← Opportunities

South Aztec Water Tank Replacement - Design

Funder
City of Aztec · RFP 2025-857 🟡 Some evidence
Type / status
rfp · closed
Amount
—
Deadline
2024-09-24 (past)
“Proposals Due: September 24, 2024 at 3:00 PM, MST”
Ecosystems
Categories
infraother
Tech stack
Apply
https://www.aztecnm.gov/
Source
https://vrapp.vendorregistry.com/Bids/View/DownloadBidFile?bidId=b33eb8c9-e81a-4cdf-ae7c-1734d7dd78d4&fileName=RFP_2025_857_South_Aztec_Water_Tank_Replacement_Design.pdf
Fit
8% · poor fit · The team's expertise in zk, privacy, and blockchain infrastructure is entirely unrelated to municipal water tank design and engineering.
Trust
89% · model self-report 95% · first seen 2026-10-23 · v1
Verified
2026-10-23 · by extraction

The City of Aztec, NM is seeking qualified engineering firms to design a 750,000-gallon water tank, associated waterlines, and appurtenances. This is a qualifications-based selection process where proposals will be evaluated on qualifications, price, and service capabilities. Interested firms must submit sealed proposals by the deadline. The contract will be awarded to the most advantageous offeror as determined by the evaluation committee and approved by the City Commission.

Eligibility: Qualified engineering firms with experience in water tank design and associated infrastructure. Must submit Acknowledgement of Receipt form by September 17, 2024 to be on distribution list.

Pipeline

Override status:

Funder track record · does City of Aztec actually pay grants?

🟡 Some payout evidence · 4 grantees found · last payout 2026-04-30 · checked 2026-10-01 · 0 forum reports, 10 web pages read, 5 unverifiable claims dropped

Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.

GranteeAmountDateEvidence
Audubon Neighborhood Association$20,5002026-04-30“* Audubon Neighborhood Association — Ward 1 — $20,500” source
Northeast Minneapolis Arts Association (NEMAA)$25,0002026-04-30“* Northeast Minneapolis Arts Association (NEMAA) — Wards 1 and 3 — $25,000” source
Rethos$39,0002026-04-30“* Rethos — Wards 1, 4, 5, 6, 8, and 9 — $39,000” source
East Bank Neighborhood Partnership$29,0002026-04-30“* East Bank Neighborhood Partnership — Wards 2 and 3 — $29,000” source

Trust breakdown (3/3 checkable facts verified)

SignalWeightResultNote
deadline0.35100%quoted in source
apply link0.075100%link in source
funder0.075100%named in source
source quality0.1550%social or search hit
model confidence0.195%model self-report

Fit breakdown (against the ORG_* profile)

SignalWeightResultNote
model fit0.510%model rated 10%
ecosystem overlap0.250%none vs aleo
category overlap0.1517%infra, other vs zk, privacy, infra, dev_tooling, security, interoperability
tech overlap0.10%none vs rust, leo, zk

Sources (1)

RoleDocumentFromFetched
primaryDownloadBidFileWeb discovery: ecosystem sweep2026-10-23

History (1)

vChangedFields
12026-10-23created

Extracted text

1
Request for Qualifications-Based Proposals
RFP 2025-857 South Aztec Water Tank Replacement - Design
PROPOSAL OPENING DATE/TIME/PLACE:
Tuesday, September 24, 2024, 3:00 P.M.
City of Aztec Finance Conference Room
201 W Chaco
Aztec, NM 87410
FINAL DATE FOR QUESTIONS
Tuesday, September 17, 2024, 3:00 PM, MST
Tentative Commission Approval Date
October 08, 2024
For further information contact:
Vanessa Tanner,
Procurement Manager
201 W. Chaco, Aztec NM 87410
Phone: 505-334-7652
Fax: 505-334-7649
email: vtanner@aztecnm.gov

2
TABLE OF CONTENTS
REQUEST FOR PROPOSALS .............................................................................................. 3
Invitation. ..................................................................................................................... 3
Background. ................................................................................................................ 3
Information Provided by City. ...................................................................................... 4
Procurement Manager. ................................................................................................ 4
Definition of Terminology. ......................................................................................... 5-7
PROPOSAL PROCESS......................................................................................................... 8
Overview. .................................................................................................................... 8
Preliminary Schedule................................................................................................... 8
Explanation of Events. ............................................................................................ 8-10
General Requirements. ........................................................................................ 10-13
Sample Contract (Professional Service Agreement) ............................................ 13-24
PROPOSAL FORMAT REQUIREMENTS ........................................................................... 25
General Format for Proposals. .................................................................................. 25
Number of Copies...................................................................................................... 25
Proposal Content & Organization of Materials. .......................................................... 26
PROPOSAL SPECIFICATIONS .......................................................................................... 27
Objectives. ................................................................................................................. 27
Scope of Services................................................................................................. 27-28
Project Team & Organizational Structure .................................................................. 29
Organizational Experience. ....................................................................................... 29
Organizational References. ....................................................................................... 29
Offeror Qualifications. ................................................................................................ 29
REVIEW AND EVALUATION .............................................................................................. 30
Proposal Evaluation................................................................................................... 30
Evaluation Criteria. ............................................................................................... 30-32
Evaluation Process. ................................................................................................... 33
PROPOSAL FORMS ........................................................................................................... 34
Acknowledgment of Receipt Form ............................................................................. 35
Submittal Form ..................................................................................................... 36-37
Campaign Contrubution Disclosure Form............................................................. 38-39
Debarment/Suspension Certification Form ................................................................ 40
NM Preference for Resident ...................................................................................... 41
Drug-Free Workplace Certification. ........................................................................... 42
Organization Reference Questionnaire ................................................................ 43-45
Cost Proposal Form.............................................................................................. 46-47

3
REQUEST FOR PROPOSALS
INVITATION
City of Aztec, NM
RFP 2025-857, South Aztec Water Tank Replacement - Design
Proposals Due: September 24, 2024 at 3:00 PM, MST
The City of Aztec is accepting proposals from interested and qualified Engineering Services to
design a 750,000-gallon water tank, associated waterlines and appurtenances.
Sealed proposals will be received by the City of Aztec, 201 W Chaco, Aztec, NM 87410, until
3:00 PM, MST, Tuesday, September 24, 2024. Proposals received after that time will be
considered non-responsive and returned unopened. A qualification-based selection process will
be utilized to select the most qualified firm.
RFP documents may be obtained online at www.aztecnm.gov, VendorRegistry.com, or by
contacting Vanessa Tanner at (505) 334-7652 or vtanner@aztecnm.gov.
Publication Dates: August 25, 2024, Durango Herald
August 26, 2024, Tri-City Record
This Request for Proposals (“RFP”) is not a competitive bid based on price only. The RFP
allows the City to select Engineering Services which best meets the needs of the City, taking
into consideration qualifications, price, and service capabilities and other factors relevant to
the City’s policies, programs, administrative resources and budget. The purpose of the RFP
is to solicit sealed proposals to establish a contract for the City of Aztec.
BACKGROUND
Aztec, New Mexico, is a small city located in the northwest part of the state, in San Juan
County. The city is known for its rich history and proximity to the Aztec Ruins National
Monument.
Water is a crucial component of the city’s public utilities, and Aztec has invested in maintaining
and upgrading its water system to ensure the reliable delivery of clean water to its residents.
The Aztec Water Treatment Plant is responsible for treating and supplying potable water to the
city’s residents. The plant processes water sourced primarily from the Animas River, which runs
through the region. The plant ensures the water meets state and federal quality standards
before it is distributed through the city’s water system.
The plant has a capacity to treat several million gallons of water per day, serving the needs of
the city’s population providing water for residential, commercial, and municipal use. The water
infrastructure in Aztec includes the treatment plant itself, storage facilities such as water tanks,
and a network of pipes and pumps that distribute water throughout the city.
Aztec’s water plant uses a Supervisory Control and Data Acquisition (SCADA) system to
monitor and control various processes within the plant and the distribution system. This
technology allows the city to manage water treatment and distribution more effectively, respond
to issues in real-time, and ensure the continued provision of high-quality water.

4
INFORMATION PROVIDED BY CITY
Offerers are solely responsible for conducting their own independent research, due diligence or
other work necessary for the preparation of proposals, negotiation of agreements, and the
subsequent delivery of services pursuant to any agreement. In no event may Offerers rely on
any oral statement.
Should an Offerer find discrepancies in, or omissions from, this RFP and related documents, or
should Offerer be in doubt as to meaning, Offerer shall immediately notify the Procurement
Manager and, if necessary, a written addenda will be emailed to each Offerer who has returned
the "Acknowledgement of Receipt" form, included with Proposal Forms.
Each Offerer requesting an interpretation will be responsible for the delivery of such requests to
the City's designated representative in writing as outlined in this RFP. The City will not be bound
by, nor responsible for, any explanation or interpretation of the proposed documents other than
those given in writing.
PROCUREMENT MANAGER
The City of Aztec has assigned a Procurement Manager who is responsible for the conduct of
this procurement whose name, address, telephone number and e-mail address are listed below:
Name: Vanessa Tanner, Procurement Manager
Telephone: (505) 334-7652
Fax: (505) 334-7649
Email: vtanner@aztecnm.gov
All deliveries of responses via express carrier must be addressed as follows:
Name: Vanessa Tanner
Reference Name: 2025-857 South Aztec Water Tank Replacement - Design
Address: City of Aztec
Purchasing Office
201 W Chaco
Aztec, New Mexico 87410
Please note, Aztec, New Mexico is not a guaranteed delivery area by express carriers.
Responses must be received by the due date and time to be considered, not the date when
delivered to carrier. The City is Closed on Fridays (Operating Hours are Monday through
Thursday 7:00am – 6:00pm); documented attempted deliveries by the carrier may be
considered as timely responses IF provided by the date and time proposals are due.
Any inquiries or requests regarding this procurement should be submitted, in writing, to the
Procurement Manager. Offerors may contact ONLY the Procurement Manager regarding this
procurement. Other city employees or Selection Committee members do not have the authority
to respond on behalf of the Purchasing Office. Protests of the solicitation or award must be
delivered by mail to the Protest Manager. As A Protest Manager has been named in this
Request for Proposals, pursuant to NMSA 1978, § 13-1-172, ONLY protests delivered directly to
the Protest Manager in writing and in a timely fashion will be considered to have been submitted
properly and in accordance with statute, rule and this Request for Proposals. Emailed protests
will not be considered as properly submitted nor will protests delivered to the Procurement
Manager be considered properly submitted.

5
DEFINITION OF TERMINOLOGY
This section contains definitions of terms used throughout this procurement document, including
appropriate abbreviations:
“Agency” means the City of Aztec
“Amendment” means a written or graphic instrument issued prior to the opening of Proposal,
which clarifies, corrects, or changes the Request for Proposal.
“Award of Contract” shall mean a formal written notice by the City that a firm has been
selected to enter into a contract for services. Any Award of Contract that has not resulted in a
written contract offer to the Offeror, within 6 months or written notice, shall not be considered an
award for the purposes of the Project Listing Form.
“Business Hours” means 8:00 am thru 5:00 PM Mountain Standard or Mountain Daylight Time,
whichever is in effect on the date given.
“City” means the City of Aztec
“Close of Business” means 5:00 PM Mountain Standard or Mountain Daylight Time, whichever
is in effect on the date given.
“Confidential” means confidential financial information concerning respondent’s organization
and data that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act
NMSA 1978 57-3-A-1 to 57-3A-7. See NMAC 1.4.1.45. As one example, no information that
could be obtained from a source outside this request for proposals can be considered
confidential information
“Contract" means any agreement for the procurement of items of tangible personal property,
services or construction.
“Contractor" means the offeror selected by the City pursuant to this Request for Proposals..
“Desirable" the terms "may", "can", "should", "preferably", or "prefers" identify a desirable or
discretionary item or factor.
“Determination" means the written documentation of a decision of a procurement manager and
the Selection Committee including findings of fact supporting a decision. A determination
becomes part of the procurement file to which it pertains.
“Electronic Version/Copy” means a digital form consisting of text, images or both readable on
computers or other electronic devices that includes all content that the Original and Hard Copy
proposals contain. The digital form may be submitted using a compact disc (cd) or USB flash
drive. The electronic version/copy CANNOT be emailed.
“Evaluation Committee” means a body appointed to perform the evaluation of Offerors’
proposals.
“Evaluation Committee Report” means a report prepared by The Procurement Manager and
Evaluation Committee for contract award. It will contain written determinations resulting from
the procurement.
“Finalist” means an Offeror who meets all the mandatory specifications of this Request for

6
Proposals and whose score on evaluation factors is sufficiently high to merit further
consideration by the Evaluation Committee.
“Hourly Rate” means the proposed fully loaded maximum hourly rates that include travel, per
diem, fringe benefits and any overhead costs for contractor personnel, as well as subcontractor
personnel if appropriate.
“Mandatory" – the terms "must", "shall", "will", "is required", or "are required", identify a
mandatory item or factor (as opposed to “desirable”). Failure to meet a mandatory item or factor
will result in the rejection of the Offeror’s proposal.
“Minor Technical Irregularities” means anything in the proposal that does not affect the price
quality and quantity or any other mandatory requirement.
“Offeror" is any person, corporation, or partnership who chooses to submit a proposal.
“Owner” is the City of Aztec (COA).
“Price Agreement" means a definite quantity contract or indefinite quantity contract which
requires the contractor to furnish items of tangible personal property, services or construction to
a state agency or a local public body which issues a purchase order, if the purchase order is
within the quantity limitations of the contract, if any.
“Procurement Manager” means any person or designee authorized by a state agency or local
public body to enter into or administer contracts and make written determinations with respect
thereto.
“Procuring Agency" means all State of New Mexico agencies, commissions, institutions,
political subdivisions and local public bodies allowed by law to entertain procurements.
“Proposal” is the offeror’s response to this RFP
“Redacted” means a version/copy of the proposal with the information considered confidential
as defined by NMAC 1.4.1.45 and defined herein and outlined in Section II.C.8 of this RFP
blacked out BUT NOT omitted or removed.
“Request for Proposals (RFP)" means all documents, including those attached or incorporated
by reference, used for soliciting proposals.
“Responsible Offeror" means an Offeror who submits a responsive proposal and who has
furnished, when required, information and data to prove that his financial resources, production
or service facilities, personnel, service reputation and experience are adequate to make
satisfactory delivery of the services, or items of tangible personal property described in the
proposal.
“Responsive Offer" or “Responsive Proposal” means an offer or proposal, which conforms in
all material aspects to the requirements set forth in the Request for Proposals (RFP). Material
aspects of responses to the Request for Proposals(RFP) include, but are not limited to price,
quality, quantity or delivery requirements.
“Sealed” means, in terms of a non-electronic submission, that the proposal is enclosed in a
package which is completely fastened in such a way that nothing can be added or removed.
Open packages submitted will not be accepted except for packages that may have been
damaged by the delivery service itself. The City reserves the right, however, to accept or reject

7
packages where there may have been damage done by the delivery service itself. Whether a
package has been damaged by the delivery service or left unfastened and should or should not
be accepted is a determination to be made by the Procurement Manager. By submitting a
proposal, the Offeror agrees to and concurs with this process and accepts the determination of
the Procurement Manager in such cases.
“Selection Committee” means a body appointed by the Procurement Manager to perform the
evaluation of Offeror proposals.
“Selection Committee Report” means a report prepared by the Procurement Manager and the
Selection Committee for submission to the Commission for contract award that contains all
written determinations resulting from the conduct of a procurement requiring the of competitive
sealed proposals.
“Staff" means any individual who is a full-time, part-time, or an independently contracted
employee with the Offerors’ company.
“State (the State)” means the State of New Mexico.
“Statement of Concurrence” means an affirmative statement from the Offeror to the required
specification agreeing to comply and concur with the stated requirement(s). This statement shall
be included in Offerors proposal. (E.g. “We concur”, “Understands and Complies”, “Comply”,
“Will Comply if Applicable” etc.)
“Unredacted” means a version/copy of the proposal containing all complete information
including any that the Offeror would otherwise consider confidential, such copy for use only for
the purposes of evaluation.
“Written” means typewritten on standard 8 ½ x 11-inch paper. Larger paper is permissible for
charts, spreadsheets, etc.

8
PROPOSAL PROCESS
OVERVIEW
This section of the RFP contains the schedule, description and conditions governing the
procurement.
Until the final award by the City of Aztec Commission, the City reserves the right to reject any
and/or all submittals, to waive technicalities, to re-advertise, or to otherwise proceed when the
best interest of the City will be realized. This procurement is governed by the New Mexico State
Statutes 1978, Chapter 13, Public Purchases and Property.
PRILIMINARY SCHEDULE
It is the City's intent to adhere to the following schedule. However, the City reserves the right to
modify this schedule.
Issue RFP 08/25/2024
Pre-Proposal Conference 09/03/2024, 2:00 PM
Deadline to Submit Questions and
Acknowledgement Form
09/17/2024, 3:00 PM
Response to Written Questions/Amendment 09/19/2024
SUBMISSION OF PROPOSAL 09/24/2024, 3:00 PM
Recommendations to City Commission (Tentatively) 10/08/2024
Contract Award 10/10/2024
Protest Deadline 10/31/24
EXPLANATION OF EVENTS
The following paragraphs describe the activities listed in the sequence of events shown above.
1. Issuance of RFP
This RFP is being issued on behalf of the City of Aztec for Engineering Design of the Water
Tank Replacement.
2. Pre-Proposal Conference.
A Pre-Proposal Conference will be held at Aztec City Hall at 201 W. Chaco Aztec, NM 87410
3. Acknowledgement of Receipt
Potential Offerors should email, hand deliver, or return by facsimile, the " Request for Proposals
- Acknowledgement of Receipt of Form" that accompanies this document, in section listed
PROPOSAL FORMS, to have their organization placed on the procurement distribution list. The
form should be signed by an authorized representative of the organization, dated and returned
to the Procurement Manager by Acknowledgement Form due date.
The procurement distribution list will be used for the distribution of written responses to
questions and any RFP amendments. Failure to return the Acknowledgement of Receipt form
shall constitute a presumption of receipt and rejection of the RFP, and the potential Offeror’s
organization name shall not appear on the distribution list.

9
4. Deadline to Submit Written Questions
Questions and/or clarifications concerning this RFP will be accepted in writing. Requests may
be transmitted via email (vtanner@aztecnm.gov). Written responses to all written inquiries will
be provided and distributed to all recipients of this RFP. Responses and addenda to this RFP, if
necessary, will be issued by due date listed above. No Offeror may rely upon oral responses
made by any City employee or any representative of the City.
5. Response to Written Questions
Written responses to written questions will be distributed as indicated in the sequence of events
to all potential Offerors whose organization name appears on the procurement distribution list.
An e-mail copy will be sent to all Offeror’s that provide Acknowledgement of Receipt Forms
before the deadline. Additional copies will be posted on City website.
6. Submission of Proposal
ALL OFFEROR PROPOSALS MUST BE RECEIVED FOR REVIEW AND EVALUATION BY
THE PROCUREMENT MANAGER OR DESIGNEE NO LATER THAN THE SUBMISSION OF
PROPOSAL DUE DATE. Proposals received after this deadline will not be accepted. The date
and time of receipt will be recorded on each proposal.
Proposals must be addressed and delivered to the Procurement Manager at the address listed
in the PROCUREMENT MANAGER section or submitted to Vendor Registry. Proposals must
be sealed and labeled on the outside of the package to clearly indicate which RFP they are
responding to, proposals submitted by facsimile, or email will not be accepted.
A public log will be kept of the names of all Offeror organizations that submitted proposals.
Pursuant to NMSA 1978, § 13-1-116, the contents of proposals shall not be disclosed to
competing potential Offerors during the negotiation process.
Proposals will be reviewed for completeness and compliance with requirements by the
Procurement Manager. If any proposal submitted is deemed non-responsive by the
Procurement Manager, the Offeror will be notified in writing of such determination and the
method of protesting that determination.
7. Proposal Evaluation
The Evaluation Committee will review each Offerors proposal. Points will be allocated by each
member, as outlined in the Evaluation Criteria. Each member’s point totals will be translated
into a numeric ranking of all proposals. The evaluation committee may hold interviews with the
three highest-ranked proposals if deemed necessary. The Evaluation Committee may award
the selection based on the results of the interviews. If fewer than three proposals are received
the Evaluation Committee may recommend an award to the City Commission for approval or
direct that the RFP be reissued.
8. Selection of Finalists
The Evaluation Committee will select the finalists, and the Procurement Manager will notify the
finalists. Finalist offerors shall submit Cost Response Form.
9. Recommendation to City Commission
A member of the evaluation committee will present the finalist to the City Commission for final

10
approval. Any Contractual agreement(s) resulting from this RFP will be finalized with the most
advantageous Offeror(s) as per schedule or soon thereafter. This date is subject to change at
the discretion of the City of Aztec Procurement office.
10. Contract Awards
After review of the Evaluation Committee Report and the signed contractual agreement, the City
of Aztec Procurement Manager will award as per the schedule or soon thereafter. This date is
subject to change at the discretion of the City of Aztec Procurement Manager.
The contract shall be awarded to the Offeror (or Offerors) whose proposals are most
advantageous to the City of Aztec, taking into consideration the evaluation factors set forth in
this RFP. The most advantageous proposal may or may not have received the most points.
The award is subject to appropriate Department and Commission approval.
In the event mutually agreeable terms cannot be reached with the apparent most advantageous
Offeror in the time specified, the City of Aztec reserves the right to finalize a contractual
agreement with the next most advantageous Offeror(s) without undertaking a new procurement
process.
11. Protest Deadline
In accordance with NMSA 1978, § 13-1-172, any Offeror who is aggrieved in connection with
the award of a contract may protest to the City of Aztec Finance Department. The protest must
be submitted in writing within fifteen (15) calendar days after knowledge of the facts or
occurrences giving rise to the protest to:
Vanessa Tanner
Procurement Specialist
City of Aztec
201 W Chaco
Aztec, NM 87410
The 15-day protest period shall begin on the day following the date of written notice of action
from the Finance Department. Protests must include the name and address of the protestant,
the solicitation number, and a statement of ground for protest, including appropriate supporting
exhibits. Protests received after the deadline will not be accepted.
GENERAL REQUIREMENTS
1. Prohibited Contacts
The offeror, including any person affiliated with or in any way related to the offeror, is strictly
prohibited from any contact with members of the City Commission, evaluation committee
member, or City staff on any matter having to do in any respect with this RFP other than as
outlined herein. Questions and requests for information regarding this RFP, site visits or other
requirements shall be presented to the City as prescribed in this RFP.
Failure by any Offeror to adhere to this prohibition may, at the sole discretion of the City, result
in disqualification and rejection of any proposal. offerors shall have no claim against the City for
failure to obtain information made available by the City which the offeror could have remedied
through the exercise of due diligence.

11
2. Conflicts of Interest
Prospective Consultants warrant and covenant that no official or employee of the City, or any
business entity in which an official of the City has an interest, has been employed or retained to
solicit or aid in procuring the resulting agreement, nor that any such person will be employed in
the performance of such agreement without immediate divulgence of such fact to the City.
offeror must notify the City's Chief Procurement Officer if any employee(s) of the City have a
financial interest in the offeror. If yes, the offeror must specify the employee(s) name in their
proposal.
Prospective Consultant's Qualification Package shall contain a statement to the effect that the
Consultant is not currently committed to another project that would constitute a conflicting
interest with any project defined in this RFP.
3. Signing of Proposals and Authorization to Negotiate
The original proposal shall be executed by a duly authorized officer of the offeror. The offeror
must also identify those persons authorized to negotiate on its behalf with the City in connection
with this RFP.
4. Cost Proposals
Cost Proposals shall not be included in the Offeror’s proposal, but shall be made available by
the top evaluated firm(s) within 48 business hours after the City's request.
5. Period of Acceptance
All proposals must remain valid for a minimum period of one hundred-twenty (120) days after
the Proposal Due Date. No proposal may be modified or withdrawn by the offeror during this
period of time unless prior written permission is granted by the City.
The City reserves the right to request additional information from the offeror at any time during
the selection process. The City also reserves the right to extend by sixty (60) days the proposal
of any offeror, at no additional cost to the City, to allow for the completion of the final contract
documents. If the notification of selection of a offeror or request for time extension has not been
made by the City after one hundred-twenty (120) days, offerors may, at their discretion,
withdraw their proposals or provide the City with written extensions of time.
6. Binding Offers
All proposals submitted by offeror are required to be binding offers, enabling acceptance by the
City to form a binding contract. Proposals are to remain as binding offers for the full period of
time of the initial 120-day Period of Acceptance and as such time period may be extended by
the City. The City reserves the right to request revisions to proposals in the form of binding best
and final offers.
7. Subcontracts and Other Contractual Arrangements
The use of subcontracts or other contractual arrangements to provide the requested services is
permitted. The City, however, is looking for a contracting entity that provides for a single,
technically and financially capable party to be fully responsible to the City for all contractual
obligations.
All existing or anticipated subcontracting and other arrangements relating to the entity that will
contract with the City and to the services to be provided by such entity must be fully and clearly
disclosed in proposals and are subject to further clarification by the offeror, and the review and
approval by the City.

12
8. Independence of Offeror
The employees, officers and agents of the offeror are not, nor shall they be deemed for any
purpose, employees or agents of the City, nor shall they be entitled to any rights, benefits, or
privileges of City employees. It is understood that the relationship of the offeror to City, if a
contract is successfully negotiated, will be that of an independent contractor.
9. Business License
Offeror’s are advised that they should have or obtain a current City of Aztec business license for
the goods or services required under this contract before task order is fully executed, work
commences or a Purchase Order is issued.
10. Laws And Regulations
This procurement shall be governed by and construed and enforced in accordance with the laws
of the State of New Mexico, and the laws, ordinances, rules and regulations of the City of Aztec.
The City also requires that all responses to this RFP, and any contracts that may arise as a
result of this procurement, be in accordance with laws, ordinances, and regulations of the State
of New Mexico and the City of Aztec, New Mexico.
11. Confidentiality
It is understood by the Seller or offeror and the City that the City is a New Mexico municipal
corporation and, as such, is subject to the provisions of the New Mexico Inspection of Public
Records Act, Section through 14-2-12 NMSA 1978 and the Public Records Act, Chapter 14
Article 3 NMSA 1978. In the event Seller or offeror has responded to a City Invitation To Bid
(ITB) or a City Request For Proposal (RFP) and marked all or any part of the information
submitted as "CONFIDENTIAL INFORMATION" or as "PROPRIETARY INFORMATION," City
agrees to notify Seller of any third party request for any rates, terms, compensation amounts, or
other information documented in the Purchase Order, Agreement, or Contract. To the extent
Seller or offeror provides City with written direction to withhold such requested Confidential
Information or Proprietary Information and litigation results, Seller or Offeror agrees that the
action would be brought in a New Mexico court of competent jurisdiction under New Mexico law.
Seller or Offeror, being aware of said facts, agrees to provide legal counsel on behalf of the City
in any such litigation and shall bear the complete cost of litigation, including attorney fees and
court costs. If Seller or Offeror fails or refuses to provide legal counsel at its expense within ten
(10) calendar days after written notification, as aforesaid, such failure may result in the City
agreeing to release the Purchase Order, Agreement, or Contract or any portion thereof which is
relevant to the denied request.
Confidential data are normally restricted to confidential financial information concerning the
Offeror’s organization and data that qualifies as a trade secret in accordance with the Uniform
Trade Secrets Act, §57-3A-1 to §57-3A-7 NMSA, 1978.
12. Bribery and Kickbacks.
By law (Section 13-1-191, NMSA, 1978) the City is required to inform Officers of the following:
1. it is a third-degree felony under New Mexico law to commit the offense of bribery of a
public officer or public employee (Section 30-24-1, NMSA, 1978);
2. It Is a third-degree felony to commit the offense of demanding or receiving a bribe by a
public officer or public employee (Section 30-24-2, NMSA, 1978);
3. it is a fourth-degree felony to commit the offense of soliciting or receiving illegal
kickbacks (Section 30-41-1, NMSA, 1978);
4. it is a fourth-degree felony to commit the offense of offering or paying illegal kickbacks
(Section 30-41-2, NMSA, 1978).

13
13. Debarment, Suspension, and Ineligibility.
By submitting a response to this solicitation (RFQ, ITB, RFP) the business
(Bidder/Offeror/Contractor) represents and warrants that it is not debarred, suspended, or
placed in ineligibility status under the provisions of Federal Executive Order 12549.
SAMPLE CONTRACT
Professional Services Agreement
This agreement is made and entered into on __/__/2024 (Upon execution, the Effective Date will be the last
signature date) by and between _________, hereinafter referred to as the “Contractor”, and the City of Aztec,
New Mexico, hereinafter referred to as the “City”.
WHEREAS, the City has deemed it necessary to retain the services of the Contractor to perform services on behalf
of the City; and
WHEREAS, the City desires to engage the Contractor to provide said services; and conditions of this agreement.
THEREFORE, it is mutually agreed by and between the parties that:
1. Scope of Services:
Provided in Request For Proposal 2025-xxx
(See Exhibit A)
2. Compensation:
A. In consideration for the services provided pursuant to Paragraph 1, the Contractor shall charge the City
on a Net 30 Day basis and City shall pay only the following charges for services performed as stated in the
RFP – Cost Proposal Form
B. Payment is subject to availability of funds pursuant to the Appropriations Paragraph set forth
below and to any negotiations between the parties from year to year pursuant to Paragraph 1, Scope of
Services, and to approval by the City. All invoices MUST BE received by the City no later than fifteen (15)
days after the termination of the Fiscal Year (June 30) in which the services were delivered. Invoices
received after such date WILL NOT BE PAID.
C. Contractor must submit a detailed statement accounting for all services performed and expenses
incurred. If the City finds that the services are not acceptable, within thirty days after the date of receipt of
written notice from the Contractor that payment is requested, it shall provide the Contractor a letter of
exception explaining the defect or objection to the services, and outlining steps the Contractor may take to
provide remedial action. Upon certification by the City that the services have been received and accepted,
payment shall be tendered to the Contractor within thirty days after the date of acceptance. If payment is
made by mail, the payment shall be deemed tendered on the date it is postmarked. However, the City shall
not incur late charges, interest, or penalties for failure to make payment within the time specified herein.
3. Changes to Services:
City may, at any time, revise the Services by providing written notice to Contractor of the required changes.
Contractor may propose changes to the Services to City, but such proposed changes will only become effective
upon obtaining the written approval of a City contracting agent or City officer/official. The rate of
compensation set forth in Section 2 “Compensation” may only be changed by a written agreement of the
Parties signed and dated by a City contracting agent or City officer/official and Contractor.
4. Term:
This agreement shall be effective from the Effective Date until completion of services unless terminated earlier
as provided herein. This agreement shall not be renewed automatically.

14
5. Termination:
5.1 Termination for Cause: If, through any cause, the CONTRACTOR fails to fulfill in a timely and proper
manner the Contractor’s obligations under this Agreement, or if the CONTRACTOR violates any of the
covenants, agreements, or stipulations of this Agreement, the CITY may order CONTRACTOR by written notice
to stop the services or any portion of them until the cause for such order has been eliminated. If the
CONTRACTOR fails to correct the cause within five (5) working days of date of written notice, CITY shall have
the right to immediately terminate this Agreement. The CONTRACTOR shall be entitled to receive just and
equitable compensation for any work satisfactorily completed.
5.2 Termination for Convenience: The City Manager may, upon advance written notice to Contractor,
suspend, abandon or terminate the Services, or any portion of the Services thereof, and terminate this
Agreement, for any reason whatsoever including for the convenience of City without regard to whether or
not Contractor has defaulted or failed to comply with the provisions of this Agreement. If the City Manager
terminates the Services, or any portion of the Services thereof for convenience, City shall pay Contractor for
all parts of the Services performed prior to the effective date of termination, including materials provided, in
conformity with this Agreement, plus an amount for the Contractor’s substantiated, reasonable direct costs
necessarily incurred in preparation for the parts of the Services not yet performed and in shutting down its
operations; plus an amount for a reasonable part of the profit Contractor would otherwise have earned for
the percentage of Services performed prior to such termination, provided that the total sum payable to
Contractor upon termination shall not exceed the unpaid balance of Contractor’s compensation under Section
2 “Compensation”. Contractor shall not be entitled to any other costs or damages whatsoever arising out of
Contractor’s performance of the Services and the termination by City for convenience.
5.3 Stopping Services. When City terminates the Services in accordance with “Termination by City for Cause”
or “Termination by City for Convenience,” Contractor shall take the actions set forth herein. Unless City
directs otherwise, after receipt of a written notice of termination for either cause or convenience, Contractor
shall promptly (a) stop performing Services on the date and as specified in the notice of termination; (b) place
no further orders or subcontracts for materials, equipment, services or facilities, except as may be necessary
for completion of such portion of the Services that is not terminated; (c) cancel orders and subcontracts, upon
terms acceptable to City, to the extent that they relate to the performance of Services terminated; (d)
assign to City all of the right, title, and interest of Contractor in all orders and subcontracts related to Services
which shall continue; (e) deliver completed work to City and take such action as may be necessary or as
directed by City to preserve and protect the work, work site, and any other property related to the Services in
the possession of Contractor in which City has an interest; and (f) continue performance only to the extent
not terminated.
5.4 Suspension of the Services. City may, for any reason, at any time and from time-to-time, by written notice
to Contractor, suspend the carrying out of the Services or any part thereof, whereupon Contractor shall
suspend the carrying out of the Services or any part thereof for such time or times and in such manner as City
may require. During any such suspension, Contractor shall properly protect and secure the results of the
Services in such manner as City may reasonably require. Unless otherwise instructed by City, Contractor shall,
during any such suspension, maintain its staff and labor on or near the work site and otherwise be ready to
proceed with the Services upon receipt of City’s further instructions. City and Contractor shall negotiate a
change order to address the impact of such suspension on Contractor’s compensation and the term of this
Agreement in accordance with Section 3 

[... truncated ...]