Construction Management Services for Coastal Rail Trail Segment 12
The Santa Cruz County Regional Transportation Commission (RTC) is seeking qualified consultants to provide construction management services for Rail Trail Segment 12 in Aptos, CA. This RFP is open to experienced firms capable of overseeing construction activities, ensuring compliance with plans and specifications, and coordinating with stakeholders. Proposals must be submitted by the deadline, and interested parties should review the full RFP document and addenda for detailed requirements. Applications are to be submitted via the links provided in the solicitation.
Eligibility: Qualified and experienced consultants
Pipeline
Funder track record · does Santa Cruz County Regional Transportation Commission (RTC) actually pay grants?
🟡 Some payout evidence · 11 grantees found · last payout 2025-11-06 · checked 2026-09-30 · 0 forum reports, 8 web pages read, 3 unverifiable claims dropped
Proven payer: at least 3 named grantees and one payout in the last 90 days. Every grantee below is quoted word for word from its source. When a source does not date a grant, the date is when that page or post was published.
| Grantee | Amount | Date | Evidence |
|---|---|---|---|
| multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos | $15 million | 2025-11-06 | “Projects approved to receive $15 million include multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos; roadway rehabilitation projects on” source |
| roadway rehabilitation projects on Empire Grade, Bear Creek Road, and Casserly Road | $15 million | 2025-11-06 | “Projects approved to receive $15 million include multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos; roadway rehabilitation projects on” source |
| priority METRO transit projects | $15 million | 2025-11-06 | “Projects approved to receive $15 million include multimodal complete streets and road rehabilitation projects in Capitola, Scotts Valley, Watsonville, and on Soquel Drive through Aptos; roadway rehabilitation projects on” source |
| Zero Emission Passenger Rail and Trail Project | $2.8 million | 2025-11-05 page date | “To help with continued development of the Zero Emission Passenger Rail and Trail Project, commission staff recommended it reserve $2.8 million from the 2028 cycle of the State Transportation Improvement Program.” source |
| pavement maintenance and roadway rehabilitation projects on local roads | $61.3 million | 2023-12-07 | “Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source |
| new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, Watsonville, Ben Lomond, and on Green Valley Road in the county | $61.3 million | 2023-12-07 | “Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source |
| Complete Streets Improvement projects in the Felton-SLV Schools Complex area and the Bay Corridor in Santa Cruz | $61.3 million | 2023-12-07 | “Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source |
| traffic signal priority for buses and Reimagine Metro Wave Service | $61.3 million | 2023-12-07 | “Projects approved to receive $61.3 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bicycle/pedestrian facilities projects in Capitola, Santa Cruz, Scotts Valley, ” source |
| pavement maintenance and roadway rehabilitation projects on local roads | $11 million | 2021-12-02 | “Projects approved to receive $11 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bike and pedestrian facilities in Capitola, Santa Cruz, Scotts Valley, Watsonvill” source |
| new and upgraded bike and pedestrian facilities in Capitola, Santa Cruz, Scotts Valley, Watsonville, and on Soquel Avenue/Drive in the county | $11 million | 2021-12-02 | “Projects approved to receive $11 million include pavement maintenance and roadway rehabilitation projects on local roads, new and upgraded bike and pedestrian facilities in Capitola, Santa Cruz, Scotts Valley, Watsonvill” source |
| three bicycle and pedestrian safety and encouragement programs | $350,000 | 2020-02-06 | “The RTC programmed $350,000 in state Regional Surface Transportation Program Exchange (RSTPX) funds to three bicycle and pedestrian safety and encouragement programs at its February 6, 2020 meeting.” source |
| 31 projects | $22 million | 2017-12-07 | “Following a public hearing at its December 7, 2017 meeting, the RTC approved 31 projects to receive $22 million from the region’s formula shares of state and federal funds as part of its adoption of the 2018 Regional Tra” source |
Trust breakdown (3/3 checkable facts verified)
| Signal | Weight | Result | Note |
|---|---|---|---|
| deadline | 0.35 | 100% | quoted in source |
| apply link | 0.075 | 100% | link in source |
| funder | 0.075 | 100% | named in source |
| source quality | 0.15 | 50% | social or search hit |
| model confidence | 0.1 | 90% | model self-report |
Fit breakdown (against the ORG_* profile)
| Signal | Weight | Result | Note |
|---|---|---|---|
| model fit | 0.5 | 10% | model rated 10% |
| ecosystem overlap | 0.25 | 0% | none vs aleo |
| category overlap | 0.15 | 0% | other vs zk, privacy, infra, dev_tooling, security, interoperability |
| tech overlap | 0.1 | 0% | none vs rust, leo, zk |
Sources (1)
| Role | Document | From | Fetched |
|---|---|---|---|
| primary | RFP: 2605 Construction Management Services for Coastal Rail Trail Segment 12 - SCCRTC | Web discovery: ecosystem sweep | 2026-09-30 |
History (1)
| v | Changed | Fields |
|---|---|---|
| 1 | 2026-09-30 | created |
Extracted text
RFP: 2605 Construction Management Services for Coastal Rail Trail Segment 12 - SCCRTC [Skip to content](#content) # RFP: 2605 Construction Management Services for Coastal Rail Trail Segment 12 Modified 8 months ago|Published February 12, 2026|[Active Solicitations](https://www.sccrtc.org/category/active/) **Issue Date: Thursday, February 12, 2026** **Closing Date: Monday, March 30, 2026, at 2:00 PM PDT** The Santa Cruz County Regional Transportation Commission (RTC) invites qualified and experienced consultants to submit proposals for Construction Management Services for Rail Trail Segment 12 in Aptos, CA. On February 25, 2026, the RTC issued [Addendum No. 1](https://www.sccrtc.org/wp-content/uploads/2026/02/RFP-2605-Addendum-No.-1_signed.pdf) for this project, updating the Proposed Procurement Schedule for the RFP. The date for Proposals Due and the (Optional) Interview Short Listed Consultants has been changed to Monday, March 30, 2026 at 2:00PM and Tuesday, April 14, 2026. A pre-proposal meeting was held via Zoom on Thursday, February 26, 2026 at 1:00 PM. The pre-proposal meeting attendee list is available at this [link](https://www.sccrtc.org/wp-content/uploads/2026/03/RFP-2605-Pre-Proposal-Meeting-List-of-Attendees.docx.pdf). On March 4, 2026, the RTC issued [Addendum No. 2](https://www.sccrtc.org/wp-content/uploads/2026/03/RFP-2605-Addendum-No.-2-signed-1.pdf) for this project, providing a working hyperlink and replacing pages A-1 through Attachment A-35. On March 10, 2026, the RTC provided responses to initial questions submitted by potential proposers. On March 19, 2026, RTC provided an updated [document](https://www.sccrtc.org/wp-content/uploads/2026/03/RFP-2605-Questions-Submitted-by-Potential-Proposers.docx-1.pdf) with responses to additional question submitted by potential proposers. Per the RFP, the deadline for submitting additional questions, requests for clarifications or exceptions to RFP requirements was 12:00 PM on Friday, March 13, 2026. [Request for Proposals](https://www.sccrtc.org/wp-content/uploads/2026/02/RFP-2605-Construction-Managment-for-Coastal-Rail-Trail-Segment-12-combined.pdf) Below are the links to the 95% PS&E plan sheets. [95% Rail Trail Structure Plans](https://www.sccrtc.org/wp-content/uploads/2026/02/95-Rail-Trail-Structure-Plans.pdf) [95% Rail Trail Civil Plans](https://www.sccrtc.org/wp-content/uploads/2026/02/95-Rail-Trail-Civil-Plans.pdf) ### Subscribe to our Mailing List Latest news and up-to-date info delivered to your inbox [SIGN UP](https://sccrtc.org/about/esubscriptions/) ### Report a Hazard Notify us of obstacles or hazards that may inhibit travel. [REPORT HAZARD](/services/hazard-reports/)  1101 Pacific Ave. Suite 250 Santa Cruz, CA 95060 [](#) [](#)[](#) **(831) 460-3200** [info@sccrtc.org](mailto:info@sccrtc.org) Scroll to Top X