5%· poor fit · The team's expertise in ZK, privacy, and Rust/Leo is entirely unrelated to polygon mapping, agricultural supply chains, or geospatial data analytics.
Trust
99%· model self-report 95% · first seen 2026-10-01 · v6
Verified
2026-10-23 · by extraction
The Global Platform for Sustainable Natural Rubber (GPSNR) seeks a consultant to map smallholder rubber farms in Indonesia using polygon mapping techniques. The project aims to determine the time and cost required per polygon mapped in complex supply chains. Deliverables include geoJSON polygon data, bi-weekly progress reports, cost-per-hectare analysis, scalability recommendations, and compliance with GDPR/PDPA. Proposals must include a workplan, budget breakdown, and relevant experience, submitted via email by the deadline.
Eligibility: Individuals or firms with experience relevant to polygon mapping and supply chain assessment in agricultural contexts.
Pipeline
Funder track record · does Global Platform for Sustainable Natural Rubber (GPSNR) actually pay grants?
🟡 Some payout evidence · 1 grantee found · checked 2026-10-01 · 0 forum reports, 6 web pages read
Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.
Grantee
Amount
Date
Evidence
GPSNR’s capacity-building projects
—
undated
“In addition to providing the donation to GPSNR’s capacity-building projects, Bridgestone is a member of GPSNR’s Smallholder Representation and Capacity Building Working Group, which aims to provide effective support for ”source
Trust breakdown (3/3 checkable facts verified)
Signal
Weight
Result
Note
deadline
0.35
100%
quoted in source
apply link
0.075
100%
link in source
funder
0.075
100%
named in source
source quality
0.15
50%
social or search hit
model confidence
0.1
95%
model self-report
corroboration
bonus
+10%
6 sources
Fit breakdown (against the ORG_* profile)
Signal
Weight
Result
Note
model fit
0.5
10%
model rated 10%
ecosystem overlap
0.25
0%
none vs aleo
category overlap
0.15
0%
data_analytics, research vs zk, privacy, infra, dev_tooling, security, interoperability
# Request For Proposal – GPSNR-RFP-C03-033-Polygon Mapping Indonesia
## Share This Post
# Introduction & Background
The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.
The Manufacturer’s Subgroup (SG) consists of GPSNR members who are rubber product manufacturers only. The SG is seeking a consultant/field to map their supply shed (i.e., all the farms that they are sourcing from) focusing on polygon mapping techniques in complex supply chains such as in Indonesia, Malaysia and Thailand – each with a separate RFP, and report on the price and time required for each polygon mapped.
# Objectives
The goal of the project is to investigate what effort (i.e., time and cost) may be required for a rubber processor to map their supply chain in complex supply chains in Indonesia.
The consultant is to map small holder farmers in selected regions within Indonesia. Manufacturers will specify the regions to be mapped at a later date.
The service provider should work with the Manufacturer’s Subgroup and the participating processors from Indonesia and their dealers to:
1. Keep track of the time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each polygon, and provide them to their GPSNR Point of Contact at the end of the survey.
2. Register farmers using a provided data logger application. The service provider is welcomed to use their own data logger application.
# Scope of Work/Expected Deliverables
Specifically, GPSNR expects the consultant to:
1. Map regions of rubber producers supplying to the participating processor in Indonesia via polygon mapping.
1. Single GPS coordinates should not be utilised irrespective of the size of the plantation.
2. Geo mapping to include coordinates up to 6 decimal places in geoJSON format
2. 2. Store/transfer geo location polygons mapped, to a 3rd party database as designated.
3. Bi-weekly progress reports
4. Ensure compliance to applicable local and global data privacy norms and regulations such as but not limited to GDPR, PDPA, etc.
2. We would like a detailed account of the resources:
1. Price per polygon mapped – Cost per unit (per Farmer/Plot/Polygon)
2. Timeline to map Polygons per day (eg 18 months to map X polygons)
3. A recommendation of the scalability of this pilot
1. Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?
2. E.g., $X/farm is calculated but is not scalable due to what reason(s).
4. Interested parties should submit the quote for the following –
1. For mapping polygons (cost per Ha)
2. For mapping polygons + completing set of questionnaires as a part of risk assessment
5. Comply with applicable data privacy norms and regulations (including but not limited to GDPR and PDPA).
6. An optional activity that service providers could provide is the ability to integrate a transactional traceability function (own or 3rd party as designated)
Proposal Format and Contents
The proposal should include the following:
1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above
2. The timeline and key stages of operations based on Project Timeline below
3. Budget, including detailed breakdown of expected manpower, logistics, and costs as mentioned above
4. Description of past work and technical expertise that is relevant to this RFP
A list of project team members with their roles in the project and associated qualifications.
Submission Guidelines & Requirements
The following submission guidelines & requirements apply to this Request for Proposal:
1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
2. Examples of previous relevant work should be provided.
3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
6. Proposals must be received prior to the 25th of September to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration.
7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.
# Project Timelines
RFP Published
4 Sep 2023
Proposal Submission Deadline
25 Sep 2023
Contract Awarded
9 Oct 2023
Initial methodology presentation and Q&A with subgroup
23 Oct 2023
Bi-weekly progress updates
23 Oct till project conclusion
Other milestones to be agreed upon during initial Q&A
# Budget
The Platform is anticipating that a total budget of no more than 20USD/ha be allocated to this engagement and more competitive quotations will be favoured.
Payment terms shall be:
* 20% at the signing of the contract
* 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
* 50% to be agreed based on mutually agreed milestones
The allocation of the payment shall be based on the net amount after travel expenses, if deemed necessary by both the consultant and Secretariat, are incurred and documented.
# Evaluation Factors
### GPSNR will rate proposals based on the following factors, with cost being the most important factor:
1. Responsiveness to the requirements set forth in this Request for Proposal
2. Relevant past performance/ experience
3. Samples of work
4. Cost, including an assessment of total cost of ownership
5. Technical expertise/experience of bidder and bidder’s staff
GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.
[View RFP Document here](https://rubberplatform.sharepoint.com/:b:/s/GPSNRMembers/EUVYyNJPFbtBlyw-ymxXo0EBxkhF1Wcj5kOLu2Daj4pFeg?e=IYI6IT)
[PrevPreviousRequest For Proposal – GPSNR-RFP-A02-032-Thailand GAP Coaching](https://sustainablenaturalrubber.org/request-for-proposal-gpsnr-rfp-a02-032-thailand-gap-coaching/)
[NextRequest For Proposal – GPSNR-RFP-C03-034-Polygon Mapping MalaysiaNext](https://sustainablenaturalrubber.org/request-for-proposal-gpsnr-rfp-c03-034-polygon-mapping-malaysia/)
## More To Explore
### [Request For Proposal – GPSNR-RFP-C03-035-Polygon Mapping Thailand](https://sustainablenaturalrubber.org/request-for-proposal-gpsnr-rfp-c03-035-polygon-mapping-thailand/)
# Introduction & Background
The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.
The Manufacturer’s Subgroup (SG) consists of GPSNR members who are rubber product manufacturers only. The SG is seeking a consultant/field to map their supply shed (i.e., all the farms that they are sourcing from) focusing on polygon mapping techniques in complex supply chains such as in Indonesia, Malaysia and Thailand – each with a separate RFP, and report on the price and time required for each polygon mapped.
# Objectives
The goal of the project is to investigate what effort (i.e., time and cost) may be required for a rubber processor to map their supply chain in complex supply chains in Thailand.
The consultant is to map small holder farmers in selected regions within Thailand. Manufacturers will specify the regions to be mapped at a later date.
The service provider should work with the Manufacturer’s Subgroup and the participating processors from Thailand and their dealers to:
1. Keep track of the time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each polygon, and provide them to their GPSNR Point of Contact at the end of the survey.
2. Register farmers using a provided data logger application. The service provider is welcomed to use their own data logger application.
# Scope of Work/Expected Deliverables
Specifically, GPSNR expects the consultant to:
1. Map regions of rubber producers supplying to the participating processor in Thailand via polygon mapping.
1. Single GPS coordinates should not be utilised irrespective of the size of the plantation.
2. Geo mapping to include coordinates up to 6 decimal places in geoJSON format
2. 2. Store/transfer geo location polygons mapped, to a 3rd party database as designated.
3. Bi-weekly progress reports
4. Ensure compliance to applicable local and global data privacy norms and regulations such as but not limited to GDPR, PDPA, etc.
2. We would like a detailed account of the resources:
1. Price per polygon mapped – Cost per unit (per Farmer/Plot/Polygon)
2. Timeline to map Polygons per day (eg 18 months to map X polygons)
3. A recommendation of the scalability of this pilot
1. Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?
2. E.g., $X/farm is calculated but is not scalable due to what reason(s).
4. Interested parties should submit the quote for the following –
1. For mapping polygons (cost per Ha)
2. For mapping polygons + completing set of questionnaires as a part of risk assessment
5. Comply with applicable data privacy norms and regulations (including but not limited to GDPR and PDPA).
6. An optional activity that service providers could provide is the ability to integrate a transactional traceability function (own or 3rd party as designated)
Proposal Format and Contents
The proposal should include the following:
1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above
2. The timeline and key stages of operations based on Project Timeline below
3. Budget, including detailed breakdown of expected manpower, logistics, and costs as mentioned above
4. Description of past work and technical expertise that is relevant to this RFP
A list of project team members with their roles in the project and associated qualifications.
Submission Guidelines & Requirements
The following submission guidelines & requirements apply to this Request for Proposal:
1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
2. Examples of previous relevant work should be provided.
3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
6. Proposals must be received prior to the 25th of September to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration.
7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.
# Project Timelines
RFP Published
4 Sep 2023
Proposal Submission Deadline
25 Sep 2023
Contract Awarded
9 Oct 2023
Initial methodology presentation and Q&A with subgroup
23 Oct 2023
Bi-weekly progress updates
23 Oct till project conclusion
Other milestones to be agreed upon during initial Q&A
# Budget
The Platform is anticipating that a total budget of no more than 20USD/ha be allocated to this engagement and more competitive quotations will be favoured.
Payment terms shall be:
* 20% at the signing of the contract
* 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
* 50% to be agreed based on mutually agreed milestones
The allocation of the payment shall be based on the net amount after travel expenses, if deemed necessary by both the consultant and Secretariat, are incurred and documented.
# Evaluation Factors
### GPSNR will rate proposals based on the following factors, with cost being the most important factor:
1. Responsiveness to the requirements set forth in this Request for Proposal
2. Relevant past performance/ experience
3. Samples of work
4. Cost, including an assessment of total cost of ownership
5. Technical expertise/experience of bidder and bidder’s staff
GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.
[
View RFP Document here
](https://rubberplatform.sharepoint.com/:b:/s/GPSNRMembers/EbqoZublZsRCoB6lk8epn_sBgijA-lzsU7hn-2mqDzK0QA?e=GvcyEn)
GPSNR Secretariat September 6, 2023
### [Request For Proposal – GPSNR-RFP-A02-031-Proposing a Quantitative Orientation for GPSNR’s Reporting Matrix](https://sustainablenaturalrubber.org/request-for-proposal-gpsnr-rfp-a02-031-proposing-a-quantitative-orientation-for-gpsnrs-reporting-matrix/)
### ****Introduction & Background****
The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include rubber products manufacturers, natural rubber producers and processors, end users, smallholders and NGOs.
In 2021, GPSNR members approved [Reporting Requirements](https://sustainablenaturalrubber.org/gpsnr-reporting-requirements/) that would allow member companies to report on their progress implementing their commitments under the [Policy Framework](https://sustainablenaturalrubber.org/policy-framework/). With the approval of the Reporting Requirements, ordinary member companies now report annually on the questions included in the Reporting Matrix, which is organized by member category. Many of the questions in the matrix require qualitative responses. While qualitative information is helpful to understand a company’s progress in implementing its policy, it makes data analysis either to evaluate its progress year to year or to assess progress within a particular stakeholder category difficult.
GPSNR Policy Toolbox Working Group is seeking a consultant to review the GPSNR Reporting Matrix and revise the questions to generate quantitative responses wherever possible. The consultant should review the following GPSNR documents to inform these proposed revisions: draft GPSNR Key Performance Indicators (KPIs), GPSNR risk assessment guidance documents, feedback from member survey on Year 1 reporting. The consultant should also do a crosswalk with other credible reporting frameworks commonly used by members (e.g., Global Reporting Initiative – GRI, CDP Forest and ZSL SPOTT) to inform proposed changes.
### ****Objectives and Scope of Work****
1. Review GPSNR’s Reporting Matrix to identify questions that currently generate qualitative responses that could generate quantitative responses and propose revisions (this may not be feasible in all cases).
2. Do a crosswalk of the draft category specific KPIs to determine if they can replace any questions with qualitative responses in the reporting matrix.
3. Do a crosswalk of the Reporting Matrix questions with GRI, CDP Forest and ZSL-SPOTT reporting questionnaires to identify gaps between the GPSNR Reporting Matrix and the identified reporting schemes and propose equivalent questions from the identified reporting schemes to be integrated into the Reporting Matrix.
4. Review the recommendations for clarifying reporting questions and responses in the Reporting Matrix that were made by the consortium of consultants that prepared the GPSNR Reporting Guidance (Proforest, Are We There Yet, and Hevea Connect), and propose revisions to reporting questions/responses accordingly.
The consultant can also reference other GPSNR work, such as the risk assessment matrix and the draft Due Diligence Manual.
### ****Expected Deliverables****
GPSNR expects the consultant to:
Review and revise questions in the GPSNR Reporting Matrix that require a qualitative/narrative response that could be modified to generate a quantitative response. To support the process, the consultants should do the following:
1. Crosswalk the GPSNR Reporting matrix with reporting frameworks such as GRI, CDP Forest, and ZSL-SPOTT
2. Use feedback from members’ survey and report from consultants that prepared the reporting guidance to revise reporting questions/responses that have been flagged as unclear and in need of rewording.
3. Reference the below-listed GPSNR work and determine if any of the work could be used in place of the existing questions in the Reporting Matrix to obtain quantitative responses.
1. Draft stakeholder category KPIs document
2. Draft risk assessment guidance framework
3. Draft due diligence guidance document
Proposal Format and Contents
The proposal should include the following:
1. A workplan that outlines the key activities towards the deliverables outlined in **Expected Deliverables** above
2. The timeline and key stages of operations based on **Project Timeline** below
3. Budget, including detailed breakdown of expected manpower, logistics, and costs based on **Budget** below
4. Description of past work and technical expertise that is relevant to this RFP
A list of project team members with their roles in the project and associated qualifications.
### ********Submission Guidelines & Requirements********
The following submission guidelines & requirements apply to this Request for Proposal:
1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
2. Examples of previous relevant work should be provided as well.
3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
6. Proposals must be received prior to the **14 Apr 2023** to be considered. Proposals should be submitted to **savi@gpsnr.org** for consideration.
7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.
### ****Project Timelines****
Proposal Publishing date
17 Mar 2023
Proposals submitted by consultant to [stefano.savi@gpsnr.org](mailto:stefano.savi@gpsnr.org)
14 Apr 2023
Selection of Top Bidders / Notification to Unsuccessful Bidders
21 Apr 2023
Contract Award / Notification to Unsuccessful Bidders
28 April 2023
First consultation with Policy Toolbox Working Group
3 May 2023
Final Report + Deliverable submission
16 June 2023
(if needed) Closing meeting with the Working Group
18 June 2023
### **Budget**
The Platform is anticipating that a total budget of no more than $10,000 USD be allocated to this engagement with an additional amount available to support approved travel, if
necessary.
Payment terms shall be:
· 20% at the signing of the contract
· 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan.
· 50% on delivery of the final report
The allocation of the payment shall be based on the net amount after travel
expenses, if deemed necessary by both the consultant and Secretariat, are
incurred and documented.
**Evaluation Factors**
GPSNR will rate proposals based on the following factors, with cost being the most important factor:
1. Responsiveness to the requirements set forth in this Request for Proposal
2. Relevant past performance/ experience
3. Samples of work
4. Cost, including an assessment of total cost of ownership.
5. Technical expertise/experience of bidder and bidder’s staff
GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.eforestation Regulation consolidated text 20-12-22
[
View RFP Document here
](https://rubberplatform.sharepoint.com/:b:/s/GPSNRMembers/EePve-c99CBJhsegB6psW5UB6BY0yLsTCJcc3Ta-8ODYXw?e=Grberg)
GPSNR Secretariat March 28, 2023