Request for Proposals: Technology Consultant for the Production Tracking System (PTS)
MassCEC seeks proposals from qualified individuals or firms for a three-phase engagement to evaluate, modernize, host, and support the Production Tracking System (PTS). The project involves assessing the current .NET application with SQL backend hosted in Azure, implementing a modernization strategy, and providing ongoing operations and support. Deliverables include a modernization strategy, migration plan, technical documentation, automated deployment capabilities, and long-term operational support with maintenance, bug-fixing, and enhancements. Proposals must be submitted to Erica Hines at ehines@masscec.com by April 27, 2026, with the subject line 'RFP: PTS-2026-01'.
Eligibility: qualified individuals or firms
Pipeline
Funder track record · does Massachusetts Clean Energy Center (MassCEC) actually pay grants?
✅ Proven payer · 17 grantees found · last payout 2026-08-25 · checked 2026-10-13 · 0 forum reports, 9 web pages read, 2 unverifiable claims dropped
Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.
| Grantee | Amount | Date | Evidence |
|---|---|---|---|
| Wild Microbes Company | $200,000 | 2026-08-25 page date | “* **Wild Microbes Company** – Cambridge, MA * $200,000 to advance its technology that uses naturally occurring microbes to produce sustainable alternatives to animal-derived and petroleum-based ingredients used in fo” source |
| Fleet Robotics | $150,000 | 2026-08-25 page date | “* **Fleet Robotics** – Charlestown, MA * **$150,000** to further develop its autonomous robots that clean ship hulls while vessels are in service, helping prevent the buildup of marine organisms and therefore improvi” source |
| KIRA Systems Inc. | $75,000 | 2026-08-25 page date | “* **KIRA Systems Inc.** – Boston, MA * **$75,000** to develop a proprietary energy-efficient electrified water treatment system to address hazardous industrial waste.” source |
| EntoCellular | $75,000 | 2026-08-25 page date | “* **EntoCellular** – Medford, MA * **$75,000** to optimize the production of an insect-based biomass ingredient for reptile food applications with reduced carbon emissions and water usage.” source |
| Cubic PV | $300,000 | 2026-02-11 page date | “* **Cubic PV** – Bedford, MA * **$300,000** to improve material quality in solar cells, which will improve performance for solar panels.” source |
| Elateq, Inc. (Dr. Ljiljana Rajic) | $300,000 | 2026-02-11 page date | “* **Elateq, Inc. (Dr. Ljiljana Rajic)** – Northampton, MA * **$300,000** to further the development of novel electrochemical technologies to treat water systems effectively and efficiently, including the removal of t” source |
| CemCycle, Inc. | $75,000 | 2026-02-11 page date | “* **CemCycle, Inc.** – Cambridge, MA * **$75,000** to develop a proprietary technology that couples carbon capture and waste management.” source |
| LiftLabs, Inc. | $75,000 | 2026-02-11 page date | “* **LiftLabs, Inc.** – Lowell, MA * **$75,000** to develop a technology that attaches to scallop cages and uses inflatable lift bags to eliminate rope entanglement and reduce the impact of scallop harvesting on marin” source |
| Daqus Energy | $345,200 | 2026-02-11 page date | “* **Daqus Energy** – Woburn, MA * **$345,200** to demonstrate its critical-metal-free, energy-efficient lithium-ion battery cathode technology for electric vehicles.” source |
| ElectricFish Energy | $231,709 | 2026-02-11 page date | “* **ElectricFish Energy** – San Carlos, CA (project site in Mashpee, MA) * **$231,709** to demonstrate its microgrid-integrated, battery-backed fast EV charging technology.” source |
| MassHire Lowell Young Adult Career Center | $150,000 | 2025-11-21 | “The MassHire Lowell Young Adult Career Center will receive $150,000 to build up capacity and support the further development of its Clean Energy Career Exploration Program.” source |
| Project Learn | $50,000 | 2025-11-21 | “Project Learn, a Lowell-based nonprofit, will receive $50,000 in grant funding for the planning and design of the pilot for its Renewable Futures Lab, a planned hands-on summer course for youth in Lowell to prepare for c” source |
| Building Mass Careers | $50,000 | 2025-11-21 | “Another organization, Building Mass Careers, is also receiving $50,000 under the Equity Workforce Planning and Capacity category to create a pre-apprenticeship program to serve low-income individuals in underrepresented ” source |
| Heart of New England Council for Scouting America | $40,000 | 2025-11-21 | “The Heart of New England Council for Scouting America will also receive funding through this round, with $40,000 going to the group to incorporate “clean energy and climate-critical career exploration through merit badge” source |
| Acton, Town of | $20,000 | undated | “**Acton, Town of** _Partner: BlocPower_ Develop an assessment to support and enable the electrification of low-income, multi-family and renter-occupied properties. ICB: $20,000” source |
| All In Energy | — | undated | “**All In Energy** _Partners: Groundwork Lawrence, New Ecology Institute, Resonant Energy, Valley Home Insulation_” source |
| CapyBara Energy | — | undated | “CapyBara Energy received an AmplifyMass grant from the Massachusetts Clean Energy Center (MassCEC) to support workforce development and project execution associated with a U.S. Department of Energy–funded demonstration.” source |
Trust breakdown (3/3 checkable facts verified)
| Signal | Weight | Result | Note |
|---|---|---|---|
| deadline | 0.35 | 100% | quoted in source |
| apply link | 0.075 | 100% | link in source |
| funder | 0.075 | 100% | named in source |
| source quality | 0.15 | 50% | social or search hit |
| model confidence | 0.1 | 95% | model self-report |
Fit breakdown (against the ORG_* profile)
| Signal | Weight | Result | Note |
|---|---|---|---|
| model fit | 0.5 | 10% | model rated 10% |
| ecosystem overlap | 0.25 | 0% | none vs aleo |
| category overlap | 0.15 | 33% | infra, dev_tooling vs zk, privacy, infra, dev_tooling, security, interoperability |
| tech overlap | 0.1 | 0% | .net, c#, sql, azure, azure devops, cosmos db vs rust, leo, zk |
Sources (1)
| Role | Document | From | Fetched |
|---|---|---|---|
| primary | Request for Proposals: Technology Consultant for the Production Tracking System (PTS) | MassCEC | Web discovery: ecosystem sweep | 2026-10-13 |
History (1)
| v | Changed | Fields |
|---|---|---|
| 1 | 2026-10-13 | created |
Extracted text
# Request for Proposals: Technology Consultant for the Production Tracking System (PTS)
Please note – the publishing date for questions with answers to be posted on the MassCEC website has been updated from Thursday, 4/9/26 to Wednesday, 4/15/26 to allow additional time for processing.
The Massachusetts Clean Energy Center (MassCEC) is seeking proposals from qualified individuals or firms for a three-phase engagement to evaluate, modernize, host, and support the PTS. In Phase 1, MassCEC requires a thorough diagnostic assessment of the current system, including review of codebases, deployment pipelines (e.g., Azure DevOps or other CI/CD tools), data models, security controls, and system performance. The current system is a .NET application (primarily C#) with an SQL backend, hosted in Microsoft Azure. Phase 2 will focus on implementing the approved modernization strategy and delivering a production-ready modernized system. Phase 3 will provide ongoing operations, hosting, and support.
The objective is to preserve and improve existing registration, reporting, and verification functionality. The project should also enhance security, accessibility, logging, monitoring, and program compliance. The system must ensure seamless processing for programs including Renewable Portfolio Standard (RPS) Mass Class I, Solar Renewable Energy Certificates (SREC), Renewable Thermal (RT), Alternative Energy, and Clean Peak Standard (CPS).
Deliverables are expected to include a modernization strategy, migration plan, technical documentation, automated deployment capabilities, and long-term operational support. Support must include maintenance, bug-fixing, and enhancements with a focus on maintainability, scalability, and risk mitigation. The outcome will be a modernized, functionally equivalent PTS with improved security, reliability, and performance.
Closed
Program Area
[Corporate](/funding?program_area%5B0%5D=886)
[Contact](mailto:ehines@masscec.com)
## Procurement Schedule
Process Step
Timing
Release of RFP
March 30, 2026
Questions due to MassCEC via email to ehines@masscec.com
April 3, 2026
Questions with Answers Posted to MassCEC Website
April 9, 2026
to April 15, 2026
Proposals Due
April 27, 2026
Interviews of Top Applicants
Mid-May, 2026
Notification of Award
Early June, 2026
## Apply
### Application Process
Proposals must be submitted to Erica Hines, Senior Director, at ehines@masscec.com no later than 11:59 PM Eastern Time on Monday, April 27, 2026. The subject line must include “RFP: PTS-2026-01”. Only responses that include all required documents and address each section of the RFP will be considered.
Under no circumstances will MassCEC accept responses past the deadline.
Please include a brief summary of you or your organization’s commitment to DEI and/or EJ principles. If available, please provide or link to relevant materials and brief examples of initiatives or projects demonstrating this commitment.
Please disclose to MassCEC in your application any use of, or planned use of, generative AI either in responding to this RFP or in carrying out the scope of work required for the project or services, if awarded. MassCEC reserves the right to review submitted materials to determine whether generative AI was likely used, and reserves the right to accept or reject any proposed uses of generative AI, request supplemental non-AI generative materials, or cancel or rescind an award where generative AI has been used without MassCEC approval.
### Application Materials
Document
[Request for Proposals: Technology Consultant for the Production Tracking System (PTS)](/sites/default/files/documents/rfp_pts_2026_updated_040926.docx "rfp_pts_2026_updated_040926.docx")
Document
[Attachment A - Applicant Signature and Acceptance Form](/sites/default/files/documents/attachment_a_-_applicant_signature_and_acceptance_form_0.docx "attachment_a_-_applicant_signature_and_acceptance_form.docx")
Document
[Attachment B - Sample Agreement](/sites/default/files/documents/attachment_b_-_sample_agreement_1.docx "attachment_b_-_sample_agreement.docx")
## Frequently Asked Questions
### GENERAL INFORMATION
#### 1\. What level of modernization is expected: refactor, rebuild, or functional enhancement?
The level of modernization is not predefined. Phase 1 will assess the current system and define a recommended modernization approach, which may include targeted refactoring, component‑level redesign, and/or functional enhancements. A full rebuild is not assumed and must be clearly justified if proposed. Phase 2 will be limited to the implementation of the approved approach. The selected vendor will be responsible for documenting rationale, tradeoffs, risks, and implementation planning as part of their recommendation.
#### 2\. What service levels are required for ongoing support, including response time targets, uptime expectations, and support coverage hours?
Formal service‑level agreements (SLAs) are not predefined. Respondents should propose standard support models, including response times, uptime targets, escalation paths, and coverage hours, with clear differentiation between critical and non‑critical issues. Final service levels will be negotiated and incorporated into the contract.
#### 3\. What downtime window, if any, is acceptable during system migration or cutover activities?
Acceptable downtime has not been pre-defined. Any migration or cutover activity must minimize business disruption and will be subject to advance planning, testing, rollback procedures, and MassCEC approval. Respondents should clearly document downtime assumptions and continuity measures in their proposed approach.
FAQs continues...
#### 4\. Are there specific security or compliance frameworks the system must align to (e.g., NIST, SOC 2, FedRAMP)?
The modernized system is expected to align with MassCEC and Commonwealth IT security requirements and be broadly NIST‑aligned, though formal certification is not required. Vendors must describe how their approach meets applicable security, privacy, and data‑protection expectations.
#### 5\. Which integrations require third‑party coordination, and who is responsible?
The PTS integrates with external systems, including program registries, reporting APIs, and other data exchanges. A detailed inventory will be provided during Phase 1. The selected vendor will be responsible for coordinating all technical testing, scheduling, and issue resolution with third parties. MassCEC will support initial introductions and provide business context as needed.
#### 6\. What environments currently exist, and who manages them?
The PTS currently operates across standard environments (development, test, staging, production). Additional details will be provided during Phase 1. The selected vendor will be responsible for evaluating the environment strategy and improving deployment and management processes where appropriate.
#### 7\. What criteria will be used for acceptance of deliverables?
Each phase will have documented deliverables and acceptance criteria defined at phase initiation. Acceptance is based on completeness, clarity, alignment with scope, demonstrated functionality (as applicable), and adherence to agreed service expectations. All deliverables require formal MassCEC review and written sign‑off prior to phase continuation.
#### 8\. How are ongoing enhancements distinguished from change orders during Phase 3?
Ongoing enhancements include minor feature improvements, usability refinements, and incremental changes that do not materially alter scope or architecture. Change orders are required for work that materially alters functionality, scope, technical architecture, or introduces major new features. MassCEC retains final authority in classification and prioritization through a formal intake and approval process.
#### 9\. What version of .NET is the current PTS built on?
The current PTS application is built on .NET 8 (.NET 5+ platform). The selected vendor will validate all framework versions, dependencies, and upgrade constraints during Phase 1.
### AZURE INFRASTRUCTURE
#### 10\. Are there existing automated tests or known areas of technical debt? Will vendors receive code access?
Existing automated testing, test coverage, and areas of technical debt will be assessed and validated during Phase 1. Upon contract award and execution of an NDA or data‑use agreement, the selected vendor will be granted access to the PTS codebase, database schema, and available architecture documentation.
### DATA & INTEGRATIONS
#### 11\. Can MassCEC share the current Azure hosting topology and CI/CD details?
High‑level information regarding Azure services, infrastructure configuration, and CI/CD pipelines will be made available during Phase 1. The selected vendor will be expected to review existing infrastructure, deployment practices, and pipelines and recommend improvements aligned with security and reliability best practices.
#### 12\. How are production and registration records stored?
The PTS utilizes a primary SQL Server database for core system data, along with a Cosmos DB data store supporting CPS program production data. Additional data architecture details will be provided during Phase 1.
#### 13\. What is the data exchange format for NEPOOL GIS and other APIs?
PTS integrations include a mix of file‑based and API‑based exchanges. Integration documentation and specifications, where available, will be provided upon contract award. The selected vendor is expected to validate, document, and modernize integrations as part of Phase 1 findings.
### FUTURE STATE & MASSCEC PREFERENCES
#### 14\. Is Renewable Thermal (RT) integration fully defined?
The RT integration scope is not fully predefined. Phase 1 is expected to assess requirements, data structures, and integration approach, with implementation proceeding in Phase 2 based on approved scope and priorities.
#### 15\. Does MassCEC have a preferred modernization or hosting approach?
MassCEC does not mandate a specific modernization or hosting model. Respondents should propose solutions aligned with system longevity, maintainability, scalability, and security. Final architectural decisions will be informed by Phase 1 recommendations.
#### 16\. Are there technology standards or policies vendors must follow?
Vendors must comply with applicable MassCEC and Commonwealth IT, security, accessibility, and procurement policies. Any required standards or constraints will be shared during contract negotiation and Phase 1 execution.
### ACCESSIBILITY & REGULATORY CONSTRAINTS
#### 17\. Does MassCEC prefer open‑source or commercial tools?
MassCEC has no strict preference. Solutions should be cost‑effective, secure, well‑supported, and sustainable. Vendors must clearly articulate tradeoffs, including total cost of ownership and vendor lock‑in considerations. Comprehensive documentation is a required deliverable.
#### 18\. Are there accessibility requirements beyond WCAG 2.1 AA?
The modernized PTS must meet WCAG 2.1 AA accessibility standards. Vendors should identify any additional applicable accessibility considerations and describe how compliance will be validated.
#### 19\. Are there planned regulatory changes in the next 12–24 months?
MassCEC anticipates ongoing regulatory evolution. The system architecture should be flexible and configurable to accommodate future regulatory changes without significant re‑engineering.
#### 20\. Are there deployment blackout windows?
MassCEC avoids deployments immediately before or during critical reporting windows, including the monthly 10‑day production reporting period and quarterly reporting cycles. Deployment timing will be coordinated to minimize risk.
### EVALUATION & CONTRACT
#### 21\. Is there an incumbent vendor and transition support?
An incumbent vendor currently supports the PTS. MassCEC expects a structured transition and knowledge‑transfer period as part of Phase 1 onboarding.
#### 22\. Are COMMBUYS or MMARS registration required?
Vendors must comply with all Commonwealth and MassCEC contracting requirements. Any required registrations will be completed prior to contract execution.
#### 23\. Can Phase 2 pricing be finalized after Phase 1?
MassCEC recognizes that Phase 2 scope depends on Phase 1 findings. Respondents may propose an indicative Phase 2 pricing approach with final fixed‑fee pricing subject to Phase 1 deliverables, roadmap approval, and contract amendment.
#### 24\. Will MassCEC designate a technical point of contact?
MassCEC will designate appropriate business and technical points of contact during Phase 1. Strategic oversight will remain with the Senior Director, with working‑level coordination supported by designated technical staff.
## Additional Funding Opportunities
[Business Builds: Climatetech](/program/business-builds-climatetech)
Program Area
Technology to Market
Program Type
Grants
Award Potential:
$500K - $2M
Application Deadline:
October 1, 2026
[Clean Energy Internship Program for Employers](/program/clean-energy-internship-program-employers)
Program Area
Workforce, Clean Transportation, Env. Justice/DEI, High Performance Buildings, Net Zero Grid, Offshore Wind, Renewable Energy Generation, Technology to Market
Program Type
Grants
Award Potential:
$4,320/intern for Fall or Spring session; $8,640/intern for Summer session or for Construction, Installation, and Maintenance
Application Deadline:
[Climatetech Pathmaker Grants](/program/climatetech-pathmaker-grants)
Program Area
Env. Justice/DEI, Workforce
Program Type
Grants
Award Potential:
Up to $10,000 per employment outcome
Application Deadline:
* January 8, 2027
* April 16, 2027
[See all](/)