← Opportunities

Efficiency Maine Public DC Fast Chargers Phase 10

Funder
Efficiency Maine Trust · Public DCFC Phase 10 (NEVI/BIL Funds) ✅ Proven payer
Type / status
rfp · closed
Amount
up to 9,200,000 USD
Deadline
2026-01-20 (past)
“Proposals Due: January 20, 2026, 11:59 p.m. Eastern Time (US)”
Ecosystems
Categories
infracommunity
Tech stack
Apply
https://www.efficiencymaine.com/opportunities/rfp-em-004-2026
Source
https://www.efficiencymaine.com/docs/RFP_EM_004_2026_.pdf
Fit
8% · poor fit · The Venture23 Aleo team works on ZK, privacy, and blockchain infrastructure in the aleo ecosystem, which is entirely unrelated to public EV DC fast charger installation and NEVI/BIL funding programs.
Trust
67% · model self-report 95% · first seen 2026-10-26 · v1
Verified
2026-10-26 · by extraction

Efficiency Maine Trust seeks qualified bidders to install and operate public DC fast chargers for electric vehicles within one driving mile of specified roadway exits and routes across Maine. The RFP offers capital incentives up to 80% of eligible project costs (capped at $800,000 per site) and demand charge incentives up to 80% of utility demand charges for the first five years (capped at $200,000 per site). Proposals must be submitted electronically via the online submission form by the deadline.

Eligibility: Qualified bidders capable of installing and operating public DC fast chargers in Maine; must meet NEVI Formula program requirements and provide surety bond or letter of credit for awarded capital incentive.

Pipeline

Override status:

Funder track record · does Efficiency Maine Trust actually pay grants?

✅ Proven payer · 10 grantees found · last payout 2026-09-10 · checked 2026-10-26 · 0 forum reports, 10 web pages read, 5 unverifiable claims dropped

Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.

GranteeAmountDateEvidence
Ridgeline Energy Analytics, Inc.—2026-09-10“09/10/2026 0092026 Innovation Hub State-Level Pilot Support Services [Ridgeline Energy Analytics, Inc.]” source
Applegreen Electric—2025-12-15“12/15/2025 0072026 Public DC Fast Chargers: Phase 11 [Applegreen Electric]” source
Multiple—2025-08-18“08/18/2025 0052026 Medium- and Heavy-Duty Battery Electric Vehicle Demonstration Project [Multiple]” source
Multiple—2025-08-15“08/15/2025 0302024 Level 2 Electric Vehicle (EV) Chargers: Community Locations [Multiple]” source
Multiple—2025-08-15“08/15/2025 0272024 Level 2 Electric Vehicle (EV) Chargers: Large Workplaces [Multiple]” source
Multiple—2025-05-30“Electric Vehicle (EV) Chargers: Phase 4 Round 3 [Multiple]” source
Multiple—2025-04-28“04/28/2025 0202025 Various Research, Evaluation, Verification and Grid Modernization Support Services [Multiple]” source
Multiple—2025-01-17“01/17/2025 0222024 Level 2 Electric Vehicle (EV) Chargers: Multifamily Buildings [Multiple]” source
CLEAResult Consulting, Inc.—2024-11-26“11/26/2024 0082025 Demand Management Program Support [CLEAResult Consulting, Inc.]” source
Multiple—2023-10-27“10/27/2023 0162023 Various Research, Evaluation, Verification, and Grid Modernization Support Services [Multiple]” source
Center for Sustainable Energy—2023-10-05“10/5/2023 0082024 Electric Vehicle Rebate Support Services [Center for Sustainable Energy]” source
Multiple—2023-10-02“10/2/2023 0142023 Demand Response Initiative [Multiple]” source
Multiple—2023-08-01“8/1/2023 0132023 Electric Vehicle DC Fast Charging Stations – Phase 4 (Round 2) [Multiple]” source
Recharge MaineMore than $6 million2023-08-01“Recharge Maine Announces Planned Awards of More Than $6 Million in Bids to Further Extend Maine's Electric Vehicle Charging Infrastructure” source
Virtual Peaker—2023-02-01“2/1/2023 0092023 Distributed Energy Resources Management Service Provider [Virtual Peaker]” source
Multiple—2023-01-24“1/24/2023 0082023 DC Fast Charging Stations – Phase 4 [Multiple]” source
Launch Consulting—2022-10-18“10/18/2022 0242022 Database Management and Technical Services [Launch Consulting]” source
CollinsCEA and GDS Associates, Inc.—2022-09-30“9/30/2022 0042023 Services to Assess Cost-Saving Energy Opportunities in Maine State Buildings [CollinsCEA and GDS Associates, Inc.]” source
New England Heat Pump Accelerator$450 million2022-05-02
page date
“Among the projects selected by the EPA was a multistate proposal, The New England Heat Pump Accelerator (Accelerator), a $450 million award to accelerate the adoption of cold-climate air-source heat pumps, ground-source ” source

Trust breakdown (3/4 checkable facts verified)

SignalWeightResultNote
deadline0.35100%quoted in source
amount0.250%figure not found in source
apply link0.075100%link in source
funder0.075100%named in source
source quality0.1550%social or search hit
model confidence0.195%model self-report

Fit breakdown (against the ORG_* profile)

SignalWeightResultNote
model fit0.510%model rated 10%
ecosystem overlap0.250%none vs aleo
category overlap0.1517%infra, community vs zk, privacy, infra, dev_tooling, security, interoperability
tech overlap0.10%none vs rust, leo, zk

Sources (1)

RoleDocumentFromFetched
primaryEfficiencyMaine_RFP_EM-004-2026_PublicDCFC_Phase10Web discovery: ecosystem sweep2026-10-26

History (1)

vChangedFields
12026-10-26created

Extracted text

Request for Proposals (RFP) for
Public DC Fast Chargers: Phase 10
EM-004-2026
Date Issued: August 20, 2025
Proposals Due: January 20, 2026, 11:59 p.m. Eastern Time (US)

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 2
Table of Contents
SECTION 1 – RFP INFORMATION AND INSTRUCTIONS .................................................................................... 3
1.1 PURPOSE ............................................................................................................................................................... 3
1.2 DESIGNATED CONTACT PERSON FOR THIS RFP .............................................................................................................. 3
1.3 SCHEDULE .............................................................................................................................................................. 3
1.4 ANTICIPATED CONTRACT TERM .................................................................................................................................. 4
1.5 ANTICIPATED CONTRACT BUDGET ............................................................................................................................... 4
1.6 PROPOSAL SUBMITTAL DEADLINE ............................................................................................................................... 4
1.7 SUBMITTING QUESTIONS .......................................................................................................................................... 4
1.8 PROPOSAL CONFIDENTIALITY ..................................................................................................................................... 4
1.9 CONTRACT AWARD .................................................................................................................................................. 5
1.10 CONTRACTING PROCESS ........................................................................................................................................... 5
1.11 RFP PROCESS – RESERVATION OF RIGHTS .................................................................................................................... 5
1.12 CONTRACT AGREEMENTS .......................................................................................................................................... 5
1.13 REQUEST FOR RECONSIDERATION ............................................................................................................................... 5
SECTION 2 – BACKGROUND INFORMATION .................................................................................................... 6
2.1 EFFICIENCY MAINE TRUST ......................................................................................................................................... 6
2.2 BACKGROUND ........................................................................................................................................................ 6
2.3 PROJECT OBJECTIVES AND GOALS ............................................................................................................................... 6
2.4 DEFINITIONS........................................................................................................................................................... 6
2.5 ADDITIONAL SOURCES OF INFORMATION...................................................................................................................... 8
2.6 INCENTIVES ............................................................................................................................................................ 8
2.7 ELIGIBLE COSTS ....................................................................................................................................................... 9
2.8 INELIGIBLE COSTS .................................................................................................................................................. 10
2.9 ELIGIBLE SEGMENTS ............................................................................................................................................... 10
SECTION 3 – SCOPE OF WORK....................................................................................................................... 11
3.1 PRIMARY PROJECT REQUIREMENTS AND TASKS ........................................................................................................... 11
3.2 INSTALL EV CHARGING STATIONS MEETING THE FOLLOWING REQUIREMENTS................................................................... 12
3.3 PROVIDE ONGOING OPERATION AND MAINTENANCE AND CUSTOMER SERVICE SUPPORT .................................................... 17
3.4 MANAGE HOST SITE RELATIONSHIP; ADHERE TO HOST SITE AGREEMENT ......................................................................... 18
3.5 REPORTING .......................................................................................................................................................... 18
3.6 PROJECT KICKOFF MEETING .................................................................................................................................... 20
SECTION 4 – PROPOSAL REQUIREMENTS ...................................................................................................... 21
4.1 PROPOSAL SUBMISSION .......................................................................................................................................... 21
4.2 FORMAT REQUIREMENTS ........................................................................................................................................ 21
4.3 CONTENT AND ORGANIZATION REQUIREMENTS........................................................................................................... 21
SECTION 5 – PROPOSAL EVALUATION CRITERIA ........................................................................................... 26
5.1 EVALUATION CRITERIA............................................................................................................................................ 26
Separate attachments:
Attachment A – Project Cost Proposal Form
Attachment B – Standard Agreement for EV Charging Incentives Using NEVI/BIL Funds
Attachment C – Eligible Segment Maps
Attachment D – Utility Load Form – Central Maine Power
Attachment E – Utility Load Form – Versant Power – Bangor Hydro
Attachment F – W-9

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 3
SECTION 1 – RFP INFORMATION AND INSTRUCTIONS
1.1 Purpose
Efficiency Maine Trust (Efficiency Maine or the Trust) seeks qualified bidders to install and operate public
DC fast chargers (DCFC) for electric vehicles (EVs) within one (1) driving mile of select roadway exits or
routes described below:
Auburn to Lewiston
• I-95 Exit 75 or Exit 80
Brunswick to Topsham
• I-295 Exit 28 or Exit 31; or
• Route 1 in Brunswick, west of Federal Street
Wiscasset to Damariscotta
• Route 1
Ellsworth
• Route 1
Skowhegan
• Route 2; or
• Route 201
Newport/Palmyra
• Route 2; or
• I-95 Exit 157
Hermon/Hampden to Bangor and Brewer
• I-95 Exits 180-187; or
• I-395 Exits 1A-6B; or
• Route 1A
Medway
• I-95 Exit 244
1.2 Designated Contact Person for this RFP
Lily McVetty
Program Manager
Efficiency Maine
Email: lily.mcvetty@efficiencymaine.com
1.3 Schedule
Milestone Date/Deadline
1 RFP Issued August 20, 2025
2 Questions Due October 1, 2025
3 Responses to Questions Posted October 22, 2025
4 Proposals Due January 20, 2026
5 Anticipated Award Date March 20, 2026
6 Deadline for Executing Contract(s) and Host Site Agreement(s) June 1, 2026
7 Deadline for Commissioning Chargers March 20, 2028

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 4
Schedule changes: Efficiency Maine reserves the right to modify this schedule at its discretion. Any
changes or additional information regarding the RFP schedule and pre-bid activities, including responses
to questions, will be posted on the RFP EM-004-2026 webpage at
https://www.efficiencymaine.com/opportunities/rfp-em-004-2026/.
1.4 Anticipated Contract Term
The anticipated term of the contracts is from the date of execution through five (5) years after
commissioning.
1.5 Anticipated Contract Budget
The budget available for this RFP comprises approximately $9.2 million of NEVI Formula funds for capital
and demand charge incentives.
1.6 Proposal Submittal Deadline
All responses must be submitted electronically via the online Submission Form on the RFP EM-004-2026
webpage (https://www.efficiencymaine.com/opportunities/rfp-em-004-2026/). Proposals must be
received by the due date and time specified in section 1.3. Bidders will receive a time-stamped
confirmation email when their proposals are submitted. (Note: There may be a delay of a few minutes
between submission and this confirmation email). Any proposal received after the deadline will not be
considered. Proposals must be complete when submitted; changes or additions will not be accepted after
the specified due date and time, except for any clarifications requested of bidders by the Trust. The Trust
encourages bidders to submit their proposals with sufficient time to account for any technological
challenges (e.g., Internet disruptions).
1.7 Submitting Questions
It is the responsibility of all bidders and other interested parties to examine the entire RFP and to seek
clarification, in writing, if they do not understand any information or instructions. Questions regarding this
RFP must be submitted by email to the Designated Contact Person listed in section 1.2 prior to the due
date for questions noted above in section 1.3. Responses to questions will be posted on
https://www.efficiencymaine.com/opportunities/rfp-em-004-2026/, as will all clarifications and
amendments released in regard to the RFP. It is the responsibility of all interested parties to check this
website periodically to obtain clarifications and amendments. Only those clarifications and amendments
posted on this website are considered binding.
1.8 Proposal Confidentiality
Information provided to the Trust is subject to the Maine Freedom of Access Act (FOAA), 1 M.R.S. §§ 401
et seq. Bidders should assume that all information submitted in response to this RFP will be considered
public records available for public inspection pursuant to the Maine FOAA following announcement of an
award decision.
Bidders should be aware that general language regarding confidentiality in a proposal will not serve to
exempt a proposal from public disclosure. If a bidder believes that its bid contains confidential information
protected by statute, they will need to specify what they claim as protected information, state the specific
statutory basis for exemption from public disclosure, and seek a specific determination from the Efficiency
Maine Trust Board of Trustees. Under no circumstance will pricing elements of a bid be considered
confidential.

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 5
1.9 Contract Award
The Trust will notify all bidders of the contract award decision by email. The Trust reserves the right to
negotiate the final terms and conditions of the contract award with a winning bidder whose proposal is
selected by the Trust, and to reject any winning bidder with whom the Trust cannot agree to terms and
conditions meeting the Trust’s needs, in the Trust’s sole judgment. The Trust reserves the right to reject
any proposal that does not meet these requirements.
1.10 Contracting Process
The selection process is governed by the Efficiency Maine Trust Rule Chapter 1: Contracting Process for
Service Providers and Grant Recipients, which can be found on the Trust’s website:
https://www.efficiencymaine.com/docs/Chapter-1-Contracting-Process-for-Service-Providers-and-Grant-
Recipients.pdf.
1.11 RFP Process – Reservation of Rights
The Trust reserves the right to cancel or extend the RFP process at any time, and to issue clarifications and
amendments to the RFP. The Trust also reserves the right to reject noncompliant submissions in response
to this RFP. The Trust, in its sole discretion, reserves the right to recognize and waive minor informalities
and irregularities found in proposals received in response to this RFP. Issuance of this RFP does not
commit the Trust to make an award. The Trust will not pay any costs or expenses incurred by a bidder in
connection with preparation of a proposal or response to this RFP.
1.12 Contract Agreements
A copy of the Efficiency Maine Trust Maine Electric Vehicle Charging Incentive Agreement is provided as
Attachment B – Standard Agreement for EV Charging Incentives Using NEVI/BIL Funds.
1.13 Request for Reconsideration
An aggrieved person may request a hearing for reconsideration of a contract award decision by filing a
written petition with the Executive Director of the Trust within 14 calendar days of the notification of the
contract award. Each petition to reconsider must meet the requirements specified in Efficiency Maine
Trust Rule Chapter 1, Contracting Process for Service Providers and Grant Recipients, Section 5(B), which
can be found on the Trust’s website under Documents and Services:
https://www.efficiencymaine.com/docs/Chapter-1-Contracting-Process-for-Service-Providers-and-Grant-
Recipients.pdf.

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 6
SECTION 2 – BACKGROUND INFORMATION
2.1 Efficiency Maine Trust
Efficiency Maine is the independent, quasi-state agency established to plan and implement energy
efficiency programs in Maine. Through its suite of nationally recognized programs, the Trust provides
consumer information, marketing support, demonstration pilots, discounts, rebates, loans, and other
initiatives to promote high-efficiency equipment and operations that help Maine’s homes, businesses, and
institutions reduce their energy costs and lower their greenhouse gas emissions. The result is job growth,
better grid reliability, improved energy independence, a stronger local economy, and critical progress
toward meeting the State’s climate change goals. The Trust is governed by a Board of Trustees with
oversight from the Maine Public Utilities Commission.
2.2 Background
The Maine Legislature designated the Trust to administer funds dedicated to expanding the availability of
public EV charging infrastructure in Maine1.
The initiative covered by this RFP has received and will be deploying funds from the National Electric
Vehicle Infrastructure (NEVI) Formula program, which uses resources from the Infrastructure Investment
and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL). The NEVI funds will be disbursed
consistent with the Maine’s Plan for EV Infrastructure Deployment, which can be accessed on Efficiency
Maine’s website.
2.3 Project Objectives and Goals
Efficiency Maine seeks qualified bidders to install and operate public DC fast chargers (DCFC) for electric
vehicles (EVs) within one (1) driving mile of select roadway exits or routes described in section 2.9 of this
RFP.
2.4 Definitions
The following definitions will apply in this RFP and are a modified version of the definitions found in the
Federal Highway Administration National Electric Vehicle Infrastructure Standards and Requirements.
(Title 23, CFR Chapter I, Subchapter G, Part 680):
1. Charging Network: A collection of Chargers located on one or more property(ies) that are
connected via digital communications to manage the facilitation of payment, the facilitation of
electrical charging, and any related data requests.
2. Charging Network Provider: The entity that operates the digital communication network that
remotely manages the EV Chargers. Charging Network Providers may also serve as Charging
Station Operators and/or manufacture EV Chargers.
3. Charging Port: The system within an EV Charger that charges one (1) EV. A Charging Port may have
multiple Connectors, but it can only provide power to charge one EV through one Connector at a
time.
4. Charging Station: Refers to the area in the immediate vicinity of a group of EV Chargers and
includes the EV Chargers, supporting equipment, parking areas adjacent to the EV Chargers, and
1 https://legislature.maine.gov/statutes/35-A/title35-Asec10125.html

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 7
lanes for vehicle ingress and egress. A Charging Station could comprise only part of the Host Site
on which it is located.
5. Charging Station Operator: The entity that operates and maintains the Chargers and supporting
equipment and facilities at one or more Charging Stations. In some cases, the Charging Station
Operator and the Charging Network Provider are the same entity. In other cases, the Charging
Station Operator may be the property owner or a third party.
6. Combined Charging System (CCS): A standard Connector interface that allows DCFC EV Chargers
to connect to, communicate with, and charge EVs.
7. Connector: Refers to the device that attaches an EV to a Charging Port in order to transfer
electricity. Multiple connectors and connector types (such as CCS and NACS/J3400) can be
available on one charging port, but only one vehicle will charge at a time. Connectors are
sometimes called plugs.
8. Contactless Payment Methods: A secure method for consumers to purchase services using a
debit, credit, smartcard, or another payment device by using radio frequency identification (RFID)
technology and near-field communication (NFC).
9. Demand Charge: Electric utility charge based on maximum demand observed during the billing
period, designed to recover utility capacity costs. These are typically a separate line item on
customer bills.
10. Direct Current Fast Charger (DCFC): A Charger that uses a 3-phase, 480-volt alternating-current
(AC) electrical circuit to enable rapid charging through delivering a direct-current (DC) electricity to
the EV. Sometimes also referred to as a “Level 3 charger”.
11. Distributed Energy Resource: Small, modular, energy generation and storage technologies that
provide electric capacity or energy where it is needed.
12. Downtime: A period of time when a Charging Port’s hardware or software are not online and
available for use, or the Charging Port does not successfully dispense electricity as expected.
Downtime does not include outages for reasons outside the Charging Station Operator’s control,
such as electric utility service interruptions, internet or cellular service provider interruptions and
outages caused by the vehicles, provided that the Charging Station Operator can demonstrate that
the Charging Port would otherwise be operational.
13. Electric Vehicle (EV): An motor vehicle that is either partially or fully powered on electric power
received from an external source. For the purposes of this RFP, this definition does not include
golf carts, electric bicycles, or other micromobility devices.
14. EV Charger / Charger: A device with one or more Charging Ports and Connectors for charging EVs.
15. Eligible Segment: A span of roadway located in Maine along which this RFP seeks qualified bids.
The parameters for an Eligible Segment are articulated in section 2.9 of this RFP.
16. Host Site: A property at which the grant recipient obtains the right and authority to install,
operate, and maintain charging stations during the five-year agreement.
17. Host Site Agreement: Refers to the enforceable written agreement, whether styled as a lease or
occupancy agreement, under which the grant recipient obtains the right and authority to install,
operate, and maintain Charging Stations at a Host Site during the five-year agreement.
18. Open Charge Point Interface (OCPI): An open-source communication protocol that governs the
communication among multiple Charging Networks, other communication networks, and software
applications to provide information and services for EV drivers.
19. Open Charge Point Protocol (OCPP): An open-source communication protocol that governs the
communication between EV Chargers and the Charging Networks that remotely manage the EV
Chargers.
20. Plug and Charge: A method of initiating charging, whereby EV charging customers plug a
Connector into their vehicle and their identity is authenticated through digital certificates defined

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 8
by ISO-15118, a charging session initiates, and a payment is transacted automatically, without any
other customer actions required at the point of use.
21. Power Sharing: Means dynamically limiting the charging power output of individual charging ports
at the same charging station to ensure that the sum total power output to all EVs concurrently
charging remains below a maximum power threshold. This is also called automated load
management.
22. Secure Payment Method: Means a type of payment processing that ensures a user’s financial and
personal information is protected from fraud and unauthorized access.
23. Smart Charge Management: Means controlling the amount of power dispensed by chargers to
EVs to meet customers’ charging needs while also responding to external power demand or
pricing signals to provide loan management, resilience, or other benefits to the electric grid.
24. Uptime: Refers to a period of time when a Charging Port’s hardware and software are both online
and available for use, or in use, and the Charging Point successfully dispenses electricity as
expected.
2.5 Additional Sources of Information
Following are links to information that bidders may find helpful in preparing a response to this RFP:
TITLE LOCATION (link)
Efficiency Maine Website https://www.efficiencymaine.com/
Efficiency Maine Triennial Plan https://www.efficiencymaine.com/about/library/policies/
Efficiency Maine Public EV Charging
Initiatives
https://www.efficiencymaine.com/at-work/electric-vehicle-supply-
equipment-initiative/
Maine Accessible EV Charging Guide and
Checklists
https://www.efficiencymaine.com/docs/Maine_EV_Charging_Guide_
and_Checklists.pdf
2.6 Incentives
Grant funds awarded from Efficiency Maine through this RFP will be used to cover (1) the capital incentive
and (2) the demand charge incentive.
The capital incentive will provide up to 80% of eligible project costs (excluding utility demand charges) up
to $800,000 per site net of expected federal tax credits and any federal, state, or private grants. Eligible
and ineligible costs are described in more detail below. The amount of the capital incentive to be paid by
Efficiency Maine, on a reimbursement basis, will be the lesser of (a) the Efficiency Maine Grant Funds
Requested (see the Project Cost Proposal Form) in the bid or (b) 80% of eligible costs (excluding demand
charges) actually incurred as documented in receipts and paid invoices, net of federal tax credits and any
federal, state, or private grants. To increase its score on the “Cost” category, bidders are encouraged to
request a capital incentive that is less than the cap; the award will be limited to the amount bid. Awardees
will be required to provide Efficiency Maine a surety bond(s) or letter of credit(s) in the amount of the
awarded capital incentive.
The demand charge incentive, separate from and in addition to the capital incentive, will provide up to
80% of utility demand charge costs actually incurred in the first five years of operation, up to a cap of
$200,000 per site. Proposals to upgrade existing chargers are not eligible for a demand charge incentive.
To increase its score on the “Cost” criteria, the bidder may bid a demand charge incentive that is less than
the cap; the award will be limited to the amount bid.

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 9
The demand charge incentive will be paid quarterly, as a reimbursement for actual charges incurred and
paid, net of any service credit applied by Efficiency Maine pursuant to the Service Level Agreement (SLA)
prescribed in Rider B of Attachment B – Sample Contract for EV Charging Stations Using NEVI/BIL Funds.
If a bidder requests a demand charge incentive of less than $100,000 (including $0), the bidder will be
required to provide to Efficiency Maine separate surety bond(s) or letter(s) of credit (in addition to one for
the capital incentive) sufficient to ensure coverage in the amount of $20,000 for each of the first five years
of operation of the charging station(s). Efficiency Maine will use this to secure the bidder’s potential
Service Credit liability and from which Efficiency Maine can collect any service credit assessed by Efficiency
Maine pursuant to the Service Level Agreement (SLA) prescribed in Rider B of the Standard Agreement
(see Attachment B).
To be eligible for a demand charge incentive, the DC fast charger(s) installed under this award must be
metered separately from other loads. In the event additional chargers are added in future years to the
same meter, the demand charge incentive will be limited to the demand charges associated with the load
of original charger(s) on the meter. The winning bidder(s) will be responsible for installing metering
equipment approved by Efficiency Maine that will provide Efficiency Maine with sufficient information to
disaggregate any new load.
2.7 Eligible Costs
The costs of the following items are eligible for the capital incentive under this RFP:
1. DCFC units (including the required number of CCS connectors for each site as specified in section
3.2), NACS connectors, power conversion hardware, and associated equipment);
2. Electrical system costs, not covered by the utility, of connecting the chargers to the panel and the
utility distribution system;
3. Other hard costs (concrete, conduit, wire, signage, bollards, other equipment and materials, etc.)
directly related to the installation of the chargers;
4. Services costs and personnel costs incurred for site design and preparation, charger design and
engineering, permitting, and project management during the development, construction and
installation phase but not after the chargers are put into commercial operation;
5. Shipping of hardware;
6. Extended warranties or maintenance contracts for a period not to exceed five (5) years when
billed and paid as a single, upfront, lump-sum cost;
7. Hardware and software used to make the chargers “networked,” plus networking subscription
costs for the first five years of operation when billed and paid as a single, upfront, lump-sum cost;
8. Battery energy storage systems (BESS) and related equipment that are dedicated to reducing the
load associated with the chargers funded by this RFP; and
9. EVITP registration fees for licensed electricians involved in the installation of charging equipment
funded by this RFP.
The costs of the following items are eligible for the demand charge incentive under this RFP:
1. Utility “demand charges” for the first five years of operation net of any service credit applied by
Efficiency Maine pursuant to the Service Level Agreement (SLA) prescribed in Rider B of
Attachment B – Sample Contract for EV Charging Stations Using NEVI/BIL Funds.

{P2489414.5} Version 2025_5 Page 10
2.8 Ineligible Costs
The costs of the following items or activities are not eligible for use of the funding from this RFP, (i.e.,
these costs may not be included in Attachment A – Project Cost Proposal Form and to the extent bidders
incur these costs, the costs will not be eligible for reimbursement from the funds awarded through this
RFP):
1. Purchase or rental of real estate;
2. All operating costs (other than those enumerated above in section 2.7, including but not limited to
electricity bills, management and legal costs, insurance, and snow removal;
3. Costs related to DC fast charging investments that have been publicly announced;
4. Costs related to DC fast charging investments that are required by an original equipment
manufacturer (OEM) for a licensed motor vehicle dealer to sell any make or model of EV in Maine;
5. Any costs claimed as eligible costs under a prior incentive award from Efficiency Maine for EV
charging infrastructure.
2.9 Eligible Segments
The physical location of proposed DC fast charging sites must be within one (1) driving mile of select
roadway exits or routes described below:
Auburn to Lewiston
• I-95 Exit 75 or Exit 80
Brunswick to Topsham
• I-295 Exit 28 or Exit 31; or
• Route 1 in Brunswick, west of Federal Street
Wiscasset to Damariscotta
• Route 1
Ellsworth
• Route 1
Skowhegan
• Route 2; or
• Route 201
Newport/Palmyra
• Route 2; or
• I-95 Exit 157
Hermon/Hampden to Bangor and Brewer
• I-95 Exits 180-187; or
• I-395 Exits 1A-6B; or
• Route 1A
Medway
• I-95 Exit 244
Efficiency Maine will seek to maximize the number of sites that can be awarded using the incentive dollars
available along designated eligible segments.
Applicants may submit a single bid to develop and serve multiple sites but must submit individual site
descriptions and proposal information including Project Cost Proposal Forms for each site.

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 11
SECTION 3 – SCOPE OF WORK
3.1 Primary Project Requirements and Tasks
Bids submitted in response to this RFP must identify a lead party who is referred to, for purposes of this
RFP, as the Recipient. In the event the bid is awarded, the Recipient will be the named party on the
resulting contract with Efficiency Maine and will be responsible for overall compliance with the terms of
the contract and receiving the incentives paid by Efficiency Maine. The Recipient will be responsible for
providing electric vehicle (EV) charging hardware, installation, and network operations for publicly
available, universal EV charging services to consumers.
The required scope of work covers hardware and software necessary to operate DCFC; equipment,
materials and infrastructure directly associated with the operation of DC fast-charging stations; site
selection, design, engineering, construction and installation of the specified charging stations; network
operations; and maintenance and support through the period of performance (extending five years from
the date the chargers become operational). All charging stations must be commissioned and completed
within two (2) years of award announcement date. Task objectives, deliverables, timelines, technical
specifications and requirements are outlined in the following sub-sections.
The funds that Efficiency Maine will use to pay awarded projects derive from the Federal Highway
Administration (FHWA) National Electric Vehicle Infrastructure (NEVI) Formula program and, therefore,
projects funded under this RFP will be required to comply with Federal Highway Administration Title 23,
CFR Chapter I, subchapter G, Part 680 - The National Electric Vehicle Infrastructure Standards and
Requirements2.
Further, the Recipient is required to observe certain federal requirements described in:
1. Appendix II to 2 CFR Part 200 – Contract Provisions for Non-Federal Entity Contracts Under Federal
Awards;
2. Federal Highway Administration (“FHWA”) regulations set forth in 23 C.F.R. §680.118 of the
National Electric Vehicle Infrastructure Standards and Requirements, which include but are not
limited to:
a. Buy America Requirements – 23 U.S.C. §313. Pursuant to 23 C.F.R. §680.118(a), the Buy
America requirements set forth in 23 U.S.C. §313 apply to EV charger projects using NEVI
Program Funds. See Rider C-1 for additional details;
b. Davis Bacon Federal Wage Requirements – 40 U.S.C. 3141-3148; 29 CFR Part 5. Pursuant
to 23 U.S.C. §109(s)(2) and 23 C.F.R. §680.118(b), projects to install EV chargers are
treated as if the project is located on a Federal-aid highway and, therefore, Davis Bacon
Federal wage requirements apply to the project. Statutorily prescribed wages must be
paid for any project funded with NEVI Formula Program Funds;
c. Americans with Disabilities Act requirements; and
3. FHWA Form FHWA-1273 (Required Contract Provisions – Federal-Aid Construction Contracts).
2 https://www.federalregister.gov/documents/2023/02/28/2023-03500/national-electric-vehicle-
infrastructure-standards-and-requirements

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 12
These and other applicable Federal statutory and regulatory requirements are included in Attachment B –
Sample Contract for EV Charging Stations Using NEVI/BIL Funds as Rider C-1 Federal EV Funds Contract
Requirements.
At a minimum, the winning bidder must conduct the following primary tasks:
3.2 Install EV Charging Stations Meeting the Following Requirements
1. Installation –
The award recipient is responsible for achieving completed installations at each Host Site, to
include:
a. Obtain all applicable local, state, and federal permits required for installation and
operation of the EV chargers;
b. Ensure that the workforce installing, maintaining, and operating chargers meet the
following standards as required by Section 680.106(j) of the NEVI Standards:
i. Except as provided in paragraph (b)(ii) of this section, all electricians installing,
operating, or maintaining EV Chargers must meet one of the following
requirements:
1. Certification from the Electric Vehicle Infrastructure Training Program
(EVITP).
2. Graduation or a continuing education certificate from a registered
apprenticeship program for electricians that includes charger-specific
training and is developed as a part of a national guideline standard
approved by the Department of Labor in consultation with the
Department of Transportation.
ii. For projects requiring more than one electrician, at least one electrician must
meet the requirements above, and at least one electrician must be enrolled in an
electrical registered apprenticeship program.
iii. All other onsite, non-electrical workers directly involved in the installation,
operation, and maintenance of chargers must have graduated from a registered
apprenticeship program or have appropriate licenses, certifications, and training
as required by the State.
c. Ensure that all installation work as it pertains to site preparation, curbing, striping,
signage, charging equipment, billing and networking systems, and electrical
interconnections are installed:
i. consistent with the manufacturers’ specifications;
ii. consistent with the project design and specifications proposed in the bid;
iii. in accordance with all applicable local, state, and federal zoning and code
requirements; and
iv. is working properly;
d. Coordinate the installation activities with the equipment manufacturer, Host Site owner,
networking service, electric utility, and any sub-contractors needed to complete the work.
2. Charging Equipment Requirements –
The charging equipment at each Host Site that is subject to a financial incentive through this RFP
must:
a. Be new, and unused (not refurbished or remanufactured);
b. Meet the following minimum specifications:

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 13
i. Must have not less than four (4) and not more than eight (8) network-connected
DCFC charging ports per site and be capable of simultaneously charging at least
four EVs;
ii. All charging connectors must meet applicable industry standards. Each DCFC
charging port must be capable of charging any CCS-compliant vehicle and each
DCFC charging port must have at least one permanently attached CCS Type 1
connector. (Per NEVI Q&A, 23 CFR 680.106(c)) permanently attached non-
proprietary connectors (such as NACS) may be provided on each Charging Port so
long as the requirements of 23 CFR 680 are met, including that each DCFC
Charging Port has at least one permanently attached Combined Charging System
(CCS) Type 1 connector capable of charging a CCS-compliant vehicle.
iii. DCFC charging ports must support output voltages between 250 volts DC and 920
volts DC. Chargers must have a continuous power delivery rating of at least 150
kilowatt (kW) and supply power according to an EV's power delivery request up to
at least 150kW, simultaneously from each charging port at a charging station.
DCFCs may conduct power sharing so long as each charging port continues to
meet an EV’s request for powerup to 150 kW.
c. Include all cables, connectors, interfaces, documentation for all components, and any
other items necessary for full operation;
d. Be factory calibrated (as applicable) prior to, or during installation, in accordance with the
Original Equipment Manufacturer (OEM) standards;
e. Include all standard manufacturer accessories;
f. Use the most current software version available as of the time it is installed;
g. Have the ability to stop the flow of power when not in use; and should have over-current
protection to prevent vehicles from drawing too much power;
h. Be certified by the Underwriters Laboratories, Inc. (UL), or another Occupational Safety
and Health Administration Nationally Recognized Testing Laboratory to the appropriate
Underwriters Laboratories (UL) standards for EV charging system equipment;
i. Include physical and cybersecurity features to ensure charging station operations protect
consumer data and protect against the risk of harm to, or disruption of, charging
infrastructure and the grid;
j. Be able to withstand extreme weather conditions, including temperature extremes,
flooding, ice, heavy snow or rain, and high winds and is protected from malfunctions due
to condensation;
k. Include barriers or other configurations to prevent damage from equipment used for
snow removal;
l. Include screen displays that are user friendly and easy to operate (display should be LCD,
LED or equivalent, or better and should be readable in direct sunlight and at night);
m. Be tamper-proof and deter vandalism;
n. Incorporate a cord management system or method to minimize the potential for cable
entanglement, user injury, or connector damage from lying on the ground, and comply
with National Electrical Code (NEC) Article 625 as it applies to cord management systems;
and
o. Comply with all NEC and Federal Communications Commission regulations for safety and
operation requirements.
3. Interoperability of Electric Vehicle Charging Infrastructure –

Efficiency Maine Public DCFC: Phase 10 RFP EM-004-2026
{P2489414.5} Version 2025_5 Page 14
a. Charger-to-EV Communication. Chargers must conform to ISO 15118-3 and must have
hardware capable of implementing both ISO 15118-2 and ISO 15118-20. Charger software
must conform to ISO 15118-2 and be capable of Plug and Charge. Conformance testing for
charger software and hardware should follow ISO 15118-4 and ISO 15118-5, respectively.
b. Charger-to-Charger-Network Communication. Chargers must conform to Open Charge
Point Protocol (OCPP) 1.6J or higher. Chargers must conform to OCPP 2.0.1.
c. Charging-Network-to-Charging-Network Communication. Charging networks must be
capable of communicating with other charging networks in accordance with Open Charge
Point Interface (OCPI) 2.2.1.
d. Network Switching Capability. Chargers must be designed to securely switch charging
network providers without any changes to hardware.
4. Charging Network Connectivity of Electric Vehicle Charging Infrastructure –
a. Charger-to-Charger-Network Communication.
i. Chargers must communicate with a charging network via a secure communication
method. Chargers must conform to Open Charge Point Protocol (OCPP) 2.0.1.
ii. Chargers must have the ability to receive and implement secure, remote software
updates and conduct real-time protocol translation, encryption and decryption,
authentication, and authorization in their communication with charging networks.
iii. Charging networks must perform and chargers must support remote charger
monitoring, diagnostics, cont

[... truncated ...]