← Opportunities

Construction Management Services for Coastal Rail Trail Segment 12

Funder
Santa Cruz County Regional Transportation Commission (RTC) 🟡 Some evidence
Type / status
rfp · closed
Amount
—
Deadline
2026-03-30 (past)
“Closing Date: Monday, March 30, 2026, at 2:00 PM PDT”
Ecosystems
Categories
other
Tech stack
Apply
https://www.sccrtc.org/wp-content/uploads/2026/02/RFP-2605-Construction-Managment-for-Coastal-Rail-Trail-Segment-12-combined.pdf
Source
https://www.sccrtc.org/rfp-2605-construction-management-services-for-coastal-rail-trail-segment-12
Fit
5% · poor fit · The Venture23 Aleo team works on zk, privacy, and infrastructure in the Aleo ecosystem, which is entirely unrelated to construction management services for a coastal rail trail.
Trust
89% · model self-report 90% · first seen 2026-09-30 · v1
Verified
2026-09-30 · by extraction

The Santa Cruz County Regional Transportation Commission (RTC) is seeking qualified consultants to provide construction management services for Rail Trail Segment 12 in Aptos, CA. This RFP is open to experienced firms capable of overseeing construction activities, ensuring compliance with plans and specifications, and coordinating with stakeholders. Proposals must be submitted by the deadline, and interested parties should review the full RFP document and addenda for detailed requirements. Applications are to be submitted via the links provided in the solicitation.

Eligibility: Qualified and experienced consultants

Pipeline

Override status:

Funder track record · does Santa Cruz County Regional Transportation Commission (RTC) actually pay grants?

🟡 Some payout evidence · 11 grantees found · last payout 2025-11-06 · checked 2026-09-30 · 0 forum reports, 8 web pages read, 3 unverifiable claims dropped

Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.

GranteeAmountDateEvidence
multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos$15 million2025-11-06“Projects approved to receive $15 million include multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos; roadway rehabilitation projects on” source
roadway rehabilitation projects on Empire Grade, Bear Creek Road, and Casserly Road$15 million2025-11-06“Projects approved to receive $15 million include multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos; roadway rehabilitation projects on” source
priority METRO transit projects$15 million2025-11-06“Projects approved to receive $15 million include multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos; roadway rehabilitation projects on” source
Zero Emission Passenger Rail and Trail Project$2.8 million2025-11-05
page date
“To help with continued development of the Zero Emission Passenger Rail and Trail Project, commission staff recommended it reserve $2.8 million from the 2028 cycle of the State Transportation Improvement Program.” source
pavement maintenance and roadway rehabilitation projects on local roads$61.3 million2023-12-07“Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source
new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, Watsonville, Ben Lomond, and on Green Valley Road in the county$61.3 million2023-12-07“Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source
Complete Streets Improvement projects in the Felton-SLV Schools Complex area and the Bay Corridor in Santa Cruz$61.3 million2023-12-07“Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source
traffic signal priority for buses and Reimagine Metro Wave Service$61.3 million2023-12-07“Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source
pavement maintenance and roadway rehabilitation projects on local roads$11 million2021-12-02“Projects approved to receive $11 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bike and pedestrian facilities in Capitola, Santa Cruz, Scotts Valley, Watsonvill” source
new and upgraded bike and pedestrian facilities in Capitola, Santa Cruz, Scotts Valley, Watsonville, and on Soquel Avenue/Drive in the county$11 million2021-12-02“Projects approved to receive $11 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bike and pedestrian facilities in Capitola, Santa Cruz, Scotts Valley, Watsonvill” source
three bicycle and pedestrian safety and encouragement programs$350,0002020-02-06“The RTC programmed $350,000 in state Regional Surface Transportation Program Exchange (RSTPX) funds to three bicycle and pedestrian safety and encouragement programs at its February 6, 2020 meeting.” source
31 projects$22 million2017-12-07“Following a public hearing at its December 7, 2017 meeting, the RTC approved 31 projects to receive $22 million from the region’s formula shares of state and federal funds as part of its adoption of the 2018 Regional Tra” source

Trust breakdown (3/3 checkable facts verified)

SignalWeightResultNote
deadline0.35100%quoted in source
apply link0.075100%link in source
funder0.075100%named in source
source quality0.1550%social or search hit
model confidence0.190%model self-report

Fit breakdown (against the ORG_* profile)

SignalWeightResultNote
model fit0.510%model rated 10%
ecosystem overlap0.250%none vs aleo
category overlap0.150%other vs zk, privacy, infra, dev_tooling, security, interoperability
tech overlap0.10%none vs rust, leo, zk

Sources (1)

RoleDocumentFromFetched
primaryRFP: 2605 Construction Management Services for Coastal Rail Trail Segment 12 - SCCRTCWeb discovery: ecosystem sweep2026-09-30

History (1)

vChangedFields
12026-09-30created

Extracted text

RFP: 2605 Construction Management Services for Coastal Rail Trail Segment 12 - SCCRTC                                                                       [Skip to content](#content)

# RFP: 2605 Construction Management Services for Coastal Rail Trail Segment 12

Modified 8 months ago|Published February 12, 2026|[Active Solicitations](https://www.sccrtc.org/category/active/)

**Issue Date: Thursday, February 12, 2026**  
**Closing Date: Monday, March 30, 2026, at 2:00 PM PDT**

The Santa Cruz County Regional Transportation Commission (RTC) invites qualified and experienced consultants to submit proposals for Construction Management Services for Rail Trail Segment 12 in Aptos, CA.

On February 25, 2026, the RTC issued [Addendum No. 1](https://www.sccrtc.org/wp-content/uploads/2026/02/RFP-2605-Addendum-No.-1_signed.pdf) for this project, updating the Proposed Procurement Schedule for the RFP. The date for Proposals Due and the (Optional) Interview Short Listed Consultants has been changed to Monday, March 30, 2026 at 2:00PM and Tuesday, April 14, 2026.

A pre-proposal meeting was held via Zoom on Thursday, February 26, 2026 at 1:00 PM. The pre-proposal meeting attendee list is available at this [link](https://www.sccrtc.org/wp-content/uploads/2026/03/RFP-2605-Pre-Proposal-Meeting-List-of-Attendees.docx.pdf).

On March 4, 2026, the RTC issued [Addendum No. 2](https://www.sccrtc.org/wp-content/uploads/2026/03/RFP-2605-Addendum-No.-2-signed-1.pdf) for this project, providing a working hyperlink and replacing pages A-1 through Attachment A-35.

On March 10, 2026, the RTC provided responses to initial questions submitted by potential proposers. On March 19, 2026, RTC provided an updated [document](https://www.sccrtc.org/wp-content/uploads/2026/03/RFP-2605-Questions-Submitted-by-Potential-Proposers.docx-1.pdf) with responses to additional question submitted by potential proposers. Per the RFP, the deadline for submitting additional questions, requests for clarifications or exceptions to RFP requirements was 12:00 PM on Friday, March 13, 2026.

[Request for Proposals](https://www.sccrtc.org/wp-content/uploads/2026/02/RFP-2605-Construction-Managment-for-Coastal-Rail-Trail-Segment-12-combined.pdf)

Below are the links to the 95% PS&E plan sheets.

[95% Rail Trail Structure Plans](https://www.sccrtc.org/wp-content/uploads/2026/02/95-Rail-Trail-Structure-Plans.pdf)  
[95% Rail Trail Civil Plans](https://www.sccrtc.org/wp-content/uploads/2026/02/95-Rail-Trail-Civil-Plans.pdf)

### Subscribe to our Mailing List

Latest news and up-to-date info delivered to your inbox

[SIGN UP](https://sccrtc.org/about/esubscriptions/)

### Report a Hazard

Notify us of obstacles or hazards that may inhibit travel.

[REPORT HAZARD](/services/hazard-reports/)

![rtc logo white](data:image/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg== "rtc logo white")

1101 Pacific Ave. Suite 250  
Santa Cruz, CA 95060

 [](#) [](#)[](#)

**(831) 460-3200**  
[info@sccrtc.org](mailto:info@sccrtc.org)

Scroll to Top

X