University of California, Riverside · Campus Solar Roof Initiative (Project No. 950581)🟡 Some evidence
Type / status
rfp · closed
Amount
2,250,000 USD
Deadline
2020-06-17 (past)
“Technical Proposal Submittal is due from Proposers and will be received only at UCR, Planning, Design & Construction, 1223 University Avenue, Suite 240, Riverside, CA 92507. The Technical Proposal Submittal is defined in the Technical Proposal. Pending COVID-19 Guidelines, location of delivery will change and issued via Addendum. June 17, 2020 2:00 PM”
5%· poor fit · The Venture23 Aleo team works on zk, privacy, and blockchain infrastructure with a Rust/Leo/Leo tech stack, which is entirely unrelated to a university campus solar roof construction project.
Trust
91%· model self-report 95% · first seen 2026-10-26 · v1
Verified
2026-10-26 · by extraction
The University of California, Riverside seeks a prequalified design-build team to design, construct, and commission a photovoltaic system on two campus buildings (Student Services Building and Student Recreation Center South) with a maximum acceptance cost of $2,250,000. Proposals are accepted only from prequalified design-builders and must include technical and lump sum price proposals. The deadline for both proposal submissions is June 17, 2020 at 2:00 PM.
Eligibility: Open only to prequalified Design Build teams. Proposers must be prequalified by the University of California for design-build services relating to this project.
Pipeline
Funder track record · does University of California, Riverside actually pay grants?
🟡 Some payout evidence · 5 grantees found · last payout 2024-12-17 · checked 2026-10-26 · 0 forum reports, 4 web pages read, 4 unverifiable claims dropped
Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.
Grantee
Amount
Date
Evidence
Scientists from UC Berkeley, UC Santa Cruz and UC San Francisco
—
2024-12-17
“Scientists from UC Berkeley, UC Santa Cruz and UC San Francisco will use cell samples from patients with autism spectrum disorder to grow self-organizing, 3D clumps of neurological tissue in a lab.”source
Scientists at UC San Diego, UC Berkeley and UC Riverside
—
2024-12-17
“Scientists at UC San Diego, UC Berkeley and UC Riverside aim to climate-proof agriculture by redesigning dirt.”source
Researchers at UC Santa Barbara, UC Davis, UC Irvine and UC San Francisco
—
2024-12-17
“Researchers at UC Santa Barbara, UC Davis, UC Irvine and UC San Francisco aim to better understand how hotter and more frequent heat waves are affecting California's 6 million public school students.”source
Georgia State University
—
undated
“In 2011, Georgia State University (GSU) introduced the Panther Retention Grant”source
University of Central Florida
—
undated
“University of Central Florida (UCF) implemented a similar effort—the Knights Success Grant”source
Trust breakdown (3/3 checkable facts verified)
Signal
Weight
Result
Note
deadline
0.35
100%
quoted in source
amount
0.25
100%
figure appears in source
funder
0.075
100%
named in source
source quality
0.15
50%
social or search hit
model confidence
0.1
95%
model self-report
Fit breakdown (against the ORG_* profile)
Signal
Weight
Result
Note
model fit
0.5
10%
model rated 10%
ecosystem overlap
0.25
0%
none vs aleo
category overlap
0.15
0%
other vs zk, privacy, infra, dev_tooling, security, interoperability
REQUEST FOR PROPOSALS
(BID DOCUMENTS)
FOR
CAMPUS SOLAR ROOF INITIATIVE
(PROJECT NO. 950581)
UNIVERSITY OF CALIFORNIA
RIVERSIDE, CALIFORNIA
COUNTY OF RIVERSIDE
CALIFORNIA
May 21, 2020
BIDDING INQUIRIES
Betty Osuna
Contract Administrator
(951) 827-4590 / betty.osuna@ucr.edu
Planning, Design & Construction
1223 University Avenue, Suite 240
Riverside, CA 92507
Campus Solar Roof Inistiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
May 7, 2008 Index of Contract Document
Page 1 of 1
INDEX OF CONTRACT DOCUMENTS
(Contents)
01 Cover Page
02 Index of Proposal Documents
REQUEST FOR PROPOSAL (Bid Documents)
03 Proposal Schedule
04 Request for Proposal
05 Technical Proposal
06 Lump Sum Base Price Proposal Form
07 Bid Bond
08 Lump Sum Base Price Proposal Spreadsheet
09 Proposal Evaluation Process
10 Preliminary Schedule
DESIGN BUILD CONTRACT
11 Agreement
12 General Conditions
13 Supplementary Conditions
14 Basis of Design and Performance Specifications
15 Project Directory
16 Scope of Work
17 Design Professional Rate Schedule for Additional Services
18 General Requirements (Division 01)*
19 Proposal
STANDARD CONTRACT FORMS (EXHIBITS)*
20 Standard Contract Forms Table of Contents
UNIVERSITY FURNISHED INFORMATION*
21 University Furnished Information Table of Contents
*Document is only issued via Weblink on the “REQUEST FOR PROPOSALS”
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
UC Rev. 0, August 1, 2007 Proposal Schedule
UCR Rev 2011-08-23
PROPOSAL SCHEDULE
ACTIVITY DATE TIME
A RFP will be available to Prequalified Proposers, subcontractors and design consultants. May 22,2020 2:00 PM
B Pre-Proposal Conference – Mandatory for all Prequalified Proposers. Via Zoom. May 22, 2020 10:00 AM
C
The University will hold a Confidential One-on-One meeting with each Proposer prior to the Technical
Proposal Submittal for the purpose of answering questions, clarifying RFP and program requirements,
reviewing and validating preliminary designs etc. Meeting location: Zoom Conference
May 29, 2020 RTS-112 9:15 AM
RTS-114 10:30 AM
D
Technical Proposal Submittal is due from Proposers and will be received only at UCR, Planning, Design &
Construction, 1223 University Avenue, Suite 240, Riverside, CA 92507. The Technical Proposal Submittal is
defined in the Technical Proposal. Pending COVID-19 Guidelines, location of delivery will change and issued
via Addendum.
June 17, 2020 2:00 PM
E
Lump Sum Base Price Proposal Submittal is due from Proposers and will be received only at UCR, Planning,
Design & Construction, 1223 University Avenue, Suite 240, Riverside, CA 92521-2450. The Lump Sum Base
Price Proposal Submittal is defined in the Lump Sum Base Price Proposal. Pending COVID-19 Guidelines,
location of delivery will change and issued via Addendum.
June 17, 2020 2:00 PM
F The University’s Technical Review Committee will meet to review timely submitted Technical Proposals as
described in the Proposal Evaluation Process document. June 22, 2020
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
UC Rev. 0, August 1, 2007 Proposal Schedule
UCR Rev 2011-08-23
G Proposers shall make an Oral Presentation and describe the best value aspects of their proposals. Cost shall
not be discussed during the Oral Presentation. June 23, 2020 RTS-114 09:00 AM
RTS-112 10:30 AM
H
Timely submitted Lump Sum Base Price Proposals shall be publicly opened at UCR, Planning, Design &
Construction via Zoom, University will acknowledge the timely receipt of submittals and whether or not the
submittals appear to be responsive. No cost or point scoring information will be disclosed to the public at this time.
June 24, 2020 10:00 AM
I The University will issue Notice to Proceed for Phases 1 & 2 to the successful proposer. June 29, 2020
Late Proposals: Any proposal, modification, or revision that is received at the designated University of California, Riverside, Planning, Design &
Construction location after the exact time specified for receipt of proposals is “late” and will not be considered unless it was the only proposal received.
Late proposals and modifications that are not considered will be held unopened, unless opened for identification, and then returned to the Proposer
after award.
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 1 of 12 Request for Proposal
REQUEST FOR PROPOSAL
CONTENTS
1. INTRODUCTION..................................................................................................................................... 2
1.1 Purpose ...................................................................................................................................... 2
1.2 Project Description ..................................................................................................................... 2
1.3 Proposal Documents .................................................................................................................. 3
1.4 Maximum Acceptance Cost ....................................................................................................... 4
1.5 Basis of Selection and Contract Award...................................................................................... 4
1.6 General Proposal Requirements, Terms and Provisions........................................................... 5
2. THE WORK ............................................................................................................................................. 8
2.1 General Requirements ............................................................................................................... 8
2.2 Architectural/Engineering Consultants ....................................................................................... 9
2.3 University Controlled Insurance Program .................................................................................. 9
2.4 Subcontractors ........................................................................................................................... 9
2.5 Work Phases ............................................................................................................................ 11
3. CONTRACT SUM ................................................................................................................................. 11
4. MANDATORY PROPOSAL REQUIREMENTS ................................................................................... 12
5. PROPOSAL MODIFICATIONS OR WITHDRAWALS ......................................................................... 12
6. PROPOSAL (BID) PROTEST .............................................................................................................. 13
7. CONFLICTS .......................................................................................................................................... 14
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 2 of 12 Request for Proposal
1. INTRODUCTION
The Regents of the University of California (the “University”) intend to award a contract to the prequalified
Design Build team (the “Proposer”) that is deemed to offer the best value for design build services to
construct the Campus Solar Roof Initiative project (the “project”) located on the University of California,
Riverside campus.
The University of California has completed the prequalification process for design build services relating
to the project. Proposals will be accepted only from prequalified Design Builders, herein after
referred to as “Proposers.” This Request for Proposal (RFP) establishes the requirements for proposal
submission.
The University reserves the right to reject any, or all, proposals or to withhold the award of this project for
any reason it may determine.
1.1 Purpose
The University’s primary objective in utilizing the design build approach for this project is to bring
the best available design and construction experience and expertise together to work with the
University as a team, and successfully meet the requirements of this project.
The University desires to select a responsive, highly qualified Proposer to deliver a design build
project that fully meets the University’s established needs and expectations with respect to the
scope of work, budget, quality, functionality, flexibility, and operational design standards. The
design build approach is intended to allow designers and contractors to work together to address
each project requirement and to deliver an effective and comprehensive project that meets all the
established requirements.
The University requests integrated solutions with quality design and construction within the
established Maximum Acceptance Cost.
1.2 Project Description
The overall goal of this effort is for the University to obtain the services of a design/build
contracting team to design, construct, and commission a PV system on two targeted campus
buildings. The PV system is expected to provide the maximum generation of renewable power
with minimum impact on each building; while also integrating the photovoltaic production into the
building(s) and campus electrical systems. Furthermore, the PV system is to include provisions
for future integration into the University building management systems (BMS) to monitor and
trend energy (kWh), instantaneous power (kW), and calculate carbon/greenhouse gas savings in
metric tons (tonnes).
Reliable and predictable power with minimal annual degradation in output, as well as predictable
maintenance, is desirable for a minimum of 25 years. The roof warranty is to be retained and
extended as a part of the delivered system. To extend and incorporate the roof warranty, a
coating and/or other roofing enhancements are anticipated. The project will be considered
complete after the system has been fully accepted by the University and proven to be fully
operational for one month.
BUILDINGS
Student Services Building
The Student Services building was constructed in 2007 and has a gross rooftop area of
approximately 17,850 square feet. An existing air handling unit resides on the rooftop, which is
the largest obstruction to avoid by the proposed solar PV system. The remaining
features to avoid are the roof drains and the roof access hatch.
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 3 of 12 Request for Proposal
Student Recreation Center South
The Student Recreation Center (South) was constructed in 2013 and has a total rooftop area of
approximately 47,400 square feet. This rooftop has several existing features that will impede on
the available area for solar PV installation. The largest obstruction is the mechanical
equipment enclosure and exterior ductwork. Secondary to the mechanical equipment, there is
also fall protection, a lightning grounding system, roof drains, and the roof access hatch.
1.3 Proposal Documents
Proposers must comply with the specific requirements herein as well as the provisions contained
in the Design Build Agreement (the “contract”). By submitting its proposal, the Proposer agrees
to all of the terms and conditions contained therein and further agrees, if selected for award, to
execute a contract including such terms and conditions.
The University makes copies of the RFP Documents available, on the aforementioned terms, for
the sole purpose of obtaining proposals for the Work (as defined in Section 2, The Work) and
does not confer a license or grant permission for any other use of the Proposal Documents.
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 4 of 12 Request for Proposal
This RFP includes the Proposal Documents listed below for use by Proposers in the preparation of their
proposals and for incorporation into the awarded contract.
.1 REQUEST FOR PROPOSAL DOCUMENTS: .2 DESIGN BUILD CONTRACT / EXHIBITS:
a. Proposal Schedule a. Agreement
b. Request for Proposal b. General Conditions
c. Technical Proposal c. Supplementary Conditions
d. Lump Sum Base Price Proposal d. Design Criteria
e. Price Proposal Form e. Project Directory
f. Bid Bond f. Project Planning Guidelines
g. Lump Sum Base Price Proposal Spreadsheet g. Scope of Work
h. Proposal Evaluation Process h. General Requirements (Division 01)
i. Preliminary Schedule
i. Design Professional Rate Schedule for
Additional Services
j. University Furnished Information j. Proposal
k. Standard Contract Forms (Exhibits)
1.4 Maximum Acceptance Cost
.1 The Maximum Acceptance Cost (MAC) for this project has been established by the
Regents of the University of California as $ 2,250,000
The MAC represents the maximum total available funding for contract award.
.2 Proposals submitted that exceed the MAC will be deemed nonresponsive and excluded
from consideration for contract award.
The MAC = Lump Sum Base Price Proposal (including any applicable design fees)
1.5 Basis of Selection and Contract Award
Selection shall be based upon a “best value” determination, which is calculated on a “cost per point”
basis as identified in the Proposal Evaluation Process section in this RFP. The responsive
Proposer with the lowest best value score (lowest cost per technical point) and with a Price
Proposal that does not exceed the MAC will be determined to be the apparent Lowest Responsible
Proposer. University will have the right to waive nonmaterial irregularities in a proposal.
University will select the best value proposal and notify such Proposer on University's form within
three (3) weeks after the proposal deadline or reject all proposals. Within 10 days after receipt of
the Notice of Selection as the successful Proposer, Proposer shall submit the following items:
.1 One (1) original of the Agreement signed by Design Builder.
.2 One (1) original of the Payment Bond required under Article 11 of the General Conditions.
.3 One (1) original of the Performance Bond required under Article 11 of the General
Conditions.
.4 Original Certificates of Insurance on the form provided by University required under Article 11
of the General Conditions.
.5 Fully executed “Declaration of Contractor or Subcontractor’s Minimum Occupational Safety
and Health Qualifications” form. Proposer need not submit this form with proposal if it was
previously submitted during the prequalification process.
.6 If Proposer wishes to utilize securities in lieu of retention or deposit retention into escrow
beginning with the initial Application for Payment, (1) Selection of Retention Options
accompanied by (1) completed Escrow Agreements for Deposit of Securities in Lieu of
Retention and Deposit of Retention (refer to Article 9.5 of the General Conditions).
If all submitted items are in compliance with the requirements of the RFP Documents, the University
will award the Contract by returning a fully executed copy of the Agreement to Design Builder.
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 5 of 12 Request for Proposal
The University may reject the successful Proposer if the Proposer: (1) withdraws its proposal; (2)
fails or refuses to sign all of the items required by the Proposal Documents within 7 days after
receipt of Notice of Selection; or (3) is not financially or otherwise qualified to perform the
Contract. In such case, the University will select the next best value proposal until all proposals
are exhausted or reject all proposals.
1.6 General Proposal Requirements, Terms and Provisions
.1 Key RFP Definitions:
Definitions: Except as otherwise specifically provided, definitions set forth in the General
Conditions or in other Contract Documents are applicable to all Proposal Documents.
Addenda: Written, electronic or graphic supplements issued by University not later than 3
business days prior to the Proposal Deadline, which modify or interpret the Proposal
Documents by addition, deletion, clarification, or correction. No other form of
communication, oral or written, modifies the Proposal Documents.
Basis of Design: The terms “Basis of Design,” and “Design Criteria,” may be used
interchangeably.
Business Day: Any day other than a Saturday, a Sunday or University designated holiday.
Conflict of Interest: Occurs when an architect, engineer, or other consultant works on a
project on behalf of more than one client. To avoid any such conflict of interest, any
consultant hired with the primary role of developing the project program plan or project
proposal documents on behalf of the University is precluded from participating as a
member of the Design Build Team.
Facility: As used in this RFP, the University’s Facility office issuing the Proposal
Documents.
One-on-One Meeting: Confidential discussions between the University and each
Proposer to clarify RFP and program requirements, review preliminary designs and obtain
the University’s validation. Any changes to the Proposal Documents will be made only by
Addenda issued by the University (see the University Responses provision below).
Planholder: A person or entity who is known by the issuing office to have received a
complete set of Proposal Documents and who has provided contact information for receipt
of pre-proposal communications.
Proposal Deadline: The date and time on or before which proposals must be received, as
designated in the Proposal Schedule and which may be revised by Addenda.
Proposal Documents: The documents (including electronic files) prepared and issued with
the RFP including all Addenda thereto.
Proposer: A prequalified person or firm(s) that submits a proposal. Note: The terms
“Proposer,” “Design Builder,” and “Design Build Team” may be used interchangeably.
.2 Form and Content of Proposal: The format and content of the proposal submittal are
specified in the Technical Proposal and Lump Sum Base Price Proposal sections of this
Document. Proposals should be concise, straightforward, prepared simply and
economically. Expensive displays, bindings, or promotional materials are neither required
nor desired.
.3 Proposer Understanding: By submitting its proposal(s), Proposer acknowledges that it has
read, understood, and submitted its proposal(s) in accordance with the provisions of the
Proposal Documents.
.4 Additional Proposal Requirements: Proposer shall, before submitting its proposal, carefully
study and compare the components of the Proposal Documents with any other work being
bid concurrently or presently under construction which relates to the Work for which the
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 6 of 12 Request for Proposal
proposal is submitted; shall examine the project site, the conditions under which the Work
is to be performed, the local conditions; and shall at once report to University's
Representative errors, inconsistencies, or ambiguities discovered. If Proposer is awarded
the contract, Proposer waives any claim arising from any errors, inconsistencies or
ambiguities resulting from such examinations that Proposer, its subcontractors or suppliers,
or any person or entity under Proposer became aware of, or reasonably should have
become aware of, prior to Proposer’s submission of its proposal.
.5 Requests for Clarification: Requests for clarification or interpretation of the Proposal
Documents shall be addressed only to the person(s) designated by the University to
receive such information. Any other communication to any other person(s) or firm(s) shall
be deemed invalid.
.6 University Responses: Clarifications, interpretations, corrections, and changes to the RFP
Documents will be made by Addenda. CLARIFICATIONS, INTERPRETATIONS,
CORRECTIONS, AND CHANGES TO THE RFP DOCUMENTS MADE IN ANY OTHER
MANNER SHALL NOT BE BINDING AND PROPOSERS SHALL NOT RELY UPON THEM.
.7 Distribution of Addenda: Addenda will be issued only by the University and only in writing.
Addenda will be identified as such and will be distributed via e-mail, mail, fax, courier, or
through other services to all Planholders.
Copies: Copies of Addenda will be made available for inspection wherever RFP
Documents are on file for inspection. Addenda will be issued such that they should
be received by Planholders who have provided contact information for receipt of
Addenda, no later than 3 business days prior to the Proposal Deadline. Addenda
withdrawing the RFP or postponing the Proposal Deadline may be issued anytime
prior to the Proposal Deadline.
Receipt of Addenda: Each Proposer shall be responsible for ascertaining, prior to
submitting a proposal, that it has received all issued Addenda.
.8 Equal Opportunity: Every effort will be made to ensure that all persons have equal access
to contracts and other business opportunities with the University within the limits imposed
by law or University policy. Each Proposer may be required to show evidence of its equal
employment opportunity policy. The successful Proposer and its subcontractors will be
required to follow the nondiscrimination requirements set forth in the Bidding Documents
and to pay prevailing wage at the location of the work.
The work described in the contract is a public work subject to section 1771 of the California
Labor Code.
.9 Prevailing Wages: Proposer shall pay prevailing wage rates at the location of the work as
published on the DIR website and provided with this RFP as University Furnished
Information.
.10 Return of Bid Security: Bid security will be returned after the contract has been awarded.
Notwithstanding the preceding, if a Proposer fails or refuses, within 10 days after
receipt of Notice of Selection, to sign the Agreement, or submit to University all of
the items required by the RFP Documents, the University will retain the Proposer’s
bid security. If the bid security is in the form of a Bid Bond, the bid security will be
retained until the University has been appropriately compensated. If the bid security is in
the form of a certified check, the University will negotiate said check and, after deducting its
damages, return any balance to Proposer.
.11 Oral Presentations: Proposer shall make an oral presentation of its proposal that describes
the most important aspects of its approach to the project and provide proposal clarifications
requested by the University’s Technical Evaluation Committee.
.12 Incorporation of Proposal Clarifications into the Proposal: The University’s summation of
Proposal Clarifications as confirmed by Proposer, shall be accepted by signature of
selected Proposer and incorporated into their proposal by reference.
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 7 of 12 Request for Proposal
.13 Incorporation of Proposal into the Contract: The selected Proposer’s proposal shall be
incorporated into, and shall be an integral part of the Contract.
.14 Award Upon Receipt of Initial Proposal: The University intends to evaluate initial proposals
and award a contract without allowing Proposers to revise their proposals. Therefore, initial
proposals should contain the best terms from a price and technical standpoint.
.15 The University reserves the right to proceed to a “Best and Final Offer” (BAFO) phase by
requesting Proposal Revisions and conducting discussions with the Proposers if it later
determines them to be necessary. At the conclusion of discussions with all Proposers, the
University will establish a deadline for receipt of BAFO proposals. Discussions with
Proposers after receipt of a proposal do not constitute a rejection or counteroffer by the
University. As used in this provision, the following definitions apply:
"BAFO Discussions" are exchanges between the University and the Proposer that occur
after the submittal of proposals should it be necessary to call for a BAFO. During the
BAFO process, the Proposer will be allowed to submit a revised proposal.
BAFO PROPOSALS (IF REQUESTED) THAT EXCEED THE MAC WILL NOT BE
CONSIDERED FOR CONTRACT AWARD. FAILURE TO SUBMIT PROPOSAL
REVISIONS WILL RESULT IN THE PROPOSER BEING DEEMED NONRESPONSIVE.
.16 Occupational Safety and Health Qualification: Proposer and each Subcontractor at all tiers
meet the following minimum occupational safety and health qualifications:
a. Proposer and each Subcontractor have no Final Order (declared by OSHA) Willful
violations in California of Part 1 (commencing with Section 6300) of Division 5 of
the Labor Code during the five-year period prior to bid opening.
b. Proposer and each Subcontractor have maintained a workers' compensation
Experience Modification Rate (EMR) that averages below 1.15 for the past five
years.
c. Proposer and each Subcontractor have instituted an injury prevention program
pursuant to Section 3201.5 or 6401.7 of the Labor Code.
After selection of the apparent best value responsive and responsible Proposer and
issuance of the Notice of Selection, and prior to contract award, Proposer shall furnish to
the University a “Declaration of Contractor or Subcontractor Minimum Occupational Safety
and Health Qualifications” form completed by Proposer and each listed Subcontractor.
After contract award, Proposer will require each of its Subcontractors at all tiers to furnish a
fully executed Exhibit form prior to Subcontractor’s commencement of Work.
.17 Key Technical Submittal Definitions:
.1 Unallowable Changes in Technical Submittals
a. Program Change: Any project scope change that: (1) deviates from the required
elements in the Proposal Documents, or (2) is inconsistent with the requirements
expressed in the Contract Documents as issued. Examples of unallowable
changes include substantial changes in project siting or adjacencies, reduction in
usable space, limitations of planned utilization or limitations on future expansion.
b. Performance Change: Any change, revision, alteration or deviation from the
Proposal Document requirements that would increase energy usage, reduce useful
life, impair accessibility, increase maintainability, or affect life cycle as required.
.2 Cost Realism (with respect to proposal pricing)
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 8 of 12 Request for Proposal
a. Cost Realism Analysis: All pricing, including Unit Prices, Alternates and
Compensable Delay rates must reflect a clear understanding of the project
requirements with realistic prices representing probable cost. The University will
perform a cost realism analysis using its best estimate of probable cost to
determine if the proposed prices are fair and reasonable.
b. Unbalanced Pricing: Unbalanced pricing exists when, despite an acceptable total
price, the price of one or more contract line items is significantly over or
understated as indicated by the application of a cost realism analysis.
IF THE UNIVERSITY DETERMINES THAT ANY CONTRACT LINE ITEMS ARE NOT
FAIR AND REASONABLE, OR ARE UNBALANCED, THE UNIVERSITY MAY
REJECT THE OFFER IF THE RESULTING AWARD POSES AN UNACCEPTABLE
RISK TO THE UNIVERSITY.
2. THE WORK
2.1 General Requirements
The University will award a contract to the successful Proposer for the production of Design
Development Documents, Construction Documents and Construction.
The Design Builder provides services for Design Development and Construction document
preparation for the project that may include, but not be limited to, architectural, structural, civil, fire
protection, mechanical, electrical, and plumbing drawings and specifications; interdisciplinary
construction coordination drawings (also defined as “Shop Drawings”); as well as appropriate
calculations necessary to complete the project. Additionally, the Design Builder, its consultants,
sub-consultants, or suppliers performs Work required to construct the project as described and
specified in the RFP Documents.
All Construction Drawings and Shop Drawings prepared by Design Builder are to be complete
and in sufficient detail for a comprehensive review by the University including Architects &
Engineers, the State Fire Marshal, Division of State Architect (DSA) and the University’s plan
review service consultants. The drawings and engineering calculations shall include, but not be
limited to: applicable plans, elevations, sections, schedules and details. These drawings shall
comprehensively illustrate the complete and coordinated design of applicable systems. The
Design Builder will be required to use an Architect registered in the State of California to prepare
all Construction Drawings and shop drawings to the extent required by the Campus Master
Specifications.
The Lump Sum Base Price Proposal must provide for the complete design and construction of
the project, as identified in Division 01, General Requirements of the Proposal Documents,
including any temporary or interim facilities required to maintain essential existing functions in
operation throughout the construction period.
Details of the design services and construction responsibilities are described in greater detail in
the Proposal Documents.
2.2 Architectural/Engineering Consultants
All architectural and engineering services to be provided by Proposer must be in accordance with
the professional registration requirements of the State of California. Consultants listed must meet
State licensing requirements.
2.3 Work Phases
The successful Proposer will be responsible for providing services for the development of the
project including Design Development and Equipment Specification (Phase 1), Construction
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 9 of 12 Request for Proposal
Documents (Phase 2), and Construction (Phase 3), refer to Specification Section 01000 –
Summary of the General Requirements (Division 01).
The contract time is as follows:
Phase 1 & 2 Phase 3 Total Contract Time
30 Calendar Days 175 Calendar Days 205 Calendar Days
.1 Design Development and Equipment Specification, Construction Documents, and
Construction – Phases 1, 2 and 3:
The successful Proposer shall be responsible for the development of the project through
Final Design Development of the project as identified in the Contract Documents. Design
Builder shall be responsible for the development of 1) final Design Development documents
incorporating the Specifications, Addenda, Design Builder Questions and Answers, any
changes to the work proposed by the Design Builder and accepted by the University at the
time of proposal; 2) Construction Documents, and 3) Construction of the project as identified
in the Design Build Contract.
.2 The total contract time includes 3 days for rain delays, refer to Supplementary Conditions.
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 10 of 12 Request for Proposal
3. CONTRACT SUM
The Total Contract Sum shall be the Lump Sum Base Price proposed for all work associated with Design
Development, Construction Documents, Construction, and selected Alternates, if any.
.1 University has established the fixed fee for the work associated with the Design Development of the
project as Thirty-Seven Thousand ($37,000.00). This fee shall be included in the Lump Sum Base
Price proposed by the successful Proposer.
.2 Liquidated Damages
a. Liquidated damages will only apply to Phase 3. See Article 6 of the Agreement for detailed
requirements.
b. Liquidated damages daily rate for Phase 3: $1,200 per calendar day, on or before substantial
completion.
c. Liquidated damages daily rate for Phase 3: $250 per calendar day, after substantial completion.
4. MANDATORY PROPOSAL REQUIREMENTS (THE ABSENCE OF WHICH RENDERS THE
PROPOSAL NON-RESPONSIVE)
A responsive proposal is one that materially complies with the form and content requirements of the
proposal documents. Mandatory proposal requirements include, but are not limited to:
.1 Attendance at the Mandatory Pre-Proposal Conference and project site visit. University requires all
Pre-Proposal Conference attendees to sign an attendance list, used as verification of attendance.
.2 Proper proposal delivery method.
.3 Timely submittals at the designated location.
.4 At the time of proposal opening and throughout the duration of the project, Proposer and all
Subcontractors shall hold the appropriate current licenses issued by the State of California
Contractor’s State License Board. If Proposer is a Joint Venture, the Proposer shall hold the
applicable joint venture license in which each member of the joint venture shall also have the
appropriate license prior to contract award. The State of California Business and Professions
Code, Division 3, Chapter 9, known as the “Contractor’s License Law,” establishes licensing
requirements for contractors.
.5 Proposer and first-tier subcontractors must have the required bonding and insurance including the
required professional liability and contractor’s pollution liability insurance. Refer to Article 11 of the
General Conditions and the Supplementary Conditions for project specific insurance requirements.
.6 Price Proposal and Bid Bond must be submitted on the University’s forms provided in the RFP.
.7 Price Proposal Form must be signed and dated by the Proposer’s Representative legally authorized
to bind Proposer to a contract and include all applicable attachments.
.8 The sum of the Lump Sum Base Price Proposal (including all associated design fees) must be
within the Maximum Acceptance Cost for Best and Final Offer submittals (BAFO), if requested.
.9 Bid Security in the sufficient amount as described in the Lump Sum Base Price Proposal document.
5. PROPOSAL MODIFICATIONS OR WITHDRAWALS
Prior to the Proposal Deadline, a submitted proposal may be modified or withdrawn by notice to the party
receiving proposals at the location designated for receipt of proposals. Such notice shall be in writing
over the signature of Proposer, delivered by hand, facsimile or PDF email attachment. If notice is by
facsimile or email, written confirmation over the signature of Proposer shall be mailed and postmarked on
or before the Proposal Deadline. A change made shall not reveal the amount of the original proposal.
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 11 of 12 Request for Proposal
Modified or withdrawn proposals may be resubmitted up to the Proposal Deadline, provided that it then
fully complies with the Proposal Requirements.
Proposals may not be modified, withdrawn, or canceled for 60 days following the Proposal
Deadline.
6. PROPOSAL (BID) PROTEST
.1 Any Proposer, person, or entity may file a proposal (Bid) protest. The protest shall specify the
reasons and facts upon which the protest is based and shall be in writing and received by the
Facility not later than 5:00 pm on the 3rd business days after a written notice of the determination of
the apparent best value proposal has been issued by the University.
.2 If a Bid is rejected by the Facility, and such rejection is not in response to a Bid protest, any
Proposer, person or entity may dispute that rejection by filing a Bid protest (limited to the rejection)
in writing and received by the Facility not later than 5:00 pm on the 3rd business day following the
rejected Proposer’s receipt of the notice of rejection.
.3 For the purpose of computing any time period in this section, the date of receipt of any notice shall
be the date on which the intended recipient of such notice actually received it. Delivery of any
notice may be by any means, with verbal or written confirmation of receipt by the intended recipient.
.4 The facility will investigate the basis for the Bid protest and analyze the facts. Facility will notify
Proposer whose Bid is the subject of the Bid protest of evidence presented in the Bid protest and
evidence found as a result of the investigation, and, if deemed appropriate, afford Proposer an
opportunity to rebut such evidence, and permit Proposer to present evidence that it should be
allowed to perform the Work. If deemed appropriate by Facility, an informal hearing will be held.
Facility will issue a written decision within 15 days following receipt of the Bid protest, unless factors
beyond Facility's reasonable control prevent such a resolution, in which event such decision will be
issued as expeditiously as circumstances reasonably permit. The decision will state the reasons for
the action taken by Facility. A written copy of the decision will be furnished to the protestor, the
Proposer whose Bid is the subject of the Bid protest, and all Proposers affected by the decision. As
used in this Section, a Proposer is affected by the decision on a Bid protest if a decision on the
protest could have resulted in the Proposer not being the best value, responsible and responsive
Proposer for the Contract. A written copy of the Facility’s decision must be received by the
protester, the Proposer whose is the subject of the Bid protest, and all Proposers affected by the
decision no later than 3 business days prior to award of the contract.
.5 Notwithstanding the provisions of this Section, at the election of Facility, a Bid protest may be
referred directly to University's Construction Review Board without prior investigation and review by
Facility. The Chair of the Construction Review Board will either decide the Bid protest or appoint a
Hearing Officer. If a Hearing Officer is appointed, the Hearing Officer will review the Bid protest in
accordance with the provisions of this Section.
.6 The Proposer whose Bid is the subject of the protest, all Proposers affected by the Facility’s
decision on the protest, and the protestor have the right to appeal to the Construction Review Board
if not satisfied with Facility’s decision. The appeal must be in writing and shall specify the decision
being appealed and all the facts and circumstances relied upon in support of the appeal. The
appeal must be received by the Chair, Construction Review Board, not later than 5:00 pm on the
3rd day following appellant’s receipt of the written decision of Facility, at the following address:
Chair, Construction Review Board
Attention: Director, Construction Services
University of California Office of the President
1111 Franklin Street, 6th Floor
Oakland, CA 94607-5200
And
Campus Solar Roof Initiative
Project Number: 950581
Contract Number: 950581-DB-2020-68
October 2, 2017 12 of 12 Request for Proposal
constructionreviewboard@ucop.edu
.7 A copy of the appeal shall be sent to all parties involved in the Bid protest and to Facility. An appeal
received after close of business is considered received as of the next business day. If the final date
for receipt of an appeal falls on a Saturday, Sunday, or University holiday, the appeal will be
considered timely only if received by close of business on the following business day.
.8 The Chair of the Construction Review Board will review the Facility’s decision and the appeal, and
issue a written decision, or if appropriate, appoint a Hearing Officer to conduct a hearing and issue
a written decision. If a hearing is held, the hearing shall be held not later than the 10th day following
the appointment of the Hearing Officer unless the Hearing Officer for good cause determines
otherwise. The written decision of the Chair or Hearing Officer will state the basis of the decision,
and the decision will be final and not subject to any further appeal to University. The Chair or
Hearing Officer may consult with the University's Office of the General Counsel on the decision as
to legal form. The University will complete its internal Bid protest procedures before award of the
Contract.
7. CONFLICTS
.1 The intent of this RFP is to provide an overview of the proposal process, the subsequent award,
and the work required of the successful Proposer. The provisions herein are a SUMMARY
[... truncated ...]