Annual request for proposals (RFP) - CY2026/FY2028
MnDOT and the Local Road Research Board (LRRB) are seeking research proposals from qualified universities to address transportation research needs identified by Minnesota practitioners. Eligible institutions include specific universities and those in the MnSCU system, MnROAD, and MnDOT Office of Materials and Road Research. Proposals must address high-priority research needs, use the MnDOT/LRRB Proposal Form (limited to 14 pages), and be submitted via university research contacts to the MnDOT Office of Research & Innovation with a Proposal Summary in Excel format. Funding decisions are posted in January/February, with funds available starting July 1.
Eligibility: Qualified universities including Auburn University, Michigan State University, Michigan Technological University, Montana State University, North Dakota State University, Texas A&M University, Texas State University, University of Illinois at Urbana-Champaign, University of Minnesota, University of New Hampshire, University of St. Thomas, and universities in the Minnesota State Colleges and Universities (MnSCU) system, MnROAD, and the MnDOT Office of Materials and Road Research.
Pipeline
Funder track record Β· does MnDOT and the Local Road Research Board (LRRB) actually pay grants?
π‘ Some payout evidence Β· 20 grantees found Β· last payout 2025-01-22 Β· checked 2026-10-10 Β· 0 forum reports, 9 web pages read, 8 unverifiable claims dropped
Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.
| Grantee | Amount | Date | Evidence |
|---|---|---|---|
| Assessing the Capacity of Four Steel Hinges Extracted from Existing Bridges | β | 2025-01-22 page date | βAssessing the Capacity of Four Steel Hinges Extracted from Existing Bridgesβ source |
| Quantifying the Influence of Driver Behavior on Greenhouse Gas Emissions and Air Quality | β | 2025-01-22 page date | βQuantifying the Influence of Driver Behavior on Greenhouse Gas Emissions and Air Qualityβ source |
| Are Current Rigid Pavement Roundabout Designs Working in Minnesota? | β | 2025-01-22 page date | βAre Current Rigid Pavement Roundabout Designs Working in Minnesota?β source |
| Holistic Design and Selection Criteria for Unbound Geomaterials Used in Pavement Systems | β | 2025-01-22 page date | βHolistic Design and Selection Criteria for Unbound Geomaterials Used in Pavement Systemsβ source |
| Design Guidance and Best Practices for the Use of Light Fill | β | 2025-01-22 page date | βDesign Guidance and Best Practices for the Use of Light Fillβ source |
| Navigating Healthier Community Outcomes with Transportation Corridor Rankings | β | 2025-01-22 page date | βNavigating Healthier Community Outcomes with Transportation Corridor Rankingsβ source |
| Minneapolis | $20,004,000 | undated | βMinneapolis was awarded a Safe Streets for All grant for safety treatments focused on high injury streets.β source |
| Terminal 2 | $20,000,000 | undated | βThis award funds the expansion of Terminal 2 to include two new gates and related infrastructure at the north end of the terminal.β source |
| TH 210 Brainerd (Rural) | $25,000,000 | undated | βRural Surface Transportation Grant Program TH 210 Brainerd (Rural) Reconstruction and rehabilitation of a four mile segment of MN Hwy 210 from Baxter Dr to Pine Shores Rd.β source |
| Low-no grant to purchase and replace 4 buses and 2 electric fareboxes. | $723,171 | undated | βLow-no grant to purchase and replace 4 buses and 2 electric fareboxes. Started $723,171 $903,966 $180,793β source |
| The City of Willmar | $200,000 | undated | βThe City of Willmar has been awarded IIJA funding to complete a SS4A Action Plan. The final document will provide the city with a multi-year actionable transportation safety plan.β source |
| Reconstruction of Hwy 59 from approximately I-90 to Hwy 60 in the City of Worthington, MN. | $15,140,000 | undated | βReconstruction of Hwy 59 from approximately I-90 to Hwy 60 in the City of Worthington, MN. Major project items include grading, concrete pavement, roundabouts, utilities, and signals.β source |
| Develop a new Comprehensive Safety Action Plan for West St. Paul. | $200,000 | undated | βDevelop a new Comprehensive Safety Action Plan for West St. Paul. From this plan the city can apply for Implementation Grants through SS4A.β source |
| The Fond du Lac Band | $138,240 | undated | βThe Fond du Lac Band is requesting funding through the FY 2024 Safe Streets and Roads for All Planning grant program for the development of a SS4A Comprehensive Safety Action Plan.β source |
| Minnesota Commercial Railway Locomotive Emission Reduction Project | $15,862,400 | undated | βConsolidated Rail Infrastructure and Safety Improvement Grants (CRISI) Minnesota Commercial Railway Locomotive Emission Reduction Project A locomotive modernization project that will replace nine (9) unregulated locomotiβ source |
| Progressive Rail Incorporated | $37,264,356 | undated | βConsolidated Rail Infrastructure and Safety Improvement Grants (CRISI) Progressive Rail Incorporated Progressive Rail Incorporated (PGR) is proposing a critical upgrade to their mainline infrastructure to elevate track sβ source |
| Crow Wing County | $200,000 | undated | βCrow Wing County was awarded a Safe Streets and Roads for All (SS4A) grant to develop a comprehensive safety action plan. The goal of the project is to improve roadway safety in Crow Wing County.β source |
| The City of Hopkins | $165,832 | undated | βThe City of Hopkins was awarded $165,832 in federal funding through the FY 2024 SS4A Planning and Demonstration grant program for the development of a comprehensive Transportation Safety Action Plan. .β source |
| Twin Cities Charging and Fueling Infrastructure Discretionary Grant | $15,000,000 | undated | βTwin Cities Charging and Fueling Infrastructure Discretionary Grant EV charging infrastructure Not Started $15,000,000 $18,750,000β source |
| Hwy 19 Reconstruction in Northfield FFY25 & 26 MPDG/Rural | $25,490,000 | undated | βRural Surface Transportation Grant Program Hwy 19 Reconstruction in Northfield FFY25 & 26 MPDG/Rural Reconstruction of Hwy 19 from Hwy 3 to Decker Aveβ source |
Trust breakdown (3/3 checkable facts verified)
| Signal | Weight | Result | Note |
|---|---|---|---|
| deadline | 0.35 | 100% | quoted in source |
| apply link | 0.075 | 100% | link in source |
| funder | 0.075 | 100% | named in source |
| source quality | 0.15 | 50% | social or search hit |
| model confidence | 0.1 | 90% | model self-report |
Fit breakdown (against the ORG_* profile)
| Signal | Weight | Result | Note |
|---|---|---|---|
| model fit | 0.5 | 10% | model rated 10% |
| ecosystem overlap | 0.25 | 0% | none vs aleo |
| category overlap | 0.15 | 0% | research vs zk, privacy, infra, dev_tooling, security, interoperability |
| tech overlap | 0.1 | 0% | none vs rust, leo, zk |
Sources (1)
| Role | Document | From | Fetched |
|---|---|---|---|
| primary | Research Solicitation - Research & Innovation - MnDOT | Web discovery: ecosystem sweep | 2026-10-10 |
History (1)
| v | Changed | Fields |
|---|---|---|
| 1 | 2026-10-10 | created |
Extracted text
## Annual request for proposals (RFP) - CY2026/FY2028
The 2026 MnDOT/LRRB academic research RFP opens July 31.
### Funding awards
[Funding awards](https://www.dot.state.mn.us/research/awards.html "Awards page")Β for the 2025 [academic research solicitation](https://www.dot.state.mn.us/research/process-and-docs.html "Solicitation process page")Β were announced on February 5, 2026. We thank all those who participated in the proposal process.
### Future solicitations
Qualified universities will be invited to submit proposals for the next RFP beginning on July 31.
#### Who is eligible?
This solicitation is open to the following qualified universities:
* Auburn University
* Michigan State University
* Michigan Technological University
* Montana State University
* North Dakota State University
* Texas A&M University
* Texas State University
* University of Illinois at Urbana-Champaign
* University of Minnesota
* University of New Hampshire
* University of St. Thomas
The solicitation is also open to universities in the Minnesota State Colleges and Universities (MnSCU) system, MnROAD and the [MnDOT Office of Materials and Road Research](/materials/).
#### What research is being requested?
Each year, MnDOT and the Local Road Research Board (LRRB) seek research proposals. These proposals attempt to address the research needs and ideas of Minnesota city, county and state transportation practitioners.
MnDOT collects research ideas from various sources, including MnDOT staff and city/county engineers throughout the year. These ideas are developed into [Research Need Statements](need-statements.html). Researchers are asked to submit proposals to address these research needs and are encouraged to work with the Technical Liaison (TL) listed for a particular research need statement when developing the research proposal.
Researchers are reminded to follow and organize each research project according to the terms of their University Master Contract with MnDOT and the [Technical Advisory Panel (TAP) Guidelines (PDF)](https://edocs-public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=31486462). Researchers should be familiar with this research process prior to submitting research proposals.Β Also, research proposals submitted must allocate more than 50 percent of the budget to the Master Agreement University, State University, or the MnDOT Office of Materials and Road Research.
#### How to submit a proposal
Proposals must:
* Be formed around the high-priority research needs for MnDOT and the LRRB.
* Use the MnDOT/LRRB Proposal Form. (Note: They are limited to 14 pages.)
* Universities will collate and coordinate each University submittal to MnDOT.
* MnDOT **will not** accept proposals directly from proposing researchers.
* University research contacts must submit their proposals in MS Word format to the [MnDOT Office of Research & Innovation](mailto:research.dot@state.mn.us)**)** along with the [Proposal Summary (Excel)](https://edocs-public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=33107290) of all their proposals.
#### Unsolicited proposals (not responding to a need statement)
Sometimes a researcher and/or project champion will pursue a research topic by submitting an unsolicited proposal. This may happen when an important MnDOT research need was not captured in the need statements and/or a principal investigator with known specialized knowledge in a topic area has an idea. While it is not the primary pathway for funding academic research, MnDOT and the LRRB accept unsolicited proposals from qualified universities during the annual academic research solicitation.
Unsolicited proposals must identify a champion for the project in order to be considered for funding. This can be a Minnesota Local Agency, MnDOT Office Director, MnDOT District, or MnDOT staff member. The proposal must include a letter/email of support from this project champion. After identification of a project champion, submittal deadlines and process are the same as that for RFP responses.
### Research funding levels and duration
Researchers are encouraged to review both the [MnDOT Research & Innovation](/research/index.html) and [LRRB](https://www.lrrb.org/) websites for examples of previous research efforts.Β Project-level details for MnDOT and LRRB research projects, organized by fiscal year, can be found in our [annual At-A-Glance publications](/research/annual-reports.html).
### When will proposals be selected for funding?
The [selection process](/research/process-and-docs.html) is documented on the Research & Innovation website:
* **Early November:** Submitters are notified if a presentation is requested by MnDOT/LRRB. If you are **not** contacted by this time, your proposal is not moving forward for funding consideration by MnDOT/LRRB.
* **Early December:** Presentations made to MnDOT.
* **Early December**: Presentations are made to the LRRB.
* **January/February:** Funding decisions will be posted.
* **July 1**: Funding becomes available. Earlier start dates may be approved depending on the circumstances.
_Last updated: July 2026_