible proposer based on technical evaluation criteria including vehicle design, past performance, conformance to schedule, and price.

Eligibility: Qualified vendors capable of providing trolley rehabilitation services with demonstrated experience delivering similar trolley vehicles in the US within the past 5 years. Must comply with Federal Transit Administration requirements, Buy America provisions, DBE participation goals, and all federal certifications. Proposers must not appear on the Comptroller General's list of ineligible contractors.

Pipeline

Override status:

Funder track record · does Memphis Area Transit Authority actually pay grants?

⚪ No payout history found · checked 2026-10-26 · 0 forum reports, 7 web pages read, 1 unverifiable claims dropped

Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.

Trust breakdown (3/3 checkable facts verified)

SignalWeightResultNote
deadline0.35100%quoted in source
apply link0.075100%link in source
funder0.075100%named in source
source quality0.1550%social or search hit
model confidence0.195%model self-report

Fit breakdown (against the ORG_* profile)

SignalWeightResultNote
model fit0.510%model rated 10%
ecosystem overlap0.250%none vs aleo
category overlap0.150%other vs zk, privacy, infra, dev_tooling, security, interoperability
tech overlap0.10%none vs rust, leo, zk

Sources (1)

RoleDocumentFromFetched
primary24-03_Charlotte_Trolley__Car_w-Optional_W2_Trolley_Car_RehabilitationWeb discovery: ecosystem sweep2026-10-26

History (1)

vChangedFields
12026-10-26created

Extracted text

Memphis Area Transit Authority ● 1370 Levee Rd. ● Memphis, TN 38108-1011 ● (901) 722-7100
WWW.MATATRANSIT.COM
REQUEST FOR PROPOSAL
SUBJECT: CHARLOTTE TROLLEY CAR W/ OPTIONAL W2 TROLLEY CAR
REHABILITATION
DATE: Friday, March 1, 2024
PROPOSAL NO.: 24-03
PROPOSAL DUE: MAY 1, 2024 TIME: 11:00 a.m. C.T.
The Memphis Area Transit Authority invites proposals for supplies and/or services set forth above in
accordance with the specifications enclosed herewith.
Proposals MUST be received at MATA by the date and time set forth above.
Sincerely,
Ashley Best
Sr. Contract Administrator

COMMON PROBLEMS WITH RFP SUBMITTAL
◼ Missing or unsigned copies of certain forms and certifications. The following must be
included in the RFP:
• Addenda Acknowledgement Form
• Affidavit of Non-Collusion (Exhibit I)
• Buy America (Exhibit II)
• Federal Tax Liability And Recent Felony Conviction
• Certification of Primary Participation Regarding Debarment, Suspension,
and Other Responsibility Matters (Exhibit III)
• Certification of Lower-Tier Participants (Subcontractors), Debarment,
Suspension, Ineligibility and Voluntary Exclusion (Exhibit III)
• Certification of Restrictions on Lobbying (Exhibit IV)
• Certification of Utilization of Disadvantaged Business Enterprises
• National Defense Authorization Act Telecommunications
• Letter Of Intent To Perform As A DBE Contractor Or Subcontractor
• Schedule of DBE Participation
• Explanation of "No Response"
◼ Incomplete or outdated information on client references and/or sufficient number of
references provided.
◼ Failure to include adequate documentation about the role of subcontractors in the
project.
◼ Submittal of too few copies. The RFP specifies the number of originals and number of
copies of the RFP to be provided.
◼ Failure to properly label the RFP package with RFP label.
◼ RFP received late. All RFPs must be in MATA's possession by the deadline shown in the
RFP. All RFPs received after the deadline will be returned unopened.

TABLE OF CONTENTS - 1
TABLE OF CONTENTS
ADVERTISEMENT
PART I INSTRUCTION TO PROPOSER
1.0 GENERAL ......................................................................................................................................1
2.0 PROPOSAL REQUIREMENTS ........................................................................................................2
3.0 PROPOSAL FORMAT ....................................................................................................................3
4.0 PROPOSAL PROCEDURES .............................................................................................................4
5.0 PROPOSAL EVALUATION/ BASIS FOR AWARD ............................................................................5
6.0 PROTESTS .....................................................................................................................................5
7.0 PERFORMANCE BOND .................................................................................................................6
8.0 PRE-AWARD AUDIT COMPLIANCE ...............................................................................................6
9.0 POST-DELIVERY AUDIT COMPLIANCE ..........................................................................................6
10.0 DELIVERY OF VEHICLES ................................................................................................................7
11.0 PRE-AWARD SURVEY PROCEDURES ............................................................................................7
12.0 CONFLICTING STATEMENTS.........................................................................................................7
13.0 TROLLEY TESTING .........................................................................................................................7
14.0 PROGRAM MANAGEMENT ..........................................................................................................8
15.0 DISADVANTAGED BUSINESS ENTERPRISE (DBE) .........................................................................8
PART II TECHNICAL SPECIFICATIONS
PART III REQUIRED FORMS AND CERTIFICATIONS
ADDENDA ACKNOWLEDGEMENT FORM
EXHIBIT I AFFIDAVIT OF NON-COLLUSION
EXHIBIT II BUY AMERICA CERTIFICATE
FEDERAL TAX LIABILITY AND RECENT FELONY CONVICTION
EXHIBIT III CERTIFICATION OF PRIMARY PARTICIPANT (PRIME CONTRACTOR) REGARDING DEBARMENT,
SUSPENSION, AND OTHER RESPONSIBILITY MATTERS
EXHIBIT III CERTIFICATION OF LOWER-TIER PARTICIPANTS (SUBCONTRACTORS)DEBARMENT, SUSPENSION,
INELIGIBILITY AND VOLUNTARY EXCLUSION
EXHIBIT IV CERTIFICATION OF RESTRICTIONS ON LOBBYING
CERTIFICATION OF UTILIZATION OF DISADVANTAGED BUSINESS ENTERPRISES
NATIONAL DEFENSE AUTHORIZATION ACT TELECOMMUNICATIONS
LETTER OF INTENT TO PERFORM AS A DBE CONTRACTOR OR SUBCONTRACTOR
SCHEDULE OF DBE PARTICIPATION
NO RESPONSE
EXHIBIT V PERFORMANCE BOND
EXHIBIT VII FEDERAL TRANSIT ADMINISTRATION AND PROCUREMENT POLICIES & REQUIREMENTS
EXHIBIT VII SAFETY CERTIFICATION
EXHIBIT IX CERTIFICATION OF FMVSS INAPPLICABILITY
PRICE PROPOSAL FORM
PART IV UTILIZATION OF DISADVANTAGED BUSINESS ENTERPRISES

TABLE OF CONTENTS - 2
PART V GENERAL CONTRACT PROVISIONS
PART VI TENESSEE STATE CONTRACT CLAUSES
PART VII ACCEPTANCE TESTS

MEMPHIS AREA TRANSIT AUTHORITY
LEGAL NOTICE TO PROPOSERS
Proposals will be received by the Memphis Area Transit Authority (MATA) at its Purchasing offices,
40 S. Main Street, Suite 1200, Memphis, TN, 38103, until 11:00 a.m. local time, on Wednesday,
May 1, 2024, for furnishing the following:
CHARLOTTE TROLLEY CAR W/ OPTIONAL W2 TROLLEY CAR REHABILITATION
A pre-proposal conference call will take place on Monday, March 11, 2024, at 10:00 A.M at MATA’s
Trolley location 547 N. Main St. 38105. While attendance is not mandatory, it is strongly suggested.
To attend the meeting via Microsoft Teams, Meeting ID: 262 799 433 473, Passcode: a2ViRP Or call
in (audio only) +1 901-614-1074, 66600101# United States, Memphis; Phone Conference ID:
666 001 01#.
Proposers must submit their proposal with the enclosed label attached to the envelope.
MATA hereby notifies all proposers that in regard to any contract entered into pursuant to this
advertisement, minority business enterprises will be afforded full opportunity to submit proposals in
response to this advertisement and will not be discriminated against on the grounds of race, color, sex,
religion, political affiliation or national origin in consideration of an award.
Any name appearing on the Comptroller General’s list of ineligible contractors is not an eligible
proposer. The contractor will be required to comply with all applicable Equal Employment Laws and
Regulations.
Further information and proposal requirements may be obtained by contacting Ashley Best,
Contract Administrator at (901) 722-7182 or via email: abest@matatransit.com.
Award of the contract will be made on the basis of the Lowest Responsive and Responsible proposer
as selected by the Authority, provided it is in their best interest to do so.
MATA reserves the right to reject any and all proposals, and to waive any informality in proposing.
March 1, 2024 & April 23-24, 2024
Bacarra Mauldin
Interim Chief Executive Officer

PART IINSTRUCTION TO PROPOSERS

PART I – INSTRUCTIONS TO PROPOSERS -1
PART I
INSTRUCTIONS TO PROPOSERS
1.0 GENERAL
1.1 The Memphis Area Transit Authority (hereinafter referred to as MATA) seeks Proposals for
professional services from qualified vendors capable of providing the scope of services described
in Part II. These instructions provide detailed legal and technical requirements for the acquisition
of this product. This Request for Proposals (RFP) will become part of the contract.
MATA will enter into a contract with the successful proposer for professional services relative to
the Project. This Project is more particularly described in Part II – Technical Specifications.
General Contract Provisions are included in Attachment 1. Where there are conflicts between the
General Contract Provisions and Part I, the provisions of Part I shall apply.
MATA is a public agency responsible for providing public transportation services within the city of
Memphis and surrounding communities.
1.2 Purchaser” or “Grantee” or “Authority” means MATA. The words “request for proposal”, “RFP”, and
“solicitation” are synonymous. The words “proposal”, “bid” and “offer” are also synonymous and it
is understood that once MATA accepts same, the document will constitute a portion of the contract
contemplated by these instructions. The words “proposer”, “bidder” and “offerer” are also
synonymous.
1.3 The terms "Trolley", “Vintage Trolley”, “Streetcar”, “Car” or "Vehicle" are synonymous.
1.4 A pre-proposal conference call will take place on Monday, March 11, 2024, at 10:00 A.M at MATA’s
Trolley location 547 N. Main St. 38105. While attendance is not mandatory, it is strongly suggested.
To attend the meeting via Microsoft Teams, Meeting ID: 262 799 433 473, Passcode: a2ViRP Or
call in (audio only) +1 901-614-1074, 66600101# United States, Memphis; Phone Conference ID:
666 001 01#.
1.5 This Request For Proposals (RFP) does not commit MATA to award a contract or pay any costs
incurred in preparation of Proposals in response to the RFP or to procure or contract for services.
Proposers shall be responsible for all costs incurred as part of their participation in the pre-award
process.
1.6 Proposals will be received by MATA at its Purchasing offices located at 40 S. Main Street, Suite
1200, Memphis, TN 38103, until 11:00 AM, local time on, Wednesday, May 1, 2024.
All Proposals shall be deemed received at the above address. Proposers are solely responsible
for ensuring that his/her Proposals are delivered in a timely manner. Proposers who rely on
overnight delivery services, the United States mail, private mail services, local couriers, or delivery
services remain solely responsible for timely delivery of the RFP and assume all risk of late delivery,
miss-delivery, and non-delivery. All Proposals will be date/time stamped, logged, and deposited
by MATA Staff.
Proposers are reminded that all RFPs must be securely sealed, have the enclosed label attached,
and be clearly marked “Proposal”.
MATA's normal business hours are 8:00 a.m. to 4:30 p.m. Monday through Friday. After normal
business hours, Proposals will be accepted at the MATA dispatcher's office, 1370 Levee Road,
Memphis, TN 38108; however, Proposers are reminded of their sole responsibility for ensuring that

PART I – INSTRUCTIONS TO PROPOSERS -2
their RFP is deposited in the Purchasing Department.
Proposers may verify receipt of RFPs by contacting Ashley Best at (901) 722-7182 or email:
abest@matatransit.com. Proposer must submit an up to date W-9 form with the proposal.
1.7 All correspondence, communication, and/or contact in regard to any aspect of this solicitation or
offers shall be with Ashley Best, Sr. Contract Administrator. Offerors and their representatives shall
not make any contact with or communicate with any members of MATA, or its employees and
consultants, other than Ms. Best in regard to any aspect of this solicitation or offers. At any time
during this procurement up to the time specified below, Offerors may request, in writing, a
clarification or interpretation of any aspect, or a change to any requirement of the RFP or any
addenda to the RFP as described in Section 4.3.
1.8 All Proposals and related documents shall be based on the conditions of a financial assistance
contract between MATA, the State of Tennessee and the United States Department of
Transportation, under the Federal Transit Act, as amended. Terms and conditions established
under the Act and the regulations implementing the Act will apply. Compensation for travel, meals,
and/or lodging shall be in the amount of actual cost to the contractor subject to the maximum
amounts and limitations specified in the State Comprehensive Travel Regulations.
2.0 PROPOSAL REQUIREMENTS
2.1 Proposals must concisely set forth full, accurate, and complete information required by this
proposal including any attachments.
2.2 Proposers shall provide a proposal on the forms provided along with additional pages as necessary
to be fully responsive to the proposal requirements described herein. All proposals shall give the
proposed price and shall be signed by the proposer or his authorized representative. If the proposal
is made by either: (1) the Contractor firm, partnership, or corporation, they shall provide their
corporate name and post office address; (2) a corporation, the proposal shall show the title of the
person who signs on behalf of the corporation.
2.3 The price to be quoted in any proposal shall include all labor, materials, tools, equipment, delivery
and other costs necessary to fully complete the work as set forth in the Technical Specifications.
Anything omitted from such specifications that are clearly necessary for completion of the work
shall be considered a portion of such proposal. All parts shall be new and in no case will used,
reconditioned, or obsolete parts be accepted unless allowed on the technical specifications or
approved by MATA.
2.4 The intent of these specifications is to define top quality equipment, which is capable of delivering
maximum performance with high reliability. Equipment shall be of design, manufacture, and proven
reliability through previous application in similar daily transit service to that for which it is intended.
Equipment shall be so designed and constructed that ready access for operations, maintenance,
and renewal is provided.
2.5 MATA reserves the right to amend the RFP at any time. Any amendments to or interpretations of
the RFP shall be described in written addenda. MATA shall provide copies of Addenda to all
prospective Offerors known to have received the RFP. The addendum will be mailed or delivered
to all such prospective Offerors officially known to have received the RFP and to the address
provided by each prospective Offeror. Failure of any prospective Offeror to receive the notification
or addendum shall not relieve the Offeror from any obligation under its proposal as submitted or
under the RFP, as clarified, interpreted or modified. All addenda issued shall become Part of the
RFP. Prospective Offerors shall acknowledge the receipt of each individual addendum and all prior
addenda in their proposals. Failure to acknowledge in the proposals receipt of addenda may at
MATA's sole option disqualify the proposal.

PART I – INSTRUCTIONS TO PROPOSERS -3
2.6 Proposals shall be valid for a minimum period of ninety (90) days subsequent to the closing date.
Proposals offering less than ninety (90) days for acceptance by MATA from the closing date will be
considered non-responsive.
3.0 PROPOSAL FORMAT
3.1 Proposals shall be submitted in a sealed package clearly marked to reflect the contents. One
(1) original and one (1) electronic copy (flash drive) shall be submitted. The price proposal form
shall be submitted in a separate sealed envelope.
3.1.1 Technical Proposal - A technical proposal shall provide the following information as a minimum:
A. A listing of properties in the United States to which proposers completed delivery of similar
trolley(s). Such listings shall cover a period of no less than the most recent 5-years of
production. As a minimum the listing shall indicate the number of units in the delivery, the
date of the contract, the date of delivery, the date of acceptance, description of the major
components and systems as well as ancillary equipment (i.e., wheelchair ramps,
fareboxes, radios, public address systems), and client reference to include contact
person, position title, daytime telephone number and email address.
B. A complete description of the proposed vehicle in sufficient detail to permit MATA to
determine conformance with the specifications including drawings and technical
specifications for the vehicle body and all major components, including wiring layout and
circuit breaker specifications. (See Part III)
C. A proposed interior seating layout showing all seating positions, dimensions, locations
and aisle widths, including a summary indicating the number of seating positions
(excluding the driver position) and standing capacity.
D. A report indicating financial stability and capability of the company to obtain resources to
fully perform the contract.
E. A description of the manufacturing facilities to be used to manufacture the vehicles,
including location, square footage, and special tooling available to construct the vehicles
in a timely manner.
F. A description of support for the proposed vehicles and all major components, including
parts support and technical assistance.
G. The recommended preventative maintenance schedule for the trolleys.
H. Required Forms and Certifications
• Addenda Acknowledgement Form
• Affidavit of Non-Collusion (Exhibit I)
• Buy America (Exhibit II)
• Federal Tax Liability and Recent Felony Conviction
• Certification of Primary Participation Regarding Debarment, Suspension, and
Other Responsibility Matters (Exhibit III)
• Certification of Lower-Tier Participants (Subcontractors), Debarment, Suspension,
Ineligibility and Voluntary Exclusion (Exhibit III)
• Certification of Restrictions on Lobbying (Exhibit IV)
• Certification of Utilization of Disadvantaged Business Enterprises
• National Defense Authorization Act Telecommunications
• Letter Of Intent to Perform As A DBE Contractor or Subcontractor
• Schedule of DBE Participation

PART I – INSTRUCTIONS TO PROPOSERS -4
• Explanation of "No Response" I. Contractor shall submit a proposed delivery
schedule, and provide schedule milestones.
J. Time of Completion – A project management timeline shall be submitted with the proposal.
The work shall begin immediately upon date indicated on the Notice to Proceed.
K. Contractor shall submit a comprehensive test plan that will cover testing of all major
components, system and vehicle level at Contractor’s plant and a test report provided
before acceptance of the first vehicle by MATA.
L. Contractor shall submit a Rehabilitation Plan as part of its proposal to MATA to include
the proposer’s expertise, relevant experience, approach, and best schedule for
completing the work described herein. The Plan is explained in detail in Part II of this
procurement.
3.1.2 Price Proposal - The price proposal shall include all elements of cost for providing the proposed
vehicles and shall include the following:
A. Price Proposal Form
3.2 Information contained in the proposals will not be released by MATA prior to contract award in order
to protect the integrity of the procurement process. Submission of information relative to this RFP
subsequent to the proposal opening date shall not be released by MATA during the evaluation
process or prior to contract award unless required by applicable laws. Proposers are further
advised that MATA may be required to release proposal information after contract award.
If a Proposer feels that any information is confidential or proprietary in nature, the Proposer must
submit all such information in a separately sealed envelope prominently marked with the Proposer's
name and "PROPRIETARY INFORMATION". MATA shall not release or divulge such information
to third parties without the consent of the Proposer unless required to do so by applicable law or
order of a court of competent jurisdiction.
4.0 PROPOSAL PROCEDURES
4.1 MATA reserves the right to postpone the proposal opening date for its own convenience and to
waive any minor informality that does not go to the heart of the proposal or prejudice other
proposers or to reject for good and compelling reasons any and all proposals submitted.
4.2 Changes to these instructions will be made by written addendum by MATA and will be forwarded
to all persons and firms to whom these instruction documents have been submitted.
4.3 Requests for clarification or approved equal must be submitted in writing to Ashley Best,
Sr. Contract Administrator, Memphis Area Transit Authority, 40 S. Main Street, Suite 1200,
Memphis, Tennessee 38103, abest@matatransit.com and must be received no later than
11:00 a.m. local time, Monday, March 18, 2024, in accordance with the approved equal
procedures described in the General Contract Provisions, Section 45. Any unapproved deviations,
exceptions, substitutes, alternates or conditional qualifications contained in a proposal may be
cause for its rejection. MATA's replies to such requests will be postmarked at least seven days
before the date scheduled for proposal opening. A notice of clarification or approved equals will
be furnished to all parties receiving specifications so that all Proposers may prepare their proposals
accordingly.
4.4 Proposers shall submit one (1) original and one (1) electronic copy (flash drive) of their
respective proposals. Proposals shall be securely sealed to prevent access prior to the proposal
opening date. Proposals shall have the enclosed label attached to the proposal package.

PART I – INSTRUCTIONS TO PROPOSERS -5
4.5 Proposals shall be valid for a minimum period of 90 days subsequent to the proposal opening date.
Proposals offering less than 90 days for acceptance from the proposal opening date may be
considered non-responsive.
5.0 PROPOSAL EVALUATION/BASIS FOR AWARD
5.1 MATA shall employ competitive negotiation procurement process in making a contract award. The
award of this contract will be made to the Proposer whose proposal, in the opinion of MATA; best
meets the established criteria and is most advantageous to MATA with price and other factors
considered. Price evaluation shall not begin until the technical evaluation is completed. An
evaluation team shall evaluate proposals.
5.2 Proposals will be evaluated on the basis of the factors described below in the following order of
descending priority:
A. Vehicle Design - Overall design concepts and features of the trolley structure and major
components and systems based on a proposed 12-year life cycle.
B. Past Performance - The proposer's demonstrated ability to meet contractual obligations,
manufacture to specifications, deliver on time, and provide parts and technical support.
C. Conformance to the RFP and delivery schedule.
D. Price - Overall price as indicated on the Price Proposal forms.
5.3 The evaluation team will provide a tabulation of the technical merits of the proposal with the lowest
points designating the worst and the highest points designating the best relative to the criteria.
5.4 The evaluation team may recommend that the contract award be made without negotiations
provided that the acceptance of the most advantageous initial proposal will result in a fair and
reasonable price. The evaluation team may recommend that a contract be awarded subsequent
to negotiations. If negotiations are used at all, the Contracting Officer will negotiate with all the
proposers that are in the competitive range and have a reasonable chance of being selected.
5.5 Negotiations will be in conformance with applicable federal, state, local laws, regulations and
procedures. The objective of the negotiations will be to reach agreement on all provisions of the
proposed contract, including contract price. MATA reserves the right to request documentation
supporting the proposed contract price including overhead rates for the firm and subcontractors.
Such information can include, but not be limited to:
A. An overview of the accounting system and its capability to track project costs.
B. Charts of accounts including a definition of what is included in each account.
C. A statement indicating the basis of the overhead rate and whether it is historical information
of projections. (The proposer will certify that the overhead burden rate separates direct
and indirect charges and that indirect charges do not include any unauthorized charges for
Federal Acquisition Regulations, Part 31.)
5.6 MATA reserves the right to reject any and all proposals or to waive minor informalities and
irregularities in offers received.
5.7 A written notice of award and acceptance of offer mailed or otherwise furnished to the successful
proposer within the time specified in the proposal shall be deemed to result in a binding contract.
5.8 MATA reserves the right to award this contract in any manner which MATA deems to be in its best
interest.
6.0 PROTESTS

PART I – INSTRUCTIONS TO PROPOSERS -6
61 MATA will consider all protests filed in a timely manner regarding the award of a contract, whether
submitted before or after award. All protests are to be submitted in writing, in accordance with the
protest procedures described in the General Contract Provisions.
6.2 Under certain limited circumstances, a potential proposer may protest to FTA the award of a
contract pursuant to an FTA grant. FTA's review of any protest is limited to:
A. An alleged failure of MATA to have written protest procedures or alleged failure to follow
such procedures.
B. Alleged violations of a specific federal requirement that provides an applicable complaint
procedure, which shall be submitted in accordance with that federal regulation.
7.0 PERFORMANCE BOND
The successful proposer shall furnish a performance bond in an amount equal to 25% of the
contract sum as security for the faithful performance of this contract. Form of instruments shall be
standard City Of Memphis form, a copy of which is attached. Bonds shall be furnished through an
agent legally authorized to do business in the State of Tennessee and delivered to the Authority no
later than the date of execution of the contract. The Bond will be released upon delivery and
acceptance of the last trolley and all spare parts in the base order. The option order shall have a
separate bond.
8.0 PRE-AWARD AUDIT COMPLIANCE
Federal regulations require MATA to conduct a Pre-Award Audit before entering into a contract to
purchase rolling stock on procurements with funds obligated by FTA on or after October 24, 1991.
The Pre-Award Audit includes the following items as stated in 49 CFR Part 663, Pre-Award and
Post-Delivery Audits of Rolling Stock Purchases; Final Rule, dated September 24, 1991:
A. A Buy America Certification as described in Section 663.25;
B. A Purchaser's Requirements Certification in Section 663.27;
C. A Manufacturer's Federal Motor Vehicle Safety Standard Certification in Section 663.41 or
663.43.
9.0 POST-DELIVERY AUDIT COMPLIANCE
Post-Delivery Audit – After the vehicle(s) have been shipped, the Contractor shall review the report
of its plant inspectors to determine if a variance exists between the material listed on MATA’s Pre-
Award Buy America audit and the material used by the vehicle manufacturer. Also, the Contractor
shall confirm that the vehicle(s) are in absolute compliance to MATA’s technical specifications as
amended through the Request for Approved Equals process. If a variance exists, the Contractor
shall review the resolution of the variance. If necessary, the vehicle supplier will be contracted.
Once this review process is complete, the Contractor shall issue a report to MATA stating that the
vehicles comply with both the Pre-Award Buy America certification and the technical certification.
The report shall also contain a copy of the weekly reports in order to verify that inspectors were
present during the manufacturing process. This report shall meet the Post-Delivery audit
requirements of 49 CFR, Part 663.
Federal regulations require MATA to conduct a Post-Delivery Audit before title to the rolling stock
is transferred to MATA. The Post-Delivery Audit includes the following items as stated in 49 CFR
Part 663, Pre-Award and Post-Delivery Audits of Rolling Stock Purchases; Final Rule, dated
September 24, 1991:
A. A Post-Delivery Buy America Certification as described in Section 663.35;
B. A Post-Delivery Purchaser's Requirements Certification in Section 663.37;

PART I – INSTRUCTIONS TO PROPOSERS -7
C. Certification of FMVSS Inapplicability.
10.0 DELIVERY OF VEHICLES
10.1 Delivery shall be determined by signed receipt of MATA's designated agent, or his designee, at the
point of delivery and may be preceded by a cursory inspection of the vehicles.
The point of delivery shall be:
Memphis Area Transit Authority Trolley Division
547 North Main Street
Memphis, TN 38105
Delivery of the trolleys shall be FOB point of delivery by Common Carrier Driveaway.
11.0 PRE-AWARD SURVEY PROCEDURES
A. After proposal opening, but prior to award of a contract, MATA shall have the right to conduct a
pre-award survey, to evaluate prospective contractor's performance capabilities under the terms
and conditions of this proposal request. The pre-award survey will aid MATA in determining the
responsibility of the prospective contractor. The evaluation will be conducted on the basis of
(1) data on hand, (2) data available from the U.S. Government or commercial sources, (3) if
necessary, on-site inspection of plant facilities to be used for performance of the proposed contract,
(4) the descriptive literature submitted with the proposal, or (5) any combination of the above.
B. The pre-award survey will focus on the prospective contractor's ability to manufacture and deliver
the equipment specified in the proposal request within the time stated. The survey will include, but
not be limited to, the following essential elements:
If the pre-award survey is conducted,
(1) MATA will require the prospective contractor to furnish engineering and test data that
demonstrates that the equipment proposed meets or exceeds the specifications set forth
in the proposal request.
(2) MATA will require the prospective contractor to furnish plans and production schedules
which demonstrate the ability of the prospective contractor or meet the delivery schedule
specified. MATA shall be permitted to inspect production facilities, if necessary, to
determine whether or not the prospective contractor is capable of performing under the
terms and conditions of the proposal request.
C. All data obtained from the pre-award survey shall be kept confidential by MATA and shall not be
made available outside MATA except insofar as may be required by the Federal Transit Act and
applicable laws and regulations.
12.0 CONFLICTING STATEMENTS
Part I, Instructions to Proposers is the correct language if there are any conflicting statements in
this document.
13.0 TROLLEY TESTING
The Contractor shall submit a comprehensive test plan that will cover testing of all major
components, systems, and vehicle levels at Contractor’s plant and a test report provided before
acceptance of the first vehicle by MATA.

PART I – INSTRUCTIONS TO PROPOSERS -8
All tests identified within the following sections: Instructions to Proposers, Section 13; Part II
Technical Specifications, Section 8; as defined in Section VII, Section 1.0 Acceptance Tests; and
per the requirements in the General Contract Provisions, Item 18.
14.0 PROGRAM MANAGEMENT
The Contractor shall be required to work with MATA’s Project Manager for design reviews, project
schedules, status reporting, CDRL submittals, and document control, and any other requirements
pertaining to technical specifications.
15.0 TERMS OF PAYMENT –
Payment for the specified items shall be net thirty (30) days after acceptance. Proposer should
note any discounts for payment before thirty (30) days.
MATA will consider partial payments for the specified items. Partial payments will be made
according to the milestone schedule per Part II, Section 3.4, and at MATA’s discretion. Contractor
shall define the work products or portions of work products that MATA will own for each partial
payment. Upon payment by MATA to Contractor, MATA shall own the identified work products.
16.0 DISADVANTAGED BUSINESS ENTERPRISE (DBE)
15.1 This contract is subject to the requirements of Title 49, code of Federal Regulations,
Part 26, Participation by Disadvantaged Business Enterprises in Department of
Transportation Financial Programs.
A. DBE Requirements for Transit Vehicle Manufactures:
Pursuant to Title 49, Code of Federal Regulations, Part 26.49, a Proposer, as a condition
of being authorized to respond to this solicitation, must certify by completing the form
Transit Vehicle Manufactures (TVM) Certification that it has on file with the Federal
Transportation Administration (FTA) an approved or not disapproved annual
Disadvantaged Business Enterprise (DBE) subcontracting participation goal.
**See Part III – Form and Certifications.

PART II
TECHNICAL SPECIFICATIONS

PART II – TECHNICAL SPECIFICATION - 1
Table of Contents
1. SCOPE OF WORK – GENERAL OVERVIEW ....................................................................................................... 5
2. PROPOSED REHABILITATION PLAN ................................................................................................................ 6
3. GENERAL REHABILITATION REQUIREMENTS .................................................................................................. 8
3.1. INTRODUCTION ..................................................................................................................................................8
3.2. GENERAL REHABILITATION PROGRAM OBJECTIVES ....................................................................................................8
3.3. GENERAL REQUIREMENTS.....................................................................................................................................8
3.3.1. Interchangeability ..................................................................................................................................9
3.4. GENERAL PROJECT MILESTONE SCHEDULE ...............................................................................................................9
3.4.1. Liquidated Damages ..............................................................................................................................9
3.5. ENVIRONMENTAL REQUIREMENTS..........................................................................................................................9
3.6. GENERAL REHABILITATION WORK ..........................................................................................................................9
3.7. DELIVERY OF VEHICLES TO/FROM CONTRACTOR .....................................................................................................10
3.8. JOINT INSPECTIONS ...........................................................................................................................................11
3.9. MATERIALS REMOVED FROM THE VEHICLE .............................................................................................................11
3.10. ACRONYMS AND ABBREVIATIONS .....................................................................................................................12
3.11. CDRLS .......................................................................................................................................................13
4. MANUALS AND TRAINING ........................................................................................................................... 14
4.1. CAR HISTORY BOOK ..........................................................................................................................................14
4.2. CAR OPERATING MANUAL ..................................................................................................................................14
4.3. MAINTENANCE MANUALS ..................................................................................................................................14
4.4. PARTS MANUAL ...............................................................................................................................................15
4.5. TRAINING ........................................................................................................................................................15
4.6. DELIVERY SCHEDULE ..........................................................................................................................................16
4.7. CDRLS ...........................................................................................................................................................16
5. CHARLOTTE BIRNEY TROLLEY CAR REHABILITATION PROJECT ..................................................................... 17
5.1. PROJECT INTENT ...............................................................................................................................................17
5.2. TROLLEY CAR HISTORY AND SPECIFICATIONS ..........................................................................................................17
5.3. TROLLEY CAR UPGRADES OVERVIEW.....................................................................................................................18
5.4. PAINT PROCESS AND SCHEME .............................................................................................................................19
5.5. GENERAL CARBODY AND STRUCTURE ....................................................................................................................19
5.5.1. Roof ......................................................................................................................................................20
5.5.2. Accessibility Lifts (Optional) .................................................................................................................21
5.5.3. Doors ....................................................................................................................................................21
5.5.4. Steps.....................................................................................................................................................22
5.5.5. Lifeguards ............................................................................................................................................22
5.5.6. Tow bar ................................................................................................................................................22
5.5.7. Tow-Pin ................................................................................................................................................22
5.6. INTERIOR WORK ...............................................................................................................................................22
5.6.1. Floors ...................................................................................................................................................23
5.6.2. Hardware and Trim ..............................................................................................................................23
5.6.3. Operator Gong .....................................................................................................................................23
5.6.4. Windshield wipers ................................................................................................................................23
5.6.5. Operator’s Seat ....................................................................................................................................23
5.6.6. Passenger Seats ...................................................................................................................................23
5.6.7. Mirrors .................................................................................................................................................24
5.6.8. Window Sash .......................................................................................................................................24
5.6.9. Deliverables, Interior ...........................................................................................................................

[... truncated ...]