← Opportunities

Request for Proposal for Chain-Link Fence Replacement at Wastewater Treatment Plant

Funder
Village of Cold Spring, New York 🟡 Some evidence
Type / status
rfp · closed
Amount
—
Deadline
2026-06-15 (past)
“DUE BY: JUNE 15, 2026, at 2:00 PM”
Ecosystems
Categories
Tech stack
Apply
/DocumentCenter/View/5585
Source
https://www.coldspringny.gov/m/newsflash/Home/Detail/141
Fit
5% · poor fit · The Village of Cold Spring team works in zk, privacy, infra, dev tooling, security, and interoperability on Aleo, while this RFP is for physical chain-link fence replacement at a wastewater plant, which is entirely outside their ecosystem and kind of work.
Trust
79% · model self-report 95% · first seen 2026-10-02 · v1
Verified
2026-10-02 · by extraction

The Village of Cold Spring, New York is seeking proposals to replace approximately 60 linear feet of chain-link fence at its Wastewater Treatment Plant. Contractors must remove existing damaged fence, clear brush and vegetation, install new fencing, and restore the area according to plans and specifications. Bids must be submitted by June 15, 2026, at 2:00 PM via hand delivery, email, or fax to the Village Clerk-Treasurer.

Eligibility: Contractors interested in responding to this Request for Proposals and Quotes

Pipeline

Override status:

Funder track record · does Village of Cold Spring, New York actually pay grants?

🟡 Some payout evidence · 1 grantee found · checked 2026-10-02 · 0 forum reports, 6 web pages read

Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.

GranteeAmountDateEvidence
The Village of Cold Spring, in partnership with the Village of Nelsonville and Town of Philipstown—undated“The Village of Cold Spring, in partnership with the Village of Nelsonville and Town of Philipstown, received a New York State Department of Environmental Conservation Hudson River Estuary Program grant to better understa” source

Trust breakdown (2/3 checkable facts verified)

SignalWeightResultNote
deadline0.35100%quoted in source
apply link0.0750%malformed url
funder0.075100%named in source
source quality0.1550%social or search hit
model confidence0.195%model self-report

Fit breakdown (against the ORG_* profile)

SignalWeightResultNote
model fit0.510%model rated 10%
ecosystem overlap0.250%none vs aleo
category overlap0.150%none vs zk, privacy, infra, dev_tooling, security, interoperability
tech overlap0.10%none vs rust, leo, zk

Sources (1)

RoleDocumentFromFetched
primaryNOTICE TO BIDDERS: Request for Proposal + Quotes for Proposed Chain-Link Fence Replacement at WWTP • Cold Spring, NYWeb discovery: ecosystem sweep2026-10-02

History (1)

vChangedFields
12026-10-02created

Extracted text

# News Flash

# NOTICE TO BIDDERS: Request for Proposal + Quotes for Proposed Chain-Link Fence Replacement at WWTP

Village News & Announcements Posted on May 24, 2026

#  **![VCS-Blue-on-White](https://www.coldspringny.gov/ImageRepository/Document?documentId=5586)****NOTICE TO BIDDERS**

## **REQUEST FOR PROPOSALS and QUOTES FOR PROPOSED CHAIN-LINK FENCE REPLACEMENT AT WASTEWATER TREATMENT PLANT**

## **DUE BY: JUNE 15, 2026, at 2:00 PM**

  

### LINK TO DOWNLOAD BID DOCUMENTS: 

### [/DocumentCenter/View/5585](/DocumentCenter/View/5585)

###   

### **NOTICE is hereby given** that quotations and proposals for the work herein described will be received by the Village of Cold Spring, New York, at the Office of the Village Clerk, 85 Main Street, Cold Spring, New York, 10516, by Monday, June 15, 2026, at 2:00 PM.

**GENERAL INFORMATION:** The work consists of furnishing all labor, materials and equipment necessary to replace approximately 60 linear feet of chain-link fence at the Village of Cold Spring Wastewater Treatment Plant (WWTP). The Contractor shall remove existing damaged fence, remove brush and vegetation as needed, install the fence, and restore the area, all in accordance with the plans and specifications, and as directed by the Engineer.

**BID DOCUMENTS:** Bid documents may be obtained from the Village website ([/DocumentCenter/View/5585](/DocumentCenter/View/5585))  on or after Monday, May 25, 2026. When using the Village website to obtain documents, the Village Clerk must be notified at (845) 265-3611 or [vcsclerk@coldspringny.gov](mailto:vcsclerk@coldspringny.gov). 

**TO SUBMIT A PROPOSAL and QUOTE:** Individuals interested in responding to this Request for Proposals and Quotes shall submit one (1) original quote on the forms provided and any necessary supporting documentation to the attention of Marjorie E. Gage, Village Clerk-Treasurer, no later than Monday, June 15, 2026, at 2:00 PM. 

**By hand:**

_Attn:_ **Marjorie E. Gage, Village Clerk-Treasurer**

**Village Hall**

**85 Main Street**

**Cold Spring, NY 10516**

**Or by email:** [vcsclerk@coldspringny.gov](mailto:vcsclerk@coldspringny.gov) 

**Or by fax:** (845) 265-1002

 **Any quotes received after this deadline will not be considered.** The Village of Cold Spring reserves the right to reject any and all Bids, to waive any informality in any bid, and to award the Contract to other than the lowest Bidder if deemed in the best interest of the Village to do so.

The Bidder assumes the risk of any error or delay in the delivery of its bid by whatever delivery means it chooses (e.g. mail, hand delivery, courier, overnight service, fax, email, or any other means), including the handling of mail by employees of the Village of Cold Spring. 

 **By Order of the Village of Cold Spring Board of Trustees,** Kathleen E. Foley, Mayor

Signed: Marjorie E. Gage, Village Clerk-Treasurer, May 24, 2026

  

## LINK TO DOWNLOAD BID DOCUMENTS: 

### [/DocumentCenter/View/5585](/DocumentCenter/View/5585)

  

* * *

## Related News

*   ### [COMMUNITY SURVEY: Rainfall Flooding Survey Closes This Sunday, October 4, 2026](/m/newsflash/Home/Detail/216)
    
    Village News & Announcements Posted on October 01, 2026
    
*   ### [STORM UPDATES as of 4:00 PM, SUNDAY, 9/27/2026](/m/newsflash/Home/Detail/212)
    
    Village News & Announcements Posted on September 25, 2026
    
*   ### [Main Street Filming Notice: September 30, 2026; 9:00 AM to 2:00 PM](/m/newsflash/Home/Detail/214)
    
    Village News & Announcements Posted on September 28, 2026
    
*   ### [NOTICE: ROADWAY CLOSURES + PARKING RESTRICTIONS, Fri. 10/2/2026; Mon.-Tues. 10/5-10/6/2026](/m/newsflash/Home/Detail/215)
    
    Village News & Announcements Posted on September 30, 2026
    
*   ### [BULK PICKUP UPDATE](/m/newsflash/Home/Detail/213)
    
    Village News & Announcements Posted on September 28, 2026 | Last Updated on September 28, 2026